0% found this document useful (0 votes)
209 views7 pages

STP Design for EDC Baguio Guest House

Design of 10CMD STP
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
209 views7 pages

STP Design for EDC Baguio Guest House

Design of 10CMD STP
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

GUESTHOUSE

BAGUIO CITY

SEWAGE TREATMENT PLANT

MEMBRANE BIO-REACTOR MBR PROCESS


FOR 10 CMD CAPACITY

BON WASTEWATER
SOLUTIONS CORPORATION
UNIT 815, PACIFIC CENTURY TOWER, QUEZON AVENUE,
QUEZON CITY TEL. NOS.: 810-2001
NOTE:
Bon Wastewater Solution
Corporation maintains
full title and ownership of
these plans. Any unauthorized
use, reproduction,or
distribution of these plans,
whether in whole or in part, is
expressly prohibited without
prior written consent.

ELECTRICAL ROOM
REVISIONS
NO. DESCRIPTION DATE

2.5
NK ACC MET
TA
PT
IC ESS ERS
SE RO
NG AD
ISTI
EX

TEMPORARY FACILITY
LOCATION MA
CHINE
ROOM

BON WASTEWATER
SOLUTIONS CORPORATION

PROJECT TITLE:
2 SITE DEVELOPMENT PLAN
SCALE 1:300 MTS

STP for EDC Baguio


Guest House

SHEET CONTENT:
1. PERSPECTIVE
2. SITE DEVELOPMENT
PLAN
PROJECT LOCATION 3. LOCATION MAP

CAPACITY:

10TONS CAPACITY

DATE: DRAWN BY:

08/22/2024 RQA

PAPER SIZE CHECKED BY:


& SCALE:

A3 - BGM
AS SHOWN
SHEET NO: APPROVED BY:

1 OF 6 BGM
1 PERSPECTIVE 3 LOCATION MAP
SCALE NTS DRAWING NO.:
SCALE NTS
BWWS24047-DWG
NOTE:
Bon Wastewater Solution
Corporation maintains
full title and ownership of
these plans. Any unauthorized
use, reproduction,or
distribution of these plans,
whether in whole or in part, is
ELECTRICAL ROOM
expressly prohibited without
prior written consent.

REVISIONS
NO. DESCRIPTION DATE
2.5
NK AC MET
IC
TA CESS ER
SE
PT RO S
NG AD
ISTI
EX

TEMPORARY FACILITY
LOCATION MACHI
NE ROO
M

SITE DEVELOPMENT PLAN

20000 10000 10000


BON WASTEWATER
SOLUTIONS CORPORATION

ELECTRICAL PROJECT TITLE:


ROOM

STP for EDC Baguio


Guest House

6500
SHEET CONTENT:
1. SDP SECTION -
PROPOSED STP
LOCATION
PROPOSE STP LOCATION 2 STOREY - STAFF HOUSE

CAPACITY:

10TONS CAPACITY
250
3419
6000

EXISTING DATE: DRAWN BY:


SEPTIC TANK
no data for depth of foundation

2500
1.5W X 3.0L X 1.5H
08/22/2024 RQA
3049

FRP TANK PAPER SIZE CHECKED BY:


& SCALE:

A3 - BGM
2.5M WIDE ROAD AS SHOWN
SHEET NO: APPROVED BY:

1 SDP SECTION - PROPOSED STP LOCATION 2 OF 6 BGM


SCALE 1:125 MTS
DRAWING NO.:

BWWS24047-DWG
NOTE:
Bon Wastewater Solution
Corporation maintains
full title and ownership of
these plans. Any unauthorized
use, reproduction,or
distribution of these plans,
whether in whole or in part, is
expressly prohibited without
prior written consent.

REVISIONS
NO. DESCRIPTION DATE

EXISTING SEPTIC SCREEN TANK FLOW ADJUSTMENT TANK ANOXIC TANK MEMBRANE SEPARATION SLUDGE TANK
TANK TANK

1 PROCESS FLOW
SCALE NTS

BON WASTEWATER
SOLUTIONS CORPORATION

PROJECT TITLE:

SUCTION
PUMP

METHANOL
TO STP for EDC Baguio
CHEMICAL DISCHARGE
FEED PUMP FEED PUMP TANK Guest House
(PAC)

RING
BLOWER
SHEET CONTENT:
AIR LIFT
1. FLOW DIAGRAM
2. PN ID
TRANSFER BY GRAVITY

TRANSFER BY OVERFLOW TRANSFER BY OVERFLOW TRANSFER BY OVERFLOW


EFFLUENT
SCREENING

W.L W.L W.L W.L W.L


OVERFLOW

CAPACITY:

10TONS CAPACITY

DATE: DRAWN BY:

08/22/2024 RQA
EXISTING SEPTIC SCREEN TANK FLOW ADJUSTMENT TANK ANOXIC TANK MEMBRANE SEPARATION TANK SLUDGE TANK
TANK
PAPER SIZE CHECKED BY:
& SCALE:

A3 - BGM
AS SHOWN
1 PN ID SHEET NO: APPROVED BY:
SCALE NTS
3 OF 6 BGM

DRAWING NO.:

BWWS24047-DWG
NOTE:
Bon Wastewater Solution
Corporation maintains
full title and ownership of
these plans. Any unauthorized
use, reproduction,or
distribution of these plans,
whether in whole or in part, is
expressly prohibited without
prior written consent.

