0% found this document useful (0 votes)
1K views17 pages

Scissor Lift Checklist

scissor lift Checklist

Uploaded by

loganathan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
1K views17 pages

Scissor Lift Checklist

scissor lift Checklist

Uploaded by

loganathan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 17
Honeywel Doc. No. BAINO-HSEMS 3-243-02-1 | Rev. Ho. BA India-HSEMS Date of revision 19-03-2024 z TITLE- Scissor Lift Inspection Checklist ‘Month of Inspection Tune Frequency of Insp. | As and when use Site Name Jasmin Location Ebsuy Note:(Ok-\ Not Ok- X) SrNo| Photo Check Point ves | No Remarks ‘Make sure Scissor lifts examined and tested by the = in competent person and valid test certificate is available. wt a Ensure competent person is operating the scissor lift & competency certificate is available. wae 3 Ensure SWL is displayed on the scissor a Ensure the Gate and platform isn good working ‘| Br lane we Ensure the lever, controls and emergency stop switch are = In good working condition. va ~AZAA> | Ensure the pivots, connecting rods and pin are in good S | ee z i" \ condition. Ensure the hydraulic cylinder is in good condition & free = ~ | ie | eee = Ensure the tyres, wheels, breaks are in good = Ensure the battery, water level, motor/ uw pump unit, vent caps, hydraulic reservoir uu 5 Ensure scissor arms and sliding wear pads working condition. Date of Inspection Mele clas Honeywe' Doc. No. BA IND-HSEMS 3-243-02-1, Rev. No. BA IndiasHSEMS Date of revision 39.03.2028 r TITLE- Scissor Lift Inspection Checklist Month of inspection Fane Frequency of Insp. | As and when use ‘Site Name Tasmine Location Posin” [inspected By (Name & Signature) HR ev Zoltar Honeywe'l Doc. No. BAIND-HSEMS 3-243-02-1 | Rey, No. BA India-HSEMS Date of revision 19.03-2024 1 TITLE- Scissor Lift Inspection Checklist Month of Inspection: Tune Frequency of Insp. ‘As and when use ‘Site Name TAsmine Location Hosuy. Note:(Ok-V_ Not Ok- X) SrNo| Photo Check Point yes | No Remarks ‘Make sure Scissor lift Is examined and tested by the a competent person and valid test certificate is available. : ants coupe poms peg he a scissor lift & competency certificate is available. wv 3 Ens Se dpayed on the cor ee Ensure the Gte ae platorm goed wortng | a le — : id Uva alii cnoremiymassinendne’| o> s ‘in good working condition. BRE | errs eps connecing i and pn arein good | EEF | conation ae from leakage or damage. cS 7 | ESR [mre ne arautceynder isn good conden ates | o> as ita 9 Ensure the limit switch is in good working condition. < Ensure the tyres, wheels, breaks are in good a” working condition. a = Ensure the battery, water level, motor/ ct ump unit, vent caps, hydraulic reservoir are in good working condition, ne BeSeie. | Ensure scissor arms and sliding wear pads oe a are in good condition. 7 Ensure front horn & reverse horn is in good ae working condition. Date of inspection 2 1oe [g0a4 Honeywe' Doc. No. BAIND-HSEMS 3-243-02-1 | Rev. No. BA India-HSEMS Date of revision 19-03-2024 1 TITLE- Scissor Lift Inspection Checklist Month of Inspection Tune Frequency of Insp. | As and when use Site Name TEPL- TAIN NE | Location Hasuve [inspected By (Wame & Signature) BEET EV LA Honeywell Doe. No. BAIND-HSEMS 3-243-02-1_ | Rev. No. BA India-HSENS Date of revision 19-03-2028 1 TITLE- Scissor Lift Inspection Checklist Month of Inspection ane. Frequency of Insp. | As and when use Site Name TG OVE Location Hosur Note:(Ok-V_Not Ok= X) SrNo| Photo Check Point ves | No Remarks ‘Make sure Scissor lifts examined and tested by the 7 competent person and valid test certificate is available. | ~~ : Ensure competent person is operating the = scissor lift & competency certificate available. 