I-SBC Voice Networking Implementation Guide

Uploaded by

salman abbas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
83 views16 pages

I-SBC Voice Networking Implementation Guide

Uploaded by

salman abbas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

I-SBC VOICE

NETWORKING
IMPLEMENTATION
PLAN

AUTHOR Wen@central-link
EDITION 1.0
DATE 2024-5-20
DICTIONARY

I. Background of the project ...................................................................................................................... 2

Ii . Equipment introduction .......................................................................................................................... 6

2.1. The main functions provided are as follows: ................................................................................ 6

2.2. Double machine hot standby ............................................................................................................ 7

Iii . Implementation steps .............................................................................................................................. 8

3.1. The overall scheme is introduced .................................................................................................... 8

3.2. Install master and backup SBC in single office ........................... Error! Bookmark not defined.

3.3. I - SBC configuration .........................................................................................................................14

3.3.1. Planning port, IP, the bureau data, butt, etc ................................................................14

3.3.2 rainfall distribution on 10-12 IP configuration interface and routing ..............................15

3.3.3. Configure the bureau signaling and media data.........................................................15

3.3.4. Docking configuration data ..............................................................................................15


I、 Project background

Based on the net now, influence is the smallest device in the form of access network situation. At

present, it is planned to deploy I-SBC on IMS to access IMS.

Docking process is as follows: I - SBC - all net - IMS (I - CSCF and I - business address each SBC,

opened the SIP trunking.)

Docking requirements are as follows: network address, business address (signaling and media)

Solutions using ISBC, increase the SBC as agent, using the SIP protocol in networking. Needs to

meet 20000 concurrent users, hardware needs to be a server ready (to). Will be deployed on the server

for SBC product docking. SBC docking device for network IMS ICSCF now, and now the network ICSCF

open SIP trunking business communication can be realized. (during the opening, need to pass in the

net, please help to coordinate the address).


This equipment is network diagram below

Maintenance: by and IMS network maintenance switches for routine maintenance

Business: new SBC by zong to SIP trunking network and network ICSCF docking, to complete the

business.
The installation process:

According to the construction drawings, hardware installation documentation, and plate the bitmap,
and a chart ISBC hardware equipment installation work.
1.1.1 Installation Preparation

➢ Construction preparation

⚫ According to the list of documents, inspection document preparation.

⚫ Engineering design documents.

⚫ With a complete set of product information.

➢ Check the installation environment

⚫ Check the room construction conditions.

⚫ Check the environmental conditions

⚫ Check the room power supply condition.

⚫ Check the ground conditions.

⚫ Check the equipment.

Before hardware installation, customers are required to make the following preparations:

⚫ Cabinet size and power requirements

Before hardware installation, customers are required to make the following preparations:

⚫ Cabinet size and power requirements

Number
Cabinet Cabinet input The power Empty open
Equipment of
specification power supply supply specifications
cabinets
0.6 m * 1.1 m * 2.2 Dc (-48V)
Cabinet 1 Double 3 Road 60A
m Ac (220V)

Server parameters: Superfusion FusionServer2288H V5 server host 2U rack type

category Technical Technical indicators Quantity


Indicators
highly 86.1 mm (2 u)
The The width of 447mm (including mounting
mechanical the bends) 5
parameters The depth of The 748.0 mm
the
II、 Equipment Description

The SBC product is a session boundary controller that supports virtualization installation and

deployment based on Hyperfusion FusionServer2288H V5 server as well as VMware and FusionSphere.

This product deployment is simple, fast, specifically for enterprises, electric power, bank and other

industries to provide safety and quality of voice, video, multimedia interactive experience, helping

enterprises to construct simple, safe, fusion of VoIP networks. This product is deployed in the border

of the enterprise IP network, control the access of branches or Internet users, and support the

interconnection between the enterprise IP network and the operator network or other IP networks.

SBC virtualization deployment solution to the current increasing the number of servers and

underused computing resources. Through hardware integration of improve the utilization rate of

hardware resource and reduce operational costs, improve operational efficiency, improve service levels.

