0% found this document useful (0 votes)
28 views40 pages

Project 1 Group 3

JBST RIGHT

Uploaded by

humagainbipulraj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views40 pages

Project 1 Group 3

JBST RIGHT

Uploaded by

humagainbipulraj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

2023F_CON_1013_1

Construction Jobsite Management


Instructor: Sarmad Kiani

Project 1
Construction Project Schedule

Group 3
Submitted By:

Student Name Student Id


Bandana Gajurel C0909899
Bikal Paudel C0902256
Bipul Raj Humagain C0905009
Jyoti Sitoula C0905261
Shikshya Shrestha C0911001
ment
Work Brea

Pre Constructio
Construction of Public Library

Construction
Post Constructio
Work Break Down Structure

Project S

Planning
Regulatory

Construction Lab Te

Drawing a

Design and Mobilization


Outso

Mobilizati
Substructure Concrete
Construction

P
Parking and Landscaping
Construction
L
onstruction

Framin
I

Wa

Internal W

Superstructure and
Finishes
Mechan
Internal W

Superstructure and
Finishes
Mechan
Plu

Furnitu
I

Final A

t Construction Handover and


Review
Post Pr
Project Scope Identification

Regulatory and Zoning Permits

Lab Test and Surveying

Drawing and Building Permits

Outsourcing Selection

Mobilization and Coordination


Meeting

Excavation
Excavation

Concrete and Waterproofing

Backfilling

Parking Lot

Landscaping

Framing and Floor Deck


Installation

Wall Installaton

Internal Wall Studs & MEP Fit


In

Mechanical, Electrical and


Internal Wall Studs & MEP Fit
In

Mechanical, Electrical and


Plumbing Fit Off

Furniture and Appliances


Installation

Finishes

Final Adjustments and


Handover

Post Project Review and


Evaluation
Master Schedule and Bar Chart
Phases Sub Phases
Planning

Pre- Construction
Design and Mobilization

Sub Structure Construction

Parking and Landscaping Construction


Construction

Super Structure and Finishing

Post Construction Handover and Review

Bar Chart

Activities Duration

0 10 20 30 40 50 60 70
Project Scope Identification

Regulatory and Zoning Permits

Lab Test and Surveying

Drawing and Building Permits

Outsourcing Selection

Mobilization and Cordination Meeting

Excavation

Concrete and Waterproofing

Backfilling

Parking Lot and Landscaping works

Framing and Floor Desk Installation

Wall Installation

Internal Wall Studs & MEP Fit In

Mechanical, Electrical and Plumbing Fit Off

Furniture and Appliances Installation

Finishes

Final Adjustments and Handover

Post Project Review and Evaluation


Internal Wall Studs & MEP Fit In

Mechanical, Electrical and Plumbing Fit Off

Furniture and Appliances Installation

Finishes

Final Adjustments and Handover

Post Project Review and Evaluation


ster Schedule and Bar Chart
Activity Duration Start Date
Project Scope Identification 3 January 18, 2024
Regulatory and Zoning Permits 30 January 30, 2024
Lab Test and Surveying 13 February 6, 2024
Drawing and Building Permits 90 February 16, 2024
Outsourcing Selection 34 April 27, 2024
Mobilization and Cordination Meeting 6 May 11, 2024
Excavation 37 May 18, 2024
Concrete and Waterproofing 95 June 4, 2024
Backfilling 5 July 9, 2024
Parking Lot and Landscaping works 62 July 14, 2024
Framing and Floor Desk Installation 70 August 1, 2024
Wall Installation 31 August 31, 2024
Internal Wall Studs & MEP Fit In 35 September 23, 2024
Mechanical, Electrical and Plumbing Fit Off 29 October 10, 2024
Furniture and Appliances Installation 8 November 6, 2024
Finishes 71 November 14, 2024
Final Adjustments and Handover 35 January 25, 2025
Post Project Review and Evaluation 8 February 20, 2025

Bar Chart
Duration

0 10 20 30 40 50 60 70 80 90 100
pe Identification

Zoning Permits

st and Surveying

Building Permits

urcing Selection

ination Meeting

Excavation

d Waterproofing

Backfilling

ndscaping works

Desk Installation

Wall Installation

uds & MEP Fit In

lumbing Fit Off

nces Installation

Finishes

ts and Handover

w and Evaluation
uds & MEP Fit In

lumbing Fit Off

nces Installation

Finishes

ts and Handover

w and Evaluation
Finish Date
January 29, 2024
February 5, 2024
February 15, 2024
April 26, 2024
May 10, 2024
May 17, 2024
June 3, 2024
July 8, 2024
July 13, 2024
July 31, 2024
August 30, 2024
September 22, 2024
October 9, 2024
November 5, 2024
November 13, 2024
January 24, 2025
February 19, 2025
February 26, 2025

