0% found this document useful (0 votes)
29 views60 pages

Manpower Requirement

Manpower Requirement

Uploaded by

Mohammad Ummer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views60 pages

Manpower Requirement

Manpower Requirement

Uploaded by

Mohammad Ummer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

S.

No Project Activity Date Trade No of Labours


1 Time - 1
2 Time - 2

3 Mohammad Alattar Villa


4 Abdulla Villa
5 Zubaida Villa
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
Formworks
Formworks
Formworks
Formworks
Formworks
Formworks
Formworks
Formworks
Formworks
Formworks
Formworks
Formworks
Formworks
Formworks
Formworks
Formworks
Formworks
Formworks
Formworks
Formworks
Formworks
Formworks
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles

Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster

Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster

Paint
Paint
Paint

Gypsum
Gypsum
Gypsum
Gypsum
Gypsum
Gypsum
Qty
Activity 1

Guniting
Anti-Termite Treatment
PCC
SBS-Horizontal
Protection Screed
Raft Foundation
SBS-Vertical
VERTICALS ELEMENTS
Formworks
B1 - GF 1,371.60
GF - P1 -
P1 - P2 -
P2 - P3 -
P3 - F1 -
F1 - F2 -
F2 - F3 -
F3 - F4 -
F4 - F5 -
F5 - F6 -
F6 - F7 -
F7 - F8 -
F8 - F9 -
F9 - F10 -
F10 - F11 -
F11 - F12 -
F12 - F13 -
F13 - F14 -
F14 - F15 -
F15 - F16 -
F16 - TR -
TR - RT -

HORIZONTAL ELEMENTS
Formworks
GF 2,773.39
P1 2,060.39
P2 2,232.99
P3 2,261.99
F1 2,402.54
F2 1,735.54
F3 1,735.54
F4 1,735.54
F5 1,735.54
F6 1,735.54
F7 1,735.54
F8 1,735.54
F9 1,735.54
F10 1,735.54
F11 1,739.54
F12 1,739.54
F13 1,739.54
F14 1,739.54
F15 1,739.54
F16 1,739.54
TR 108.15
Duration Total
Carpenter Mason Steel Fixer

18.00 180.00 - -
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
Helper No of Labours

180.00 360.00
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
Activity 1

VERTICALS ELEMENTS
Formworks
Formworks B1 - GF
Formworks B1 - GF
Formworks B1 - GF
Formworks B1 - GF
Formworks B1 - GF
Formworks B1 - GF
Formworks B1 - GF
Formworks B1 - GF
Formworks B1 - GF
Formworks B1 - GF
Formworks B1 - GF
Formworks B1 - GF
Formworks B1 - GF
Formworks B1 - GF
Formworks B1 - GF
Formworks B1 - GF
Formworks B1 - GF
Formworks B1 - GF
GF - P1
P1 - P2
P2 - P3
P3 - F1
F1 - F2
F2 - F3
F3 - F4
F4 - F5
F5 - F6
F6 - F7
F7 - F8
F8 - F9
F9 - F10
F10 - F11
F11 - F12
F12 - F13
F13 - F14
F14 - F15
F15 - F16
F16 - TR
TR - RT

HORIZONTAL ELEMENTS
Formworks
GF
P1
P2
P3
F1
F2
F3
F4
F5
F6
F7
F8
F9
F10
F11
F12
F13
F14
F15
F16
TR
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Tiles
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster

Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster
Plaster

Paint
Paint
Paint

Gypsum
Gypsum
Gypsum
Gypsum
Gypsum
Gypsum
Qty
Day

Day 1 76.20
Day 2 76.20
Day 3 76.20
Day 4 76.20
Day 5 76.20
Day 6 76.20
Day 7 76.20
Day 8 76.20
Day 9 76.20
Day 10 76.20
Day 11 76.20
Day 12 76.20
Day 13 76.20
Day 14 76.20
Day 15 76.20
Day 16 76.20
Day 17 76.20
Day 18 76.20
Day 1 108.68
Day 2 108.68
Day 3 108.68
Day 4 108.68
Day 5 108.68
Day 6 108.68
Day 7 108.68
Day 8 108.68
Day 9 108.68
Day 10 108.68
Day 11 108.68
Day 12 108.68
985.32
982.26
1,357.83
733.59
733.59
733.59
733.59
733.59
733.59
733.59
733.59
733.59
733.59
733.59
733.59
733.59
733.59
733.59
733.59
223.08

2,773.39
2,060.39
2,232.99
2,261.99
2,402.54
1,735.54
1,735.54
1,735.54
1,735.54
1,735.54
1,735.54
1,735.54
1,735.54
1,735.54
1,739.54
1,739.54
1,739.54
1,739.54
1,739.54
1,739.54
108.15
Productvity No of Gangs

8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00
8.00 10.00

16.00 11.00
16.00 11.00
16.00 11.00
16.00 11.00
16.00 11.00
16.00 11.00
16.00 11.00
16.00 11.00
16.00 11.00
16.00 11.00
16.00 11.00
16.00 11.00
16.00 11.00
16.00 11.00
16.00 11.00
16.00 11.00
16.00 11.00
16.00 11.00
16.00 11.00
16.00 11.00
16.00 11.00
Duration
Carpenter