REVISIONS
NO. DESCRIPTION DATE

7480
1200 1500 4780

MACHINE ROOM
BON WASTEWATER
SOLUTIONS CORPORATION

PROJECT TITLE:

3400
STP for EDC Baguio
Guest House

SHEET CONTENT:
1. STP PLAN VIEW
2. STP SECTION A
3. STP SECTION B

CAPACITY:
1 STP PLAN VIEW 10TONS CAPACITY
SCALE 1:50MTS
DATE: DRAWN BY:

08/22/2024 RQA

PAPER SIZE CHECKED BY:


& SCALE:

A3 - BGM
AS SHOWN
SHEET NO: APPROVED BY:

4 OF 6 BGM

DRAWING NO.:

BWWS24047-DWG
NOTE:
Bon Wastewater Solution
Corporation maintains
full title and ownership of
these plans. Any unauthorized
use, reproduction,or
distribution of these plans,
whether in whole or in part, is
expressly prohibited without
prior written consent.

REVISIONS
250 NO. DESCRIPTION DATE
3419

6000
3049
FRP TANK

BON WASTEWATER
SOLUTIONS CORPORATION

1 STP SECTION A PROJECT TITLE:


SCALE 1:50MTS

STP for EDC Baguio


Guest House

SHEET CONTENT:
1. STP SECTION A
2. STP SECTION B

6000
W.L W.L.
CAPACITY:

MACHINE 10TONS CAPACITY


ROOM
DATE: DRAWN BY:

3049
08/22/2024 RQA

PAPER SIZE CHECKED BY:


& SCALE:

A3 - BGM
AS SHOWN
SHEET NO: APPROVED BY:

5 OF 6 BGM
2 STP SECTION B DRAWING NO.:
SCALE 1:50MTS
BWWS24047-DWG
NOTE:
Bon Wastewater Solution
Corporation maintains
full title and ownership of
these plans. Any unauthorized
use, reproduction,or
distribution of these plans,
whether in whole or in part, is
expressly prohibited without
prior written consent.
MCCB

CKT. PHASE CURRENT(AMPS) SIZE OF WIRE SIZE OF WIRE(G) SIZE OF CONDUIT REVISIONS
LOAD DESCRIPTION VOLTAGE (mm. DIAMETER PVC)
NO. VOLTS- AMP ([Link] THHN) ([Link] THHN) NO. DESCRIPTION DATE
A.T. POLE TYPE AB BC AC

1 2 INDUSTRIAL
BOLT - ON
220/230 1500 6.52 2 - 3.5 1 - 3.5 15

2 2 INDUSTRIAL
BOLT - ON
220/230 1500 6.52 2 - 3.5 1 - 3.5 15

3 2 INDUSTRIAL
BOLT - ON
220/230 300 1.30 2 - 3.5 1 - 3.5 15

4 2 INDUSTRIAL
BOLT - ON
220/230 300 1.30 2 - 3.5 1 - 3.5 15

5 2 INDUSTRIAL
BOLT - ON
220/230 300 1.30 2 - 3.5 1 - 3.5 15

6 2 INDUSTRIAL
BOLT - ON
220/230 300 1.30 2 - 3.5 1 - 3.5 15

BON WASTEWATER
7 2 INDUSTRIAL
BOLT - ON
220/230 350 1.52 2 - 3.5 1 - 3.5 15 SOLUTIONS CORPORATION

8 2 INDUSTRIAL
BOLT - ON
220/230 350 1.52 2 - 3.5 1 - 3.5 15
PROJECT TITLE:

9 2 INDUSTRIAL
BOLT - ON
220/230 18.4 0.08 2 - 3.5 1 - 3.5 15

10 220/230 18.4 0.08 2 - 3.5 1 - 3.5 15


2 INDUSTRIAL
BOLT - ON
STP for EDC Baguio
Guest House
11 2 INDUSTRIAL
BOLT - ON
220/230 1500 6.52 2 - 3.5 1 - 3.5 15 CRKT CRKT CRKT CRKT CRKT CRKT CRKT CRKT CRKT CRKT CRKT
1 2 3 4 5 6 7 8 9 10 11

TOTAL LOAD CONNECTED: 27.98

OVER CURRENT COMPUTATION


Itotal = 27.98 + (125% x 6.52) = 36.13
SHEET CONTENT:
IFL = 36.13 x 80% DF x 1.25
IFL = 38.19 AMPERE 2 RISER DIAGRAM 1. ELECTRICAL LOAD
SCHEDULE
USE 40AT , 2 POLE , 230V, 60HZ CIRCUIT BREAKER SCALE NTS 2. RISER DIAGRAM
FEEDER LINE:

USE: 2-8.0 mm2 THHN LINE


1- 5.5 mm2 THHN GROUND
IN 1" Ø PVC CONDUIT

CAPACITY:

10TONS CAPACITY
1 ELECTRICAL LOAD SCHEDULE DATE: DRAWN BY:
SCALE NTS
08/22/2024 RDS

PAPER SIZE CHECKED BY:


& SCALE:

A3 - BGM
AS SHOWN
SHEET NO: APPROVED BY:

6 OF 6 BGM

DRAWING NO.:

BWWS24047-DWG

You might also like