80 90 100
Detailed
Phases

Pre-Construction

Construction

Post-Construction
Detailed Schedule
Sub Phase Activity
A
Planning B
C
D
E
F
G
Design and Mobilizaton H
I
J
K
L
M
N
O
P
Sub Structure Construction
Q
R
S
T
Parking and Landscaping U
Construction LL
V
W
X
Y
Z
AA
BB
CC
Super Structure and Finishing
DD
EE
FF
GG
HH
II
JJ
KK
MM
Handover NN
OO
Review PP
Detailed Schedule
Description
Project Scope Identification
Assessment and Planning
Zoning and Approval
Surveying and Soil test report
Preparation of drawing and designs( architectural, structural, MEP)
Drawing Review and Finalization
Building and other Regulatory Permits
Subcontractor, Supplier, Fabricator Selection
Shop Drawing Review and Approval
Equipments and Tools Procurement
Partnering Meeting and Workshop Session
Jobsite Layout Plan
Site Clearance
Top Soil Removal
Excavation for Foundation
Rebar and Anchor Bolt Installation
Formwork on Footing
Concrete Pouring and Curing (Including Formwork Removal)
Waterproofing and drainage installation
Backfilling
Parking Lot Construction
Landscaping
Structural Steel Framing( Columns, Girders and Joists)
Floor Deck Installation
Roof System Installation
Exterior Insulation and Finish System (EIFS) Wall Installation
Partition wall steel studs and plates installation and MEP Rough-In
Fire Suppression System Rough In
Drywall and Interior doors and windows Installation
Exterior Windows and Doors Installation
Suspended Ceiling Installation
Painting Works
Mechanical, Electrical and Plumbing Fit Off
Fire Supression System Fit Off
Furniture Installation
Appliances Installation
Floor Finishes
Interior and Exterior Finishes
Quality Checks and Final Inspections
Punchlist, Final Adjustments and Certifications
Handover to client
Post Project Review and Evaluation
Duration Predessor Start Date Finish Date
3 - January 18, 2024 January 20, 2024
15 A January 21, 2024 February 4, 2024
7 B February 5, 2024 February 11, 2024
10 C February 12, 2024 February 21, 2024
30 D February 22, 2024 March 22, 2024
5 E March 23, 2024 March 27, 2024
30 F March 28, 2024 April 26, 2024
15 G April 27, 2024 May 11, 2024
5 H May 12, 2024 May 16, 2024
15 F March 28, 2024 April 11, 2024
1 H May 12, 2024 May 12, 2024
5 I, J, K May 13, 2024 May 17, 2024
12 L May 18, 2024 May 29, 2024
5 M May 30, 2024 June 3, 2024
14 N June 4, 2024 June 17, 2024
14 O June 18, 2024 July 1, 2024
14 P July 2, 2024 July 15, 2024
28 Q July 21, 2024 August 17, 2024
12 R August 18, 2024 August 29, 2024
4 S August 30, 2024 September 2, 2024
15 N, T September 3, 2024 September 17, 2024
30 U September 18, 2024 October 17, 2024
30 R August 18, 2024 September 16, 2024
21 V September 17, 2024 October 7, 2024
28 V September 17, 2024 October 14, 2024
14 W October 8, 2024 October 21, 2024
24 W October 8, 2024 October 31, 2024
13 Z November 1, 2024 November 13, 2024
14 Z November 1, 2024 November 14, 2024
8 Y October 22, 2024 October 29, 2024
15 X October 15, 2024 October 29, 2024
12 BB November 15, 2024 November 26, 2024
22 DD October 30, 2024 November 20, 2024
14 AA November 14, 2024 November 27, 2024
7 EE November 27, 2024 December 3, 2024
6 EE November 27, 2024 December 2, 2024
12 GG,HH,II December 4, 2024 December 15, 2024
40 CC,FF,JJ December 16, 2024 January 24, 2025
5 KK, LL January 25, 2025 January 29, 2025
15 MM January 30, 2025 February 13, 2025
6 NN February 14, 2025 February 19, 2025
7 OO February 20, 2025 February 26, 2025
Network Diagram