1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
12.00 1.00
12.00 1.00
12.00 1.00
12.00 1.00
10.00 1.00
10.00 1.00
10.00 1.00
10.00 1.00
10.00 1.00
10.00 1.00
10.00 1.00
10.00 1.00
10.00 1.00
10.00 1.00
10.00 1.00
10.00 1.00
10.00 1.00
10.00 1.00
10.00 1.00
10.00 1.00
8.00 1.00

15.76 1.00
11.71 1.00
12.69 1.00
12.85 1.00
13.65 1.00
9.86 1.00
9.86 1.00
9.86 1.00
9.86 1.00
9.86 1.00
9.86 1.00
9.86 1.00
9.86 1.00
9.86 1.00
9.88 1.00
9.88 1.00
9.88 1.00
9.88 1.00
9.88 1.00
9.88 1.00
0.61 1.00
Mason Steel Fixer
Labours
Helper Carpenter Mason Steel Fixer

1.00 10.00 - -
1.00 10.00 - -
1.00 10.00 - -
1.00 10.00 - -
1.00 10.00 - -
1.00 10.00 - -
1.00 10.00 - -
1.00 10.00 - -
1.00 10.00 - -
1.00 10.00 - -
1.00 10.00 - -
1.00 10.00 - -
1.00 10.00 - -
1.00 10.00 - -
1.00 10.00 - -
1.00 10.00 - -
1.00 10.00 - -
1.00 10.00 - -
1.00 120.00
1.00 120.00
1.00 120.00
1.00 120.00
1.00 100.00
1.00 100.00
1.00 100.00
1.00 100.00
1.00 100.00
1.00 100.00
1.00 100.00
1.00 100.00
1.00 100.00
1.00 100.00
1.00 100.00
1.00 100.00
1.00 100.00
1.00 100.00
1.00 100.00
1.00 100.00
1.00 80.00

1.00 173.34
1.00 128.77
1.00 139.56
1.00 141.37
1.00 150.16
1.00 108.47
1.00 108.47
1.00 108.47
1.00 108.47
1.00 108.47
1.00 108.47
1.00 108.47
1.00 108.47
1.00 108.47
1.00 108.72
1.00 108.72
1.00 108.72
1.00 108.72
1.00 108.72
1.00 108.72
1.00 6.76
Helper No of Labours

10.00 20.00
10.00 20.00
10.00 20.00
10.00 20.00
10.00 20.00
10.00 20.00
10.00 20.00
10.00 20.00
10.00 20.00
10.00 20.00
10.00 20.00
10.00 20.00
10.00 20.00
10.00 20.00
10.00 20.00
10.00 20.00
10.00 20.00
10.00 20.00
120.00 240.00
120.00 240.00
120.00 240.00
120.00 240.00
100.00 200.00
100.00 200.00
100.00 200.00
100.00 200.00
100.00 200.00
100.00 200.00
100.00 200.00
100.00 200.00
100.00 200.00
100.00 200.00
100.00 200.00
100.00 200.00
100.00 200.00
100.00 200.00
100.00 200.00
100.00 200.00
80.00 160.00

173.34 346.67
128.77 257.55
139.56 279.12
141.37 282.75
150.16 300.32
108.47 216.94
108.47 216.94
108.47 216.94
108.47 216.94
108.47 216.94
108.47 216.94
108.47 216.94
108.47 216.94
108.47 216.94
108.72 217.44
108.72 217.44
108.72 217.44
108.72 217.44
108.72 217.44
108.72 217.44
6.76 13.52
ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

PLM PRELIMINARY WORKS 1001 1/5/2023 3/18/2026

KEY KEY MILESTONE

KEY-100 Project Commencement Date 1/5/2023

KEY-101 Project Duration 1068

KEY-102 Structure Star Date 4/17/2023

KEY-103 Structure Completion Date 6/14/2025

KEY-104 Project Completion Date 6/4/2026

MOB MOBILIZATION & DEMOBILIZATION 983 1/26/2023 3/18/2026

MOB-100 Site Offices 15 2/1/2023 2/18/2023

MOB-101 Temporary Generator Electricity 15 1/26/2023 2/13/2023

MOB-102 Site Utilities Connections 15 2/1/2023 2/18/2023

MOB-103 Demobilization 15 3/1/2026 3/18/2026

ENG ENGINEERING WORKS 250 2/18/2023 12/7/2023

ENG-100 Structural Elements 250 2/18/2023 12/7/2023

ENG-101 Architectural Elements 250 2/18/2023 12/7/2023

ENG-102 Electrical Elements 250 2/18/2023 12/7/2023

ENG-103 Mechanical Elements 250 2/18/2023 12/7/2023

ENG-104 Structural Drawings 250 2/18/2023 12/7/2023

ENG-105 Electrical Drawings 250 2/18/2023 12/7/2023

ENG-106 Mechanical Drawings 250 2/18/2023 12/7/2023

ENG-107 Swimming Pool 250 2/18/2023 12/7/2023

ENG-108 Block Works 250 2/18/2023 12/7/2023

ENG-109 Flooring Drawings 250 2/18/2023 12/7/2023

ENG-110 Ceiling Works 250 2/18/2023 12/7/2023

ENG-111 Doors And Windows 250 2/18/2023 12/7/2023

TIME SCHEDULE TIME - II PAGE 35 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

