No.
Department
Operational Control Plan Issue No. 01
EHS
Date
1.0 Effluent Treatment Plan – Water Pollutants
Multi Effect Evaporator
1.1
Frequency Once in a shift
Calendaria Vacuum in mmHg Temperature in °C
Calendaria – 1 450 – 550 35 – 45 °C
Calendaria – 2 550 – 650 55 – 65 °C
Calendaria – 3 650 – 720 65 – 75 °C
1.2 Sludge Management
Control
Stages Parameters Limit Frequency Record
by
pH 6.5 – 8.5 As and
Solid
when Sludge
Waste Moisture Content 35 % Max ETP
vehicle is Monitoring
Storage Incharge
No over stacking and loaded for Records
Area Vehicle Condition
sludge Spillage disposal
2.0 Emission To Air – Air Pollutants
Controls by Outside Laboratory
2.1
Frequency Atleast Once in A Quarter
Limit Max. At Different Locations
Parameters Steam Boiler / Hot Air Ambient Air – Plant
Generator Premises
Particulate Matters / Suspended
150 mg/NM3 500 microgram/M3
Particulate Matters
SO2/SOx 100 PPM 120 microgram/M3
NOX 50 PPM 120 microgram/M3
Noise And Illumination Controls
2.2
Frequency Atleast Once in A Quarter
Limit
Day Time Night Time
Locations Parameters
Illumin Illumin
Noise Noise
ation ation
Plant Premises All Internal Roads and floors
Boiler Premises Within 50 Meters Perimeter
300 300
Generator Set At all Floors And Near All 75 dBA 70 dBA
Lux Lux
Premises Equipments Max. Max.
Min Min
Minimum 5 Points Within
Stores Premises
The Stores Premises
Prepared And Approved By Signature
Page 1 of 1