Change the original application package/release model, realize the application of hardware decoupling,

a more thorough application rapid deployment, make the OS greening. Between the virtual machine

can be in more than one physical server transparent mobile, mobile business in the process of

uninterrupted.

2.1. The main function of the offer are as follows:

⚫ Signaling and media encryption

⚫ Signaling, media attack prevention

⚫ Public and private network address translation

⚫ Media stream bypass

⚫ QoS guarantee

⚫ IMS agent registration

⚫ Media Enhancement

◼ Includes TCP/UDP message broker forwarding, SIP public-private network traversal


(TURN Server/ICE), Security Traversal Gateway (STG), Firewall traversal (SVN), HTTP
reverse proxy, and Web data service proxy.

⚫ Intranet firewall traversal (IPSec tunnel)

⚫ Lync gateway
2.2. Double machine hot standby

For today's communication network, the user experience on uninterrupted business demand is

higher and higher. SBC as session border controller, is in the core network and access network, core

network and the confluence of core network, in order to prevent a SBC device of accidental failures

lead to the entire network business interruption, the reliability of the SBC must provide effective

solutions.

When a SE1000 failure, the system automatically guarantee another SE1000 continues to provide

services, users can use the business continuity, improve customer satisfaction.

SE1000 double-machine hot standby scheme has the following advantages:

⚫ Foreign present consistent business IP address. The main disaster for group of foreign

business using the same IP address, no need to IP address planning new business, save the

client IP address resources.

⚫ New business access time. When the main use SE1000 failure, local hot standby of two

network scheme can ensure that new business access time is shortened to about 3 seconds.

⚫ Local double machine can also be to fault detection, veneer and internal process carried out in

accordance with the rearrangement of strategy rearrangement of double machine.

⚫ It shortens the upgrade time of SE1000 version, and supports cross-version registration data

backup.
III、 The implementation steps

3.1. Introduction of the overall Scheme

➢ Check before motor on electric system.

⚫ Check monitoring alarm switch power supply power distribution box, ensure that the

switch at "ON".

⚫ Confirm power distribution box and cabinet internal components of the power switch

are placed in the "OFF" state.

⚫ Using a multimeter to check cabinet dc power distribution box of each input and

output power of anode wire, ground wire is connected, confirm the working power

supply and working does not appear short circuit fault between PGND RTN or

protected area.

⚫ Use multimeter ohm, one of the pens and choose one fixed PGND (yellow-green),

another pens and for every 48 v - or - 60 v (blue) output for inspection, to ensure that

the power distribution box between power supply and protect the PGND no short

circuit phenomenon.

⚫ Using the multimeter ohm file, the two watch pens were selected each way output of

the -48V or -60V (blue) and RTN (black or red) terminal for inspection, to ensure that

the distribution box working power supply and working RTN between the short circuit

phenomenon.

➢ Connected to a dc power distribution cabinet to the power supply of distribution box


➢ Check after power on.

⚫ In the case of no-load, use a multimeter measuring dc voltage, two pens and select

each output RTN (black or red) and 48 v - or - 60 v (blue) terminal for inspection, to

ensure that the cabinet power distribution box of each input voltage in the tolerance

range.

⚫ Lights on the RUN to the cabinet power supply, confirm the distribution box should be

flashing. Power distribution box into self-inspection


1.1.2 Production and adhesive labels

⚫ Cable label

This end To the end

Engineering software installation and test

⚫ Prepare each NE version according to the version supporting materials;

⚫ Planning basic information network elements

 Ne naming:

Network
Device Model element The host name
type
FusionServer2288H
SBC [Link]
V5

1.1.3 Customer cooperate with matters

一、 Topology of IMS internal networking switches, SBC and CE interconnects.


二、 Switch interface parameters such as address, the network protocol.
三、 ICSCF business address, opened SIPTG need information.