0 0 3 3 18 18
A,3 B,15
1 2 3

S.N Path
1 A-B-C-D-E-F-G-H-I-L-M-N-O-P-Q-R-V-W-Z-BB-EE-HH-JJ-KK-MM-NN-OO-PP
2 A-B-C-D-E-F-J-L-M-N-O-P-Q-R-V-W-Z-BB-EE-HH-JJ-KK-MM-NN-OO-PP
3 A-B-C-D-E-F-G-H-K-L-M-N-O-P-Q-R-V-W-Z-BB-EE-HH-JJ-KK-MM-NN-OO-PP
4 A-B-C-D-E-F-G-H-I-L-M-N-O-P-Q-R-V-W-Z-BB-EE-II-JJ-KK-MM-NN-OO-PP
5 A-B-C-D-E-F-J-L-M-N-O-P-Q-R-V-W-Z-BB-EE-II-JJ-KK-MM-NN-OO-PP
6 A-B-C-D-E-F-G-H-K-L-M-N-O-P-Q-R-V-W-Z-BB-EE-II-JJ-KK-MM-NN-OO-PP
7 A-B-C-D-E-F-G-H-I-L-M-N-O-P-Q-R-V-W-Y-AA-GG-JJ-KK-MM-NN-OO-PP
8 A-B-C-D-E-F-J-L-M-N-O-P-Q-R-V-W-Y-AA-GG-JJ-KK-MM-NN-OO-PP
9 A-B-C-D-E-F-G-H-K-L-M-N-O-P-Q-R-V-W-Y-AA-GG-JJ-KK-MM-NN-OO-PP
10 A-B-C-D-E-F-G-H-I-L-M-N-O-P-Q-R-V-W-Y-CC-KK-MM-NN-OO-PP
11 A-B-C-D-E-F-J-L-M-N-O-P-Q-R-V-W-Y-CC-KK-MM-NN-OO-PP
12 A-B-C-D-E-F-G-H-K-L-M-N-O-P-Q-R-V-W-Y-CC-KK-MM-NN-OO-PP
13 A-B-C-D-E-F-G-H-I-L-M-N-O-P-Q-R-V-X-DD-FF-KK-MM-NN-OO-PP
14 A-B-C-D-E-F-J-L-M-N-O-P-Q-R-V-X-DD-FF-KK-MM-NN-OO-PP
15 A-B-C-D-E-F-G-H-K-L-M-N-O-P-Q-R-X-DD-FF-KK-MM-NN-OO-PP
16 A-B-C-D-E-F-G-H-I-L-M-N-O-P-Q-R-S-T-U-LL-MM-NN-OO-PP
17 A-B-C-D-E-F-J-L-M-N-O-P-Q-R-S-T-U-LL-MM-NN-OO-PP
18 A-B-C-D-E-F-G-H-K-L-M-N-O-P-Q-R-S-T-U-LL-MM-NN-OO-PP

Activity Duration ES LS EF LF TF FF
A 3 0 0 3 3 0 0
B 15 3 3 18 18 0 0
C 7 18 18 25 25 0 0
D 10 25 25 35 35 0 0
E 30 35 35 65 65 0 0
F 5 65 65 70 70 0 0
G 30 70 70 100 100 0 0
H 15 100 100 115 115 0 0
I 5 115 115 120 120 0 0
J 15 70 70 85 120 35 0
K 1 115 115 116 120 4 0
L 5 120 120 125 125 0 0
M 12 125 125 137 137 0 0
N 5 137 137 142 142 0 0
O 14 142 142 156 156 0 0
P 14 156 156 170 170 0 0
Q 14 170 170 184 184 0 0
R 28 184 184 212 212 0 0
V 30 212 212 242 242 0 0
W 21 242 242 263 263 0 0
Z 24 263 263 287 287 0 0
BB 14 287 287 301 301 0 0
EE 12 301 301 313 313 0 0
HH 7 313 313 320 320 0 0
II 6 313 313 319 320 1 0
JJ 12 320 320 332 332 0 0
KK 40 332 332 372 372 0 0
S 12 212 212 224 283 59 0
T 4 224 283 228 287 59 0
U 15 228 287 243 302 59 0
LL 30 243 302 273 332 59 0
X 28 242 242 270 295 25 0
DD 15 270 295 285 310 25 0
FF 22 285 310 307 332 25 0
Y 14 263 263 277 293 16 0
CC 8 277 293 285 332 47 0
AA 13 277 293 290 306 16 0
GG 14 290 306 304 320 16 0
MM 5 372 372 377 377 0 0
NN 15 377 377 392 392 0 0
OO 6 392 392 398 398 0 0
PP 7 398 398 405 405 0 0
25 25 35 35 65 65
C,7 D,10 E,30
4 5 6

Criticality Duration
CP 405
NCP 370
NCP 401
NCP 404
NCP 369
NCP 400
NCP 389
NCP 354
NCP 385
NCP 389
NCP 354
NCP 385
NCP 380
NCP 345
NCP 376
NCP 306
NCP 271
NCP 302
70 70 100 100 115
F,5 G,30 H,15
7 8 9

J,15
85 120

11
116 120

14

K,1

115 120 120 125


I,5 L,5
9 10

11
125 137 137 142 142
M,12 N,5
12 13 14
156 156 170 170 184

O,14 P,14 Q,14


15 16 17
184 212 212
242 242
R,28 V,30
17 18 22

S,12

224 283

19
277 293

25

Y,14

263 263
287 287
W,21 Z,24
23 26

X,28

270 295

24
DD,15

T,4

228 287

20
U,15
285 332

29

CC,8
304 320
290 306
AA,13 GG,14
27 33

313 313
301 301
BB,14 EE,12
28 31

307
285 310 FF,22
32
30

243 302

21
320 320 332

HH,7 JJ,12 35
34

319 320

II,6 24

332

32

LL,30
332 377 377
372 372
35 KK,40 MM,5 38
36

273 332

37
392 392 398 398

NN,15 OO,6 PP,7


39 40
405 405

41