3 Ensure SWLis displayed on the scissor lift wa Ensure the Gate and platform isin good working «| Br lie uy Ensure the lever, controls and emergency stop switch are s in good working condition. “ P Se Ensure the pivots, connecting rods and pin are in good | ae des ‘ condition. neva ted vi < ndtiee Bae Sten Ensure the hydraulic cylinder isin good condition & free 7 a from leakage or damage. a 9 Ensure the limit switch i in good working condition. i= & Ensure the tyres, wheels, breaks are in good a working condition. oe a Ensure the battery, water level, motor/ a pump unit, vent caps, hydraulic reservoir are in good working condition. tee = Ensure scissor arms and sliding wear pads Ensure front horn & reverse hor Is In good = working condition. ae Date of inspection 26 OC (oug Honeywe! BA India-HSEMS Doc. No. BA IND-HSEMS 3-243-D2-1 Date of revision 19-03-2024 TITLE- Scissor Lift Inspection Checklist Month of inspection Jane Frequency of Insp. AS and when use Site Name Jasmine Location Hoa v [inspected By ame & Signature) GREET Vv I Ay — alder Honeywell Doe. No. BAIND-HSEMS 3-243-02-1 | Rev. No. BA India-HSEMS- Date of revision 19-03-2024 a TITLE. Scissor Lift Inspection Checklist Month of Inspection Frequency ofnsp. | Asand when use ‘Site Name iD Location Hosuv Note:(Ok-V_Not Ok- X) SrNo| Photo hack Point yes | No Remarks I ‘Make sure Scissor its examined and tested by the ‘competent person and valid test certificate is available, = Ensure competent person is operating the scissor lift & competency certificate is available. 3 Ensure SWLis displayed on the scissor lift Ensure the Gate and platform isin good working condition. Ensure the lever, controls and emergency stop switch are \} VYAIA 2 in good working condition. : Ensure the pivots, connecting rods and pin are in good a condition. Ensure the hydraulic cylinder is in good condition & free from lealiage or damage. Ensure the beacon light isin good working condition. Ensure the limit switch isin good working condition. Ensure the tyres, wheels, breaks are in good, 7 working condition, bE Rince Ensure the battery, water level, motor/ ee SEATA u ‘pump unit, vent caps, hydraulic reservoir are in good working coneition, Ensure scissor arms and sliding wear pads 2 are in good condition. Ensure front hom & reverse horn isn good 2B fee working condition. Dateofinspection 01/03 [2094 Honeywe Doc. No. BA IND-HSEMS 3-243-D2-1, Rev. No. BA Inda-HsEMS Date of revision 39-03-2028 z TITLE= Scissor Lift inspection Checklist Month of inspection aly Frequency ofinsp. | As and when use ‘Site Name Jashnine Location Hosuy [iapecsa by Rene Rata ELE — ee = condition, Honeywell Doe. No. BAIND-HSEMS 3-243-02-1 | Rev.No. | BA india-HSEMS Date of revision 19-03-2024 1 TINIE. Scissor Lift Inspection Checklist Month of Inspection aly Frequency oflnsp. | Asand when use Site Name Maine Location Hosuy = = Note:(Ok-V_Not Ok- X) stNo| Photo Cheek Point yes | No Remarks Y ‘Make sure Scissor lifts examined and tested by the ‘competent person and valid test certificate is available. : Ensure competent person is operating the scissor lift & competency certificate is available. 3 Ensure SWLis displayed on the scissor lift Ensure the Gate and platform isn good working 4 i condition. Ensure the lever, controls and emergency stop switch are 5 in good working condition. PEAK | ensure the plvots, connecting rods and pin are in good Ensure the hydraulic cylinder is in good condition & free K NSEXY SEIYY ‘working condition. was from leakage or damage. Se 8 Ensure the beacon light sin good working condition. i = Ensure the tyres, wheels, breaks are in good | working condition. a Ensure the battery, water level, motor/ u ‘pump unit, vent caps, hydraulic reservoir 4 are in good working