This equipment is introduced:


SBC is the switching point of signaling protocol. Signaling packets between two networks are
transmitted through SBC to implement functions such as call admission control.
When SBC is used as I-SBC:
Supports SIP over TCP, SIP, SIP, SIP over UDP over TLS over WSS transfers.
Forward the signaling and media flow between the different network support, support the
transformation between IPV4 and IPV6.
Built-in basic voice codec conversion is supported
1.1.4 Software installation network elements

According to the guidance of product documentation, in accordance with the board a plan
to complete the installation of the various network elements (installation steps product document
has detailed description), the only simple operation process:

⚫ Install the OMU/SBC software

⚫ OMU client PC installation

⚫ Adding SBC veneer, network elements, module data


The Completion
The big
serial The details Specific instructions time
items
number (days)
Survey on the overall point room environment, to
ensure that the equipment installation and
accessories in line with the site conditions,
Inspection
Local site environmental requirements for computer room
installation 1 day
survey equipment at the same time;
environment
Engine bearing, machine room environment, space,
power supply capacity, port number, the end
equipment location type, walked by.
1.1 Hardware arrival Project start 0.5 days
According to the packing list, mobile equipment
1.2 Hardware inspection ready for confirmation on the arrival of the 1 day
1. The main goods
use game Cabinet and board Installation cabinet installation cabinet, and
1.3 1 day
point installation insert the single slot accordingly
hardware All kinds of cables between cloth and contained
1.4 Wire cloth 1 day
installation in the cabinet
Will power supply access to computer room power
1.5 Power on the device supply equipment, electric start and complete 1 day
equipment
Software
2.1 OMU/SBC 0.5 days
Installation
2. The main
Basic Data
use game 2.2 Equipment foundation data configuration 0.5 days
Configuration
point
Business data ICSCF network elements in alignment with each
native 2.3
configuration other
debugging 3 days
Test the service of
2.4 To complete the basic business configuration
the machine
3. Network Network equipment In accordance with the requirements for network
3.1 2 days
docking docking docking bearing network network equipment
4. Access Access business
4.1 Complete the SBC test 1 day
business measurement
alignment 4.2 Access joint tone SBC access network, and IMS interconnection 3 days
The main game point of system function test
5. The Business system according to requirements
5.1 1 day
system test testing For the typical terminal access network is now
testing
The metadata alignment

The data configuration of the network element docking is complex, and there are detailed
descriptions for each network element in the product document, which will not be explained here
(the subsequent IP allocation will be supplemented according to the actual situation).

1.2 Project progress plan

3.2. A typical business routing

IMS user registration

⚫ Under normal circumstances the user registration


IMS user registration, terminal registration by SBC to IMS Core
In IMS VPN terminal through PCSCF registered to IMS Core.
IMS calls between users

IMS users call, signaling negotiation needs to be done by SBC is forwarded to the core side, while
the media through the SBC.

3.3. I-SBC configuration

3.3.1. Planning of port, IP, the bureau data, butt, etc

Serial Game This This domain This domain Local domain


number point domain side port side of network
side signaling the media management
signaling port port
media and
IP
1 Pakistan
2
3
3.3.2. Configuration interface IP and routing

3.3.3. Configure the bureau signaling and media data

SE1000 deployment in the outside network and enterprise Intranet, as I - SBC, signaling and media,

need to configure the bureau data. Include:

▪ Configuration signaling address and port

Configuration of outland side signalling address and well-known ports, used for communication

signal and the network. Configuration of this domain side signalling address and the domain

side signaling address block, used for and enterprise Intranet server communication signal.

▪ Configure the media addresses

Configuration of outland side media address and domain name, is used in the communication

media and the network packet. Configuration in this domain side media address and domain

name, is used to exchange media and corporate Intranet message.

3.3.4. Configure docking data

SE1000 deployed in operator network (IMS), docking configuration data, including:

▪ Configure docking with the internal network (ICSCF) data

After the data is configured to dock with the Intranet, incoming and outgoing calls can be

forwarded.

3.3.5. Product Testing

I - after completion of SBC and ICSCF product docking, allocated number. Distribution is completed

and the test, the various cities and call and provide the corresponding test report.

Provide test process signaling and keep files, check equipment indicators, confirm user status, and

confirm equipment status. Network performance indicators for confirmati on.