ENB ENABLING WORKS 86 1/5/2023 4/15/2023

ENB ENABLING WORKS 86 1/5/2023 4/15/2023

ENB-100 Enabling Works 86 1/5/2023 4/15/2023

BLD BUILDING WORKS 895 4/17/2023 2/24/2026

GEN GENERAL 167 4/17/2023 10/28/2023

GEN-100 Guniting 15 4/17/2023 5/4/2023 Sub-Contract Helpers 3

GEN-100 Guniting 15 4/17/2023 5/4/2023 Curing Helpers 2

GEN-101 Compaction 15 5/5/2023 5/23/2023 Sub-Contract Helpers 3

GEN-102 Anti-Termite Treatment 3 5/24/2023 5/27/2023 Sub-Contract Helpers 3

GEN-103 PCC 15 5/29/2023 6/15/2023 Sub-Contract Helpers 5

GEN-103 PCC 2 6/15/2023 6/17/2023 Curing Helpers 2

GEN-104 SBS-Horizontal 15 6/16/2023 7/4/2023

GEN-105 Protection Screed 12 7/5/2023 7/19/2023

GEN-106 Raft Foundation 65 7/20/2023 10/4/2023

GEN-107 SBS-Vertical 20 10/5/2023 10/28/2023

STR-VER VERTICALS ELEMENTS 519 10/5/2023 6/2/2025

STR-VER-100 B1 - GF 18 10/5/2023 10/26/2023

STR-VER-101 GF - P1 12 11/17/2023 12/1/2023

STR-VER-102 P1 - P2 12 12/19/2023 1/2/2024

STR-VER-103 P2 - P3 12 1/19/2024 2/2/2024

STR-VER-104 P3 - F1 12 2/20/2024 3/5/2024

STR-VER-105 F1 - F2 10 3/20/2024 4/1/2024

STR-VER-106 F2 - F3 10 4/16/2024 4/27/2024

STR-VER-107 F3 - F4 10 5/13/2024 5/24/2024

STR-VER-108 F4 - F5 10 6/8/2024 6/20/2024

TIME SCHEDULE TIME - II PAGE 36 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

STR-VER-109 F5 - F6 10 7/5/2024 7/17/2024

STR-VER-110 F6 - F7 10 8/1/2024 8/13/2024

STR-VER-111 F7 - F8 10 8/28/2024 9/9/2024

STR-VER-112 F8 - F9 10 9/24/2024 10/5/2024

STR-VER-113 F9 - F10 10 10/21/2024 11/1/2024

STR-VER-114 F10 - F11 10 11/16/2024 11/28/2024

STR-VER-115 F11 - F12 10 12/13/2024 12/25/2024

STR-VER-116 F12 - F13 10 1/9/2025 1/21/2025

STR-VER-117 F13 - F14 10 2/5/2025 2/17/2025

STR-VER-118 F14 - F15 10 3/4/2025 3/15/2025

STR-VER-119 F15 - F16 10 3/31/2025 4/11/2025

STR-VER-120 F16 - TR 10 4/26/2025 5/8/2025

STR-VER-121 TR - RT 8 5/23/2025 6/2/2025

STR-HOR HORIZONTAL ELEMENTS 511 10/27/2023 6/14/2025

STR-HOR-100 GF 16 10/27/2023 11/15/2023

STR-HOR-101 P1 12 12/2/2023 12/16/2023

STR-HOR-102 P2 12 1/3/2024 1/17/2024

STR-HOR-103 P3 12 2/3/2024 2/17/2024

STR-HOR-104 F1 10 3/6/2024 3/18/2024

STR-HOR-105 F2 10 4/2/2024 4/13/2024

STR-HOR-106 F3 10 4/29/2024 5/10/2024

STR-HOR-107 F4 10 5/25/2024 6/6/2024

STR-HOR-108 F5 10 6/21/2024 7/3/2024

STR-HOR-109 F6 10 7/18/2024 7/30/2024

TIME SCHEDULE TIME - II PAGE 37 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

STR-HOR-110 F7 10 8/14/2024 8/26/2024

STR-HOR-111 F8 10 9/10/2024 9/21/2024

STR-HOR-112 F9 10 10/7/2024 10/18/2024

STR-HOR-113 F10 10 11/2/2024 11/14/2024

STR-HOR-114 F11 10 11/29/2024 12/11/2024

STR-HOR-115 F12 10 12/26/2024 1/7/2025

STR-HOR-116 F13 10 1/22/2025 2/3/2025

STR-HOR-117 F14 10 2/18/2025 3/1/2025

STR-HOR-118 F15 10 3/17/2025 3/28/2025

STR-HOR-119 F16 10 4/12/2025 4/24/2025

STR-HOR-120 TR 10 5/9/2025 5/21/2025

STR-HOR-121 RT 10 6/3/2025 6/14/2025

BLK BLOCK WORKS 343 6/7/2024 7/12/2025

BLK-100 B1 - GF 3 7/2/2025 7/5/2025

BLK-101 GF - P1 5 7/7/2025 7/12/2025

BLK-102 P1 - P2 18 6/7/2024 6/28/2024

BLK-103 P2 - P3 18 6/29/2024 7/20/2024

BLK-104 P3 - F1 18 7/22/2024 8/12/2024

BLK-105 F1 - F2 16 8/13/2024 8/31/2024

BLK-106 F2 - F3 16 9/2/2024 9/20/2024

BLK-107 F3 - F4 16 9/21/2024 10/10/2024

BLK-108 F4 - F5 16 10/11/2024 10/30/2024

BLK-109 F5 - F6 16 10/31/2024 11/19/2024

BLK-110 F6 - F7 16 11/20/2024 12/9/2024

TIME SCHEDULE TIME - II PAGE 38 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

