Summary Sheet for BoQ Schedule
Project: Residence Ceiling Work
Work Area: A/A
Date: 15/02/2024
LOCATION : - Addis Ababa
Item Description AMOUNT
Works Description
Item
A. Super Structure
1 Ceiling Work 9,435,761.52
Sub-total Carried To Summary 9,435,761.52
Total 9,435,761.52
Ceiling Takeoff Sheet
Takeoff No.1
X DIM Qty Unit DESCRIPTION
A. Super Structure
I.Ceiling Work
2th to 12th floor Dembel side
1 9.70 living area
4.81 46.66
1 1.60
4.04 6.46
1 3.50 curtain
0.25 0.88
1 5.30 M.bed room
4.60 24.38
1 1.80 curtain
0.25 0.45
1 3.32 W.Clothet
2.30 7.64
1 4.93 bed room 1
3.30 16.27
1 1.80 curtain
0.25 0.45
1 3.72 bed room 2
3.30 12.28
1 1.80 curtain
0.50 0.90
1 3.42 kitchen
4.00 13.68
1 2.36 curtain
0.25 0.59
1 1.40 kitchen store
1.57 2.20
1 1.40 store 2
1.60 2.24
1 3.30 maids room
1.80 5.94
1 1.10 corridors
5.95 6.55
1 5.50 corridors
1.50 8.25
1 1.70 corridors
3.50 5.95
1 1.36 corridors
1.60 2.18
-1 0.16 Ded
0.90 (0.14)
-1 0.55 Ded
0.15 (0.08)
-1 0.46 Ded
0.10 (0.05)
-1 1.00 Ded
0.65 (0.65)
TOILETS AREA
TOTAL AREA 163.03
2th to 12th floor Dibora side .
1 9.70 living area
4.80 46.56
1 1.59
4.04 6.42
1 3.50 curtain
0.21 0.74
1 5.30 M.bed room
4.60 24.38
1 1.80 curtain
0.21 0.38
1 3.32 W.Clothet
2.10 6.97
1 4.83 bed room 1
3.23 15.60
1 1.80 curtain
0.21 0.38
1 3.72 bed room 2
3.30 12.28
1 1.80 curtain
0.50 0.90
-1 3.42 kitchen
4.00 (13.68)
1 2.36 curtain
0.21 0.50
1 1.40 kitchen store
1.57 2.20
1 1.40 store 2
1.60 2.24
1 3.30 maids room
1.80 5.94
1 1.10 corridors
5.95 6.55
1 5.50 corridors
1.50 8.25
1 1.70 corridors
3.50 5.95
1 1.36 corridors
1.60 2.18
-1 0.16 Ded
0.90 (0.14)
-1 0.55 Ded
0.15 (0.08)
-1 0.46 Ded
0.10 (0.05)
-1 1.00 Ded
0.65 (0.65)
TOILETS AREA
TOTAL AREA 133.82
9th and 6th
1 9.60 living area
4.80 46.08
1 1.52
4.04 6.14
1 17.00 bed room design droop
0.50 8.50
1 3.50 curtain
0.25 0.88
1 5.30 M.bed room
4.60 24.38
1 1.80 curtain
0.25 0.45
1 3.32 W.Clothet
2.30 7.64
1 4.93 bed room 1
3.30 16.27
1 12.00 bed room design droop
0.50 6.00
1 1.80 curtain
0.25 0.45
1 3.72 bed room 2
3.30 12.28
1 12.00 bed room design droop
0.50 6.00
1 1.80 curtain
0.50 0.90
-1 3.42 kitchen
4.00 (13.68)
1 2.36 curtain
0.25 0.59
1 1.40 kitchen store
1.57 2.20
1 1.40 store 2
1.60 2.24
1 3.30 maids room
1.80 5.94
1 1.10 corridors
5.95 6.55
1 5.50 corridors
1.50 8.25
1 1.70 corridors
3.50 5.95
1 1.36 corridors
1.60 2.18
-1 0.16 Ded
0.90 (0.14)
-1 0.55 Ded
0.15 (0.08)
-1 0.46 Ded
0.10 (0.05)
-1 1.00 Ded
0.65 (0.65)
TOILETS AREA
TOTAL AREA 155.27
0
Project: Residence Ceiling
Work Area: A/A Bole Agober site
dembel dibora
Item Description
unit side side
Description of works
A. Super Structure
I. Ceiling Work
1.0 2nd Floor
a ) Gypsum Board frame and plastering m2 162.13 163.03
2.0 3rd Floor
a ) Gypsum Board frame and plastering m2 162.13 163.03
3.0 4th Floor
a ) Gypsum Board frame and plastering m2 162.13 163.03
4.0 5th Floor
a ) Gypsum Board frame and plastering m2 162.13 163.03
5.0 6th Floor
a ) Gypsum Board frame and plastering m2 155.27 163.03
6.0 7th Floor
a ) Gypsum Board frame and plastering m2 162.13 163.03
7.0 8th Floor
a ) Gypsum Board frame and plastering m2 162.13 163.03
8.0 9th Floor
a ) Gypsum Board frame and plastering m2 155.27 163.03
9.0 10th Floor
a ) Gypsum Board frame and plastering m2 162.13 163.03
10.0 11th Floor
a ) Gypsum Board frame and plastering m2 0.00 163.03
11.0 12th Floor
a ) Gypsum Board frame and plastering m2 162.13 162.13
12.0 12th Floor
a ) Gypsum Board frame and plastering m2 162.13 162.13
13.0 7,10, 12 th Floor corner frame m2
a ) Gypsum Board frame and plastering 450.00
Total Carried To Summary
Unit Rate Amount
-
2,511.87 816,749.60
2,511.87 816,749.60
2,511.87 816,749.60
2,511.87 816,749.60
2,511.87 799,508.13
2,511.87 816,749.60
2,511.87 816,749.60
2,511.87 799,508.13
2,511.87 816,749.60
2,511.87 409,500.12
2,511.87 814,498.97
2,511.87 814,498.97
180.00 81,000.00
9,435,761.52