condition. ae Ensure scissor arms and sliding wear pads oy are in good condition, Z Ensure front horn & reverse horn isin good ie Dateofinspection 02 J4/Q0aF Honeywell Doc. No. 8A IND-HSEMS 3-243-D2-_| Rev. No. BA India-HSEMS Date of revision 79-03-2028 z TITLE- Scissor Lift Inspection Checklist Month of Inspection Frequency of Insp. | As and when use ‘Site Name Jasmine Location Hosur Inspected By (Name & Signature) CB Ev Honeywell Doc. No. BAIND-HSEMS 3-243-02-1. | Rev. No. BA IndiaHseMs Date of revision 19.05-2024 1 TIntE- Scissor Lift Inspection Checklist ‘Month of inspection wal Frequency of Insp. ‘As and when use Site Name Tasmin€ Location Hosuy asec tr Note:(Ok-J_ Not Ok- X) 5 ‘SrNo Photo | Check Point: Yes No Remarks, 1 “Make sure Scissor lift is examined and tested by the. ma competent person and valid test certificate is availabe. 5 Ensure competent person is operating the a scissor lift & competency certificate is avalable. 3 Ensure SWLis displayed on the scissor lit. 4 Ensure the Gate and platform is in good working ae condition. ‘ Facute the lever, controls and emergency stop switch are : = in good working condition. oe? | é ABA | tncure the plvots, connecting rods and pin are in good uw LAF | conition. 7 | ER | Ener te hydrate vinder isn good conttion & free e S| Hui eahage ur damnage v 8 Ensure the limit switeh isn good working condition. ea in Ensure the tyres, wheels, breaks are in good a. oo es = Ensure the battery, water level, motor/ oe n ‘pump unit, vent eaps, hydraulic reservoir are in good working condition. i. 7 Ensure scissor arms and sliding wear pads 2 are in good condition. 7 Ensure front horn & reverse hor isin good working condition, omvofranaion 05109 Load Honeywell Doe. No. BA IND-HSEMS 3-243-D2-1 Rev. No. BA India HENS Date of revision 39-03-2024 z TITLE- Scissor Lift Inspection Checklist, ‘Month of Inspection Tul Frequency of Insp. | Asand when use ‘Site Name Jacroine Location Ho suy. inspected By (Name & Signature) Cathe Tv [ape Honeywell Doc. No. BA IND-HSEMS 3-243-02-1_ | Rev. No. BA India HSEMS Date of revision 19-03-2024 i TITLE- Scissor Lift Inspection Checklist Month of inspection Frequency of Insp. | As and when use Site Name Jasrfine Location’ Hosa, Note:(Ok-V_Not Ok- X) seNo| Photo check Point [ves | no Remarks a ‘Wake sure Sdssor lifts examined and tested by the ‘competent person and valid test certificate is available. 5 Ensure competent person is operating the z scissor lift & competency certificate is available. 3 Ensure SWLis displayed on the scissor lft. Ensure the Gate and platform isin good working condition, Ensure the lever, controls and emergency stop switch are in good working condition. «| we Ensure the pivots, connecting rods and pin are in good condition. 7 [ESE™ | sure ne art onders mgood condition & foe > age Ensure the tyres, wheels, breaks are in good working condition. Ensure the battery, water level, motor/ pump unit, vent caps, hydraulic reservoir are in good working condition. SEAT NATAL STUSEANININIG 3 Ensure scissor arms and sliding wear pads are in good condition. B Ensure front horn & reverse horn isin good working condition. \ IA Date of nspection 0 4]o5|a0a4 Honeywel Doc. No. BA IND-HSEMS 3-243-D2-1_ | Rev. No. BA India-HSEMS- Date of revision 19-03-2024 1 TITLE- Scissor Lift Inspection Checklist ‘Month of inspection Joby Frequoncy of Insp. | As and when use ‘Site Namo Fas rie ‘Location Posie 7 ooh [inspected By (Name & Signature) ett Aa Honeywell Doc. No. BAIND-HSEMS 3-243-02-1 | Rev. No. | BA India-HSEMS- Date of revision 19-03-2024 1 TITLE- Scissor Lift Inspection Checklist ‘Month of Inspection [Jak Frequency of Insp. ‘As and when use a Site Name. [Jasrline Location Hosav al Note:(Ok-v_Not Ok- X) Se No ‘Check Point yes | No Remarks ‘Make sure Scissor lft is examined and tested by the = 2 competent person and valid test certificate is available. Ensure competent person is operating the wy, 2) scissor lift & competency certificate is available. 