BLK-111 F7 - F8 16 12/10/2024 12/28/2024

BLK-112 F8 - F9 16 12/30/2024 1/17/2025

BLK-113 F9 - F10 16 1/18/2025 2/6/2025

BLK-114 F10 - F11 16 2/7/2025 2/26/2025

BLK-115 F11 - F12 16 2/27/2025 3/18/2025

BLK-116 F12 - F13 16 3/19/2025 4/7/2025

BLK-117 F13 - F14 16 4/8/2025 4/26/2025

BLK-118 F14 - F15 16 4/28/2025 5/16/2025

BLK-119 F15 - F16 16 5/17/2025 6/5/2025

BLK-120 F16 - TR 10 6/6/2025 6/18/2025

BLK-121 TR - RT 10 6/19/2025 7/1/2025

PLS PLASTER WORKS 341 7/8/2024 8/9/2025

PLS-100 B1 - GF 12 7/15/2025 7/29/2025

PLS-101 GF - P1 16 7/22/2025 8/9/2025

PLS-102 P1 - P2 16 7/8/2024 7/26/2024

PLS-103 P2 - P3 16 7/30/2024 8/17/2024

PLS-104 P3 - F1 16 8/21/2024 9/9/2024

PLS-105 F1 - F2 20 9/10/2024 10/3/2024

PLS-106 F2 - F3 20 9/30/2024 10/23/2024

PLS-107 F3 - F4 20 10/19/2024 11/12/2024

PLS-108 F4 - F5 20 11/8/2024 12/2/2024

PLS-109 F5 - F6 20 11/28/2024 12/21/2024

PLS-110 F6 - F7 20 12/18/2024 1/10/2025

PLS-111 F7 - F8 20 1/7/2025 1/30/2025

TIME SCHEDULE TIME - II PAGE 39 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

PLS-112 F8 - F9 20 1/27/2025 2/19/2025

PLS-113 F9 - F10 20 2/15/2025 3/11/2025

PLS-114 F10 - F11 20 3/7/2025 3/31/2025

PLS-115 F11 - F12 20 3/27/2025 4/19/2025

PLS-116 F12 - F13 20 4/16/2025 5/9/2025

PLS-117 F13 - F14 20 5/6/2025 5/29/2025

PLS-118 F14 - F15 20 5/26/2025 6/18/2025

PLS-119 F15 - F16 20 6/14/2025 7/8/2025

PLS-120 F16 - TR 10 6/27/2025 7/9/2025

PLS-121 TR - RT 10 7/10/2025 7/22/2025


WATERPROOFING - KITCHEN AND
WET-KBT 159 2/25/2025 8/29/2025
BATHROOM
WET-KBT-100 F1 9 2/25/2025 3/7/2025

WET-KBT-101 F2 9 3/8/2025 3/19/2025

WET-KBT-102 F3 9 3/20/2025 3/31/2025

WET-KBT-103 F4 9 4/1/2025 4/11/2025

WET-KBT-104 F5 9 4/12/2025 4/23/2025

WET-KBT-105 F6 9 4/24/2025 5/5/2025

WET-KBT-106 F7 9 5/6/2025 5/16/2025

WET-KBT-107 F8 9 5/17/2025 5/28/2025

WET-KBT-108 F9 9 5/29/2025 6/9/2025

WET-KBT-109 F10 9 6/10/2025 6/20/2025

WET-KBT-110 F11 9 6/21/2025 7/2/2025

WET-KBT-111 F12 9 7/3/2025 7/14/2025

WET-KBT-112 F13 9 7/15/2025 7/25/2025

WET-KBT-113 F14 9 7/26/2025 8/6/2025

TIME SCHEDULE TIME - II PAGE 40 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

WET-KBT-114 F15 9 8/7/2025 8/18/2025

WET-KBT-115 F16 9 8/19/2025 8/29/2025

TIL-FLR-FLT TILING-FLOOR-FLATS 164 3/19/2025 9/26/2025

TIL-FLR-FLT-100 F1 14 3/19/2025 4/4/2025

TIL-FLR-FLT-101 F2 14 3/31/2025 4/16/2025

TIL-FLR-FLT-102 F3 14 4/10/2025 4/26/2025

TIL-FLR-FLT-103 F4 14 4/23/2025 5/9/2025

TIL-FLR-FLT-104 F5 14 5/5/2025 5/21/2025

TIL-FLR-FLT-105 F6 14 5/15/2025 5/31/2025

TIL-FLR-FLT-106 F7 14 5/28/2025 6/13/2025

TIL-FLR-FLT-107 F8 14 6/9/2025 6/25/2025

TIL-FLR-FLT-108 F9 14 6/19/2025 7/5/2025

TIL-FLR-FLT-109 F10 14 7/2/2025 7/18/2025

TIL-FLR-FLT-110 F11 14 7/14/2025 7/30/2025

TIL-FLR-FLT-111 F12 14 7/24/2025 8/9/2025

TIL-FLR-FLT-112 F13 14 8/6/2025 8/22/2025

TIL-FLR-FLT-113 F14 14 8/18/2025 9/3/2025

TIL-FLR-FLT-114 F15 14 8/28/2025 9/13/2025

TIL-FLR-FLT-115 F16 14 9/10/2025 9/26/2025

TIL-WLL-KBT TILING-WALL-KITCHEN AND BATH 164 4/14/2025 10/22/2025

TIL-WLL-KBT-100 F1 - F2 14 4/14/2025 4/30/2025

TIL-WLL-KBT-101 F2 - F3 14 4/25/2025 5/12/2025

TIL-WLL-KBT-102 F3 - F4 14 5/6/2025 5/22/2025

TIME SCHEDULE TIME - II PAGE 41 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

