0% found this document useful (0 votes)
29 views7 pages

Ceiling Work Summary for Agober Project

Uploaded by

kidus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views7 pages

Ceiling Work Summary for Agober Project

Uploaded by

kidus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Summary Sheet for BoQ Schedule

Project: Residence Ceiling Work


Work Area: A/A
Date: 15/02/2024
LOCATION : - Addis Ababa

Item Description AMOUNT

Works Description
Item
A. Super Structure
1 Ceiling Work 9,435,761.52
Sub-total Carried To Summary 9,435,761.52

Total 9,435,761.52
Ceiling Takeoff Sheet
Takeoff No.1
X DIM Qty Unit DESCRIPTION

A. Super Structure
I.Ceiling Work
2th to 12th floor Dembel side
1 9.70 living area
4.81 46.66
1 1.60
4.04 6.46
1 3.50 curtain
0.25 0.88
1 5.30 M.bed room
4.60 24.38
1 1.80 curtain
0.25 0.45
1 3.32 W.Clothet
2.30 7.64
1 4.93 bed room 1
3.30 16.27
1 1.80 curtain
0.25 0.45
1 3.72 bed room 2
3.30 12.28
1 1.80 curtain
0.50 0.90
1 3.42 kitchen
4.00 13.68
1 2.36 curtain
0.25 0.59
1 1.40 kitchen store
1.57 2.20
1 1.40 store 2
1.60 2.24
1 3.30 maids room
1.80 5.94
1 1.10 corridors
5.95 6.55
1 5.50 corridors
1.50 8.25
1 1.70 corridors
3.50 5.95
1 1.36 corridors
1.60 2.18
-1 0.16 Ded
0.90 (0.14)
-1 0.55 Ded
0.15 (0.08)
-1 0.46 Ded
0.10 (0.05)
-1 1.00 Ded
0.65 (0.65)
TOILETS AREA
TOTAL AREA 163.03

2th to 12th floor Dibora side .


1 9.70 living area
4.80 46.56
1 1.59
4.04 6.42
1 3.50 curtain
0.21 0.74
1 5.30 M.bed room
4.60 24.38
1 1.80 curtain
0.21 0.38
1 3.32 W.Clothet
2.10 6.97
1 4.83 bed room 1
3.23 15.60
1 1.80 curtain
0.21 0.38
1 3.72 bed room 2
3.30 12.28
1 1.80 curtain
0.50 0.90
-1 3.42 kitchen
4.00 (13.68)
1 2.36 curtain
0.21 0.50
1 1.40 kitchen store
1.57 2.20
1 1.40 store 2
1.60 2.24
1 3.30 maids room
1.80 5.94
1 1.10 corridors
5.95 6.55
1 5.50 corridors
1.50 8.25
1 1.70 corridors
3.50 5.95
1 1.36 corridors
1.60 2.18
-1 0.16 Ded
0.90 (0.14)
-1 0.55 Ded
0.15 (0.08)
-1 0.46 Ded
0.10 (0.05)
-1 1.00 Ded
0.65 (0.65)
TOILETS AREA
TOTAL AREA 133.82

9th and 6th


1 9.60 living area
4.80 46.08
1 1.52
4.04 6.14
1 17.00 bed room design droop
0.50 8.50
1 3.50 curtain
0.25 0.88
1 5.30 M.bed room
4.60 24.38
1 1.80 curtain
0.25 0.45
1 3.32 W.Clothet
2.30 7.64
1 4.93 bed room 1
3.30 16.27
1 12.00 bed room design droop
0.50 6.00
1 1.80 curtain
0.25 0.45
1 3.72 bed room 2
3.30 12.28
1 12.00 bed room design droop
0.50 6.00
1 1.80 curtain
0.50 0.90
-1 3.42 kitchen
4.00 (13.68)
1 2.36 curtain
0.25 0.59
1 1.40 kitchen store
1.57 2.20
1 1.40 store 2
1.60 2.24
1 3.30 maids room
1.80 5.94
1 1.10 corridors
5.95 6.55
1 5.50 corridors
1.50 8.25
1 1.70 corridors
3.50 5.95
1 1.36 corridors
1.60 2.18
-1 0.16 Ded
0.90 (0.14)
-1 0.55 Ded
0.15 (0.08)
-1 0.46 Ded
0.10 (0.05)
-1 1.00 Ded
0.65 (0.65)
TOILETS AREA
TOTAL AREA 155.27
0
Project: Residence Ceiling
Work Area: A/A Bole Agober site

dembel dibora
Item Description
unit side side
Description of works

A. Super Structure

I. Ceiling Work
1.0 2nd Floor
a ) Gypsum Board frame and plastering m2 162.13 163.03
2.0 3rd Floor
a ) Gypsum Board frame and plastering m2 162.13 163.03
3.0 4th Floor
a ) Gypsum Board frame and plastering m2 162.13 163.03
4.0 5th Floor
a ) Gypsum Board frame and plastering m2 162.13 163.03
5.0 6th Floor
a ) Gypsum Board frame and plastering m2 155.27 163.03
6.0 7th Floor
a ) Gypsum Board frame and plastering m2 162.13 163.03
7.0 8th Floor
a ) Gypsum Board frame and plastering m2 162.13 163.03
8.0 9th Floor
a ) Gypsum Board frame and plastering m2 155.27 163.03
9.0 10th Floor
a ) Gypsum Board frame and plastering m2 162.13 163.03
10.0 11th Floor
a ) Gypsum Board frame and plastering m2 0.00 163.03
11.0 12th Floor
a ) Gypsum Board frame and plastering m2 162.13 162.13
12.0 12th Floor
a ) Gypsum Board frame and plastering m2 162.13 162.13
13.0 7,10, 12 th Floor corner frame m2
a ) Gypsum Board frame and plastering 450.00
Total Carried To Summary
Unit Rate Amount

-
2,511.87 816,749.60

2,511.87 816,749.60

2,511.87 816,749.60

2,511.87 816,749.60

2,511.87 799,508.13

2,511.87 816,749.60

2,511.87 816,749.60

2,511.87 799,508.13

2,511.87 816,749.60

2,511.87 409,500.12

2,511.87 814,498.97

2,511.87 814,498.97

180.00 81,000.00
9,435,761.52