3 Ensure SWL is displayed on the scissor lift. al Ensure the Gate and platform isin good working 2 e condition. Ensure the lever, controls and emergency stop switch are S in good working condition. CA . Ensure the pivots, connecting rods and pin are ingood | _/ condition. > Ensure the hydraulic cylinder is in good condition & free 7 | SEER | tromiestageortamage ee © | RRR ee teeta nsonigcotin | ' Ensure the limit switch is in good working condition. a“ | Ensure the tyres, wheels, breaks are in good De » | working condition. = Ensure the battery, water level, motor/ 7 u ‘pump unit, vent aps, hydraulic reservoir are in good working condition. a Ensure scis is ae ure scissor arms and sliding wear pod: “= are in good condition. Enzure front hom & reverse horn isin good i working condition. sitll [Date of nspection 05 [o-7lquad Doc. No. BAIND-HSEMS 3-243-02-1 | Rev. No. Date of revision 19-03-2024 ra TITLE- Scissor Lift Inspection Checklist ‘Month of Inspection Tay Frequency of Insp, __| As and when use Site Name Tasmine Location a [ Note:(Ok-V_Not Ok- X) No] Photo Check Point Yes | No Remarks ‘Make sure Scissor lifts examined and tested by the 7 ‘competent person and valid test certificate is avalable. Ensure competent person is operating the 2a scissor lft & competency certificate Is available, 3 | Ensure SWL is displayed on the scissor lit. Ensure the Gate and platform isin good working condition. Ensure the lever, controls and emergency stop switch are Ti youd! working connlitivn, {Ensure the pivots, connecting rods and pin are in good condition, SEMIAT SY AEN working condition. | | ESE | kos te hyarutc yinder isn good condition & tee cee _| trom leakage or damage. 9 Ensure the limit switch isin good working condition. ~ Ensure the tyres, wheels, breaks are in good a0. working condition. = Ensure the battery, water level, motor/ | 1. pump unit, vent caps, hydraulic reservoir oe are in good working condition. = Ensure scissor arms and sliding wear pads a ne are in good condition. insure front horn & reverse hom isin good a3 8 Zz Date of Inspection 0609 |addg Seress Noige (ae comin col whle clestendie - i: Honeywell Doc. No. BA IND-HSEMS 3-243-02-1_ | Rev.No, | BA India-HSEMS- Date of revision. 19-03-2024 a ‘ TITUE- Scissor Lift Inspection Checklist ‘Month of inspection July Frequency of insp. | As and when use Site Name Jasrhire Location Hosur _ Note:(Ok-V_Not Ok- X) otNo| Photo check Point ves | No Remarks 7 ff ‘Make sure Scissor lift is examined and tested by the | ‘competent person and valid test certificate is available. | 2 Ensure competent person Is operating the | scissor lift & competency certificate is avallable. | 3 Ensure SWL is displayed on the scissor lift. Ensure the Gate and platform is in good working condition. é Ensure the lever, controls and emergency stop switch are in good working condition. i | EZR | ona we pets, conecing ras ana are mgood | és condition. 7 ES Eee naa ener isin god conan tee = from leatage or damage. Ensure the beacon light is in good working condition. NIX RATA TARA 9 Ensure the limit switch iin good working condition. | Ensure the tyres, wheels, breaks are in good HO working condition. | ae Ensure the battery, water level, motor/ atl peep cnn, vent capa, hou resorvok, we are in good working condition. é Ensure scissor arms and sliding wear pads 2 ate in good condition. 4 Z ‘Ensure front horn & reverse horn isin good working condition. Date of rapection 0% [ 09lanaq

You might also like