TIL-WLL-KBT-103 F4 - F5 14 5/19/2025 6/4/2025

TIL-WLL-KBT-104 F5 - F6 14 5/30/2025 6/16/2025

TIL-WLL-KBT-105 F6 - F7 14 6/10/2025 6/26/2025

TIL-WLL-KBT-106 F7 - F8 14 6/23/2025 7/9/2025

TIL-WLL-KBT-107 F8 - F9 14 7/4/2025 7/21/2025

TIL-WLL-KBT-108 F9 - F10 14 7/15/2025 7/31/2025

TIL-WLL-KBT-109 F10 - F11 14 7/28/2025 8/13/2025

TIL-WLL-KBT-110 F11 - F12 14 8/8/2025 8/25/2025

TIL-WLL-KBT-111 F12 - F13 14 8/19/2025 9/4/2025

TIL-WLL-KBT-112 F13 - F14 14 9/1/2025 9/17/2025

TIL-WLL-KBT-113 F14 - F15 14 9/12/2025 9/29/2025

TIL-WLL-KBT-114 F15 - F16 14 9/23/2025 10/9/2025

TIL-WLL-KBT-115 F16 - TR 14 10/6/2025 10/22/2025

PNT-WLL-FLT PAINTING-WALL-FLATS 170 5/3/2025 11/18/2025

PNT-WLL-FLT-100 F1 - F2 20 5/3/2025 5/27/2025

PNT-WLL-FLT-101 F2 - F3 20 5/15/2025 6/7/2025

PNT-WLL-FLT-102 F3 - F4 20 5/26/2025 6/18/2025

PNT-WLL-FLT-103 F4 - F5 20 6/7/2025 7/1/2025

PNT-WLL-FLT-104 F5 - F6 20 6/19/2025 7/12/2025

PNT-WLL-FLT-105 F6 - F7 20 6/30/2025 7/23/2025

PNT-WLL-FLT-106 F7 - F8 20 7/12/2025 8/5/2025

PNT-WLL-FLT-107 F8 - F9 20 7/24/2025 8/16/2025

PNT-WLL-FLT-108 F9 - F10 20 8/4/2025 8/27/2025

PNT-WLL-FLT-109 F10 - F11 20 8/16/2025 9/9/2025

PNT-WLL-FLT-110 F11 - F12 20 8/28/2025 9/20/2025

TIME SCHEDULE TIME - II PAGE 42 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

PNT-WLL-FLT-111 F12 - F13 20 9/8/2025 10/1/2025

PNT-WLL-FLT-112 F13 - F14 20 9/20/2025 10/14/2025

PNT-WLL-FLT-113 F14 - F15 20 10/2/2025 10/25/2025

PNT-WLL-FLT-114 F15 - F16 20 10/13/2025 11/5/2025

PNT-WLL-FLT-115 F16 - TR 20 10/25/2025 11/18/2025

PNT-CEI-FLT PAINTING-CEILING-FLATS 170 5/9/2025 11/24/2025

PNT-CEI-FLT-100 F1 20 5/9/2025 6/2/2025

PNT-CEI-FLT-101 F2 20 5/21/2025 6/13/2025

PNT-CEI-FLT-102 F3 20 5/31/2025 6/24/2025

PNT-CEI-FLT-103 F4 20 6/13/2025 7/7/2025

PNT-CEI-FLT-104 F5 20 6/25/2025 7/18/2025

PNT-CEI-FLT-105 F6 20 7/5/2025 7/29/2025

PNT-CEI-FLT-106 F7 20 7/18/2025 8/11/2025

PNT-CEI-FLT-107 F8 20 7/30/2025 8/22/2025

PNT-CEI-FLT-108 F9 20 8/9/2025 9/2/2025

PNT-CEI-FLT-109 F10 20 8/22/2025 9/15/2025

PNT-CEI-FLT-110 F11 20 9/3/2025 9/26/2025

PNT-CEI-FLT-111 F12 20 9/13/2025 10/7/2025

PNT-CEI-FLT-112 F13 20 9/26/2025 10/20/2025

PNT-CEI-FLT-113 F14 20 10/8/2025 10/31/2025

PNT-CEI-FLT-114 F15 20 10/18/2025 11/11/2025

PNT-CEI-FLT-115 F16 20 10/31/2025 11/24/2025

TIL-FLR-COR TILING-FLOOR-CORRIDOR 169 5/15/2025 11/28/2025

TIL-FLR-COR-100 B1 3 11/6/2025 11/10/2025

TIL-FLR-COR-101 GF 3 11/11/2025 11/14/2025

TIME SCHEDULE TIME - II PAGE 43 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

