0% found this document useful (0 votes)
68 views2 pages

API Tank Repairs Scopes

Uploaded by

S4TU2N 33N0M4
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
68 views2 pages

API Tank Repairs Scopes

Uploaded by

S4TU2N 33N0M4
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Task Name

KIMBE TANK 10 (ADF) NDT, Calibration & Refurbishment Works


Kimbe Tank 10 Planning & Engineering
Issue Tenders - Inspection & Calibration
Receive Tenders, Quotes - Inspection & Calibration
Tender Review & Award Tender - Inspection & Calibration
Issue PO to Contractor - Inspection & Calibration
Contractor mobilisation to Site - Inspection & Calibration
Issue Tenders - Refurbishment & Painting Works
Receive Tenders, Quotes - Refurbishment & Painting Works
Tender Review & Award Tender - Refurbishment & Painting Works
Issue PO to Contractor - Refurbishment & Painting Works
Contractor mobilisation to Site - Refurbishment & Painting Works
Kimbe Tank 10 Planning & Engineering Complete
Kimbe Tank 10 Preparation
Tank product Drawdown (exhaustion) & Pump out (Create sludge/waste collection area
Tank Isolation & Decommissioning
Isolation of service line and ship’s line
TMS to terminate Tank (not to account for tank levels)
Tank Attachments Removal -Valves, Spools, etc
Flush tank from outside
Tank Gas Freeing & Testing
Issue of Permits - CSE, Cold Work, etc
Tank Internal Cleaning - Tank Cleaning Team
Tank Internals Disconnection & Removal
Contractors Inductions
Issue of Permits to Contractors - GW, HZW, CSE, WAH, etc
Kimbe Tank 10 Preparation Complete
Kimbe Tank 10 Full Off-Stream Inspection
Floor inspection using MFL Floorscanner scanner and Ultrasonic testing
Ultrasonic thickness readings on shell and roof
Full external visual inspection
Tilt, Settlement and Floor Gradient surveys
Magnetic Particle inspection of floor to shell circumferential welds (internal and/or external)
Vacuum Box testing of floor welds (if free from paint/scale), as required
Ultrasonic thickness measurements of heating coils/piping/other (specify)
A preliminary report shall be provided if any critical deficiencies are identified during the course of the
inspections with full report to be submitted within 10 days of demobilization
Kimbe Tank 10 Full Off-Stream Inspection Complete
Kimbe Tank 10 Calibration
Tank calibration using the Trimble ™ 3D Laser Scanning system
Tilt, Settlement and Floor Gradient surveys
General HouseKeeping & Manpower/Equipments Demobilisation
Kimbe Tank 10 Calibration Complete
Kimbe Tank 10 Refurbishment Works
Servicing Tank Valves, Vents, and Varec gauge, & PRV
Issue of Permits - GW, HZS, CSE, Hotwork, WAH, etc
Rectify any other tank defects identified by NDT Inspections
Pad weld deeply pitted areas on the tank floor plates and shell walls if any identified by NDT Inspections
Weld doubler plates onto the top face of the floor areas identified of significant thinning. Doubler plate to be
300 x 300 x 6mm thick, unless specified by the NDT Inspection Report
Scrape clean & recoat body of the tank valves which have been subjected to environmental conditions
resulting in surface coating breakdown over the years
Scrape clean & recoat existing corroded stairway treads and handrail sections leading up to the tank roof
Repairing of Internal Pipeworks – DN80/DN100 & DN40/DN50 Pipe x XX meters long each or Replace if
worn
Repairing of Dip Plate and its Fittings or Replace if worn
Sand Blasting & Painting of Tank internal floor plates XX diameter including first strake wall 1.5 meters high.
Sandblasting & Painting of Internal Shell Nozzle (Inlet deflector) – Spool Piece
Work with Puma Terminal Staff to box up tank. Ensure tank is fully mech. Commissioned_Fit-up internal
pipeworks (product & water drain line), dip plate, side bott manhole covers x2, shell nozzles & valves, all roof
Write new dates for tank cleaning & NDT/Calibration tank shell (bott manhole). Also mark new reference
hatches, blank nozzle covers & vents
height & safe fill height on tank shell beside sight gauge & top of tank next to dip hatch. PE to provide all infor as
required for sign writing.
Kimbe Tank 10 Refurbishment Works Complete
Kimbe Tank 10 Box Up & Commissioning
Reinstate Tank Attachments (Valves, Piping, Nozzles, Accessories, etc)
Reinstate Manhole Covers and Hatches
Leak Test (on all pipeworks)
Fix any leaks from pressure test
Commission Tank
General Housekeeping & Demobilisation
Restore Tank to TMS
Handover tank to Operations
Kimbe Tank 10 Box Up & Commissioning Complete
KIMBE TANK 10 NDT, Calibration & Refurbishment Works Complete