TIL-FLR-COR-102 P1 3 11/15/2025 11/19/2025

TIL-FLR-COR-103 P2 3 11/20/2025 11/24/2025

TIL-FLR-COR-104 P3 3 11/25/2025 11/28/2025

TIL-FLR-COR-105 F1 10 5/15/2025 5/27/2025

TIL-FLR-COR-106 F2 10 5/27/2025 6/7/2025

TIL-FLR-COR-107 F3 10 6/6/2025 6/18/2025

TIL-FLR-COR-108 F4 10 6/19/2025 7/1/2025

TIL-FLR-COR-109 F5 10 7/1/2025 7/12/2025

TIL-FLR-COR-110 F6 10 7/11/2025 7/23/2025

TIL-FLR-COR-111 F7 10 7/24/2025 8/5/2025

TIL-FLR-COR-112 F8 10 8/5/2025 8/16/2025

TIL-FLR-COR-113 F9 10 8/15/2025 8/27/2025

TIL-FLR-COR-114 F10 10 8/28/2025 9/9/2025

TIL-FLR-COR-115 F11 10 9/9/2025 9/20/2025

TIL-FLR-COR-116 F12 10 9/19/2025 10/1/2025

TIL-FLR-COR-117 F13 10 10/2/2025 10/14/2025

TIL-FLR-COR-118 F14 10 10/14/2025 10/25/2025

TIL-FLR-COR-119 F15 10 10/24/2025 11/5/2025

TIL-FLR-COR-120 F16 3 11/6/2025 11/10/2025

TIL-FLR-COR-121 TR 3 11/11/2025 11/14/2025

TIL-WLL-COR TILING-WALL-CORRIDOR 161 6/2/2025 12/6/2025

TIL-WLL-COR-100 B1 - GF 2 11/15/2025 11/18/2025

TIL-WLL-COR-101 GF - P1 5 11/20/2025 11/26/2025

TIL-WLL-COR-102 P1 - P2 2 11/25/2025 11/27/2025

TIL-WLL-COR-103 P2 - P3 2 11/29/2025 12/2/2025

TIME SCHEDULE TIME - II PAGE 44 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

TIL-WLL-COR-104 P3 - F1 2 12/4/2025 12/6/2025

TIL-WLL-COR-105 F1 - F2 8 6/2/2025 6/11/2025

TIL-WLL-COR-106 F2 - F3 8 6/13/2025 6/23/2025

TIL-WLL-COR-107 F3 - F4 8 6/24/2025 7/3/2025

TIL-WLL-COR-108 F4 - F5 8 7/7/2025 7/16/2025

TIL-WLL-COR-109 F5 - F6 8 7/18/2025 7/28/2025

TIL-WLL-COR-110 F6 - F7 8 7/29/2025 8/7/2025

TIL-WLL-COR-111 F7 - F8 8 8/11/2025 8/20/2025

TIL-WLL-COR-112 F8 - F9 8 8/22/2025 9/1/2025

TIL-WLL-COR-113 F9 - F10 8 9/2/2025 9/11/2025

TIL-WLL-COR-114 F10 - F11 8 9/15/2025 9/24/2025

TIL-WLL-COR-115 F11 - F12 8 9/26/2025 10/6/2025

TIL-WLL-COR-116 F12 - F13 8 10/7/2025 10/16/2025

TIL-WLL-COR-117 F13 - F14 8 10/20/2025 10/29/2025

TIL-WLL-COR-118 F14 - F15 8 10/31/2025 11/10/2025

TIL-WLL-COR-119 F15 - F16 8 11/11/2025 11/20/2025

TIL-WLL-COR-120 F16 - TR 3 11/15/2025 11/19/2025

TIL-WLL-COR-121 TR - RT 3 11/20/2025 11/24/2025

PNT-WLL-COR PAINTING-WALL-CORRIDOR 161 6/7/2025 12/12/2025

PNT-WLL-COR-100 B1 - GF 2 11/21/2025 11/24/2025

PNT-WLL-COR-101 GF - P1 5 11/26/2025 12/2/2025

PNT-WLL-COR-102 P1 - P2 2 12/1/2025 12/3/2025

PNT-WLL-COR-103 P2 - P3 2 12/5/2025 12/8/2025

PNT-WLL-COR-104 P3 - F1 2 12/10/2025 12/12/2025

PNT-WLL-COR-105 F1 - F2 8 6/7/2025 6/17/2025

TIME SCHEDULE TIME - II PAGE 45 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

PNT-WLL-COR-106 F2 - F3 8 6/19/2025 6/28/2025

PNT-WLL-COR-107 F3 - F4 8 6/30/2025 7/9/2025

PNT-WLL-COR-108 F4 - F5 8 7/12/2025 7/22/2025

PNT-WLL-COR-109 F5 - F6 8 7/24/2025 8/2/2025

PNT-WLL-COR-110 F6 - F7 8 8/4/2025 8/13/2025

PNT-WLL-COR-111 F7 - F8 8 8/16/2025 8/26/2025

PNT-WLL-COR-112 F8 - F9 8 8/28/2025 9/6/2025

PNT-WLL-COR-113 F9 - F10 8 9/8/2025 9/17/2025

PNT-WLL-COR-114 F10 - F11 8 9/20/2025 9/30/2025

PNT-WLL-COR-115 F11 - F12 8 10/2/2025 10/11/2025

PNT-WLL-COR-116 F12 - F13 8 10/13/2025 10/22/2025

PNT-WLL-COR-117 F13 - F14 8 10/25/2025 11/4/2025

PNT-WLL-COR-118 F14 - F15 8 11/6/2025 11/15/2025

PNT-WLL-COR-119 F15 - F16 8 11/17/2025 11/26/2025

PNT-WLL-COR-120 F16 - TR 3 11/21/2025 11/25/2025

PNT-WLL-COR-121 TR - RT 3 11/26/2025 11/29/2025

PNT-CEI-COR PAINTING-CEILING-CORRIDOR 161 6/7/2025 12/12/2025

PNT-CEI-COR-100 B1 2 11/21/2025 11/24/2025

PNT-CEI-COR-101 GF 5 11/26/2025 12/2/2025

PNT-CEI-COR-102 P1 2 12/1/2025 12/3/2025

PNT-CEI-COR-103 P2 2 12/5/2025 12/8/2025

PNT-CEI-COR-104 P3 2 12/10/2025 12/12/2025

PNT-CEI-COR-105 F1 8 6/7/2025 6/17/2025

PNT-CEI-COR-106 F2 8 6/19/2025 6/28/2025

PNT-CEI-COR-107 F3 8 6/30/2025 7/9/2025

TIME SCHEDULE TIME - II PAGE 46 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

PNT-CEI-COR-108 F4 8 7/12/2025 7/22/2025

PNT-CEI-COR-109 F5 8 7/24/2025 8/2/2025

PNT-CEI-COR-110 F6 8 8/4/2025 8/13/2025

PNT-CEI-COR-111 F7 8 8/16/2025 8/26/2025

PNT-CEI-COR-112 F8 8 8/28/2025 9/6/2025

PNT-CEI-COR-113 F9 8 9/8/2025 9/17/2025

PNT-CEI-COR-114 F10 8 9/20/2025 9/30/2025

PNT-CEI-COR-115 F11 8 10/2/2025 10/11/2025

PNT-CEI-COR-116 F12 8 10/13/2025 10/22/2025

PNT-CEI-COR-117 F13 8 10/25/2025 11/4/2025

PNT-CEI-COR-118 F14 8 11/6/2025 11/15/2025

PNT-CEI-COR-119 F15 8 11/17/2025 11/26/2025

PNT-CEI-COR-120 F16 3 11/21/2025 11/25/2025

PNT-CEI-COR-121 TR 3 11/26/2025 11/29/2025

WET-BAL WATERPROOFING - BALCONY 151 6/13/2025 12/6/2025

WET-BAL-100 F1 15 6/13/2025 7/1/2025

WET-BAL-101 F2 8 6/25/2025 7/4/2025

WET-BAL-102 F3 8 7/5/2025 7/15/2025

WET-BAL-103 F4 8 7/18/2025 7/28/2025

WET-BAL-104 F5 8 7/30/2025 8/8/2025

WET-BAL-105 F6 8 8/9/2025 8/19/2025

WET-BAL-106 F7 8 8/22/2025 9/1/2025

WET-BAL-107 F8 8 9/3/2025 9/12/2025

WET-BAL-108 F9 8 9/13/2025 9/23/2025

WET-BAL-109 F10 8 9/26/2025 10/6/2025

TIME SCHEDULE TIME - II PAGE 47 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

WET-BAL-110 F11 8 10/8/2025 10/17/2025

WET-BAL-111 F12 8 10/18/2025 10/28/2025

WET-BAL-112 F13 8 10/31/2025 11/10/2025

WET-BAL-113 F14 8 11/12/2025 11/21/2025

WET-BAL-114 F15 8 11/22/2025 12/2/2025

WET-BAL-115 F16 8 11/27/2025 12/6/2025

TIL-FLR-BAL TILING-FLOOR-BALCONY 148 7/8/2025 12/27/2025

TIL-FLR-BAL-100 F1 20 7/8/2025 7/31/2025

TIL-FLR-BAL-101 F2 12 7/11/2025 7/25/2025

TIL-FLR-BAL-102 F3 12 7/22/2025 8/5/2025

TIL-FLR-BAL-103 F4 12 8/4/2025 8/18/2025

TIL-FLR-BAL-104 F5 12 8/15/2025 8/29/2025

TIL-FLR-BAL-105 F6 12 8/26/2025 9/9/2025

TIL-FLR-BAL-106 F7 12 9/8/2025 9/22/2025

TIL-FLR-BAL-107 F8 12 9/19/2025 10/3/2025

TIL-FLR-BAL-108 F9 12 9/30/2025 10/14/2025

TIL-FLR-BAL-109 F10 12 10/13/2025 10/27/2025

TIL-FLR-BAL-110 F11 12 10/24/2025 11/7/2025

TIL-FLR-BAL-111 F12 12 11/4/2025 11/18/2025

TIL-FLR-BAL-112 F13 12 11/17/2025 12/1/2025

TIL-FLR-BAL-113 F14 12 11/28/2025 12/12/2025

TIL-FLR-BAL-114 F15 12 12/9/2025 12/23/2025

TIL-FLR-BAL-115 F16 12 12/13/2025 12/27/2025

GYP-CEI-FLT GYPSUM-CEILING-FLATS 151 7/15/2025 1/7/2026

GYP-CEI-FLT-100 F1 15 7/15/2025 8/1/2025

TIME SCHEDULE TIME - II PAGE 48 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

GYP-CEI-FLT-101 F2 15 7/18/2025 8/5/2025

GYP-CEI-FLT-102 F3 15 7/29/2025 8/15/2025

GYP-CEI-FLT-103 F4 15 8/11/2025 8/28/2025

GYP-CEI-FLT-104 F5 15 8/22/2025 9/9/2025

GYP-CEI-FLT-105 F6 15 9/2/2025 9/19/2025

GYP-CEI-FLT-106 F7 15 9/15/2025 10/2/2025

GYP-CEI-FLT-107 F8 15 9/26/2025 10/14/2025

GYP-CEI-FLT-108 F9 15 10/7/2025 10/24/2025

GYP-CEI-FLT-109 F10 15 10/20/2025 11/6/2025

GYP-CEI-FLT-110 F11 15 10/31/2025 11/18/2025

GYP-CEI-FLT-111 F12 15 11/11/2025 11/28/2025

GYP-CEI-FLT-112 F13 15 11/24/2025 12/11/2025

GYP-CEI-FLT-113 F14 15 12/5/2025 12/23/2025

GYP-CEI-FLT-114 F15 15 12/16/2025 1/2/2026

GYP-CEI-FLT-115 F16 15 12/20/2025 1/7/2026


GYPSUM-CEILING-KITCHEN AND
GYP-CEI-KBT 152 7/24/2025 1/17/2026
BATHROOM
GYP-CEI-KBT-100 F1 16 7/24/2025 8/12/2025

GYP-CEI-KBT-101 F2 16 7/28/2025 8/15/2025

GYP-CEI-KBT-102 F3 16 8/7/2025 8/26/2025

GYP-CEI-KBT-103 F4 16 8/20/2025 9/8/2025

GYP-CEI-KBT-104 F5 16 9/1/2025 9/19/2025

GYP-CEI-KBT-105 F6 16 9/11/2025 9/30/2025

GYP-CEI-KBT-106 F7 16 9/24/2025 10/13/2025

GYP-CEI-KBT-107 F8 16 10/6/2025 10/24/2025

GYP-CEI-KBT-108 F9 16 10/16/2025 11/4/2025

TIME SCHEDULE TIME - II PAGE 49 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

GYP-CEI-KBT-109 F10 16 10/29/2025 11/17/2025

GYP-CEI-KBT-110 F11 16 11/10/2025 11/28/2025

GYP-CEI-KBT-111 F12 16 11/20/2025 12/9/2025

GYP-CEI-KBT-112 F13 16 12/3/2025 12/22/2025

GYP-CEI-KBT-113 F14 16 12/15/2025 1/2/2026

GYP-CEI-KBT-114 F15 16 12/25/2025 1/13/2026

GYP-CEI-KBT-115 F16 16 12/30/2025 1/17/2026

GYP-CEI-COR GYPSUM-CEILING-COR 174 8/5/2025 2/24/2026

GYP-CEI-COR-100 B1 8 12/23/2025 1/1/2026

GYP-CEI-COR-101 GF 12 1/2/2026 1/16/2026

GYP-CEI-COR-102 P1 8 1/17/2026 1/27/2026

GYP-CEI-COR-103 P2 8 1/28/2026 2/6/2026

GYP-CEI-COR-104 P3 8 2/7/2026 2/17/2026

GYP-CEI-COR-105 F1 17 8/5/2025 8/25/2025

GYP-CEI-COR-106 F2 17 8/8/2025 8/28/2025

GYP-CEI-COR-107 F3 17 8/19/2025 9/8/2025

GYP-CEI-COR-108 F4 17 9/1/2025 9/20/2025

GYP-CEI-COR-109 F5 17 9/12/2025 10/2/2025

GYP-CEI-COR-110 F6 17 9/23/2025 10/13/2025

GYP-CEI-COR-111 F7 17 10/6/2025 10/25/2025

GYP-CEI-COR-112 F8 17 10/17/2025 11/6/2025

GYP-CEI-COR-113 F9 17 10/28/2025 11/17/2025

GYP-CEI-COR-114 F10 17 11/10/2025 11/29/2025

GYP-CEI-COR-115 F11 17 11/21/2025 12/11/2025

GYP-CEI-COR-116 F12 17 12/2/2025 12/22/2025

TIME SCHEDULE TIME - II PAGE 50 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

GYP-CEI-COR-117 F13 17 12/15/2025 1/3/2026

GYP-CEI-COR-118 F14 17 12/26/2025 1/15/2026

GYP-CEI-COR-119 F15 17 1/6/2026 1/26/2026

GYP-CEI-COR-120 F16 17 1/10/2026 1/30/2026

GYP-CEI-COR-121 TR 12 2/10/2026 2/24/2026

EXT-PLS EXTERNAL-PLASTER 83 7/2/2025 10/7/2025

EXT-PLS-100 Elevation A 20 7/2/2025 7/25/2025

EXT-PLS-101 Elevation B 20 7/26/2025 8/19/2025

EXT-PLS-102 Elevation C 20 8/20/2025 9/12/2025

EXT-PLS-103 Elevation D 20 9/13/2025 10/7/2025

EXT-PNT EXTERNAL-PAINTING 83 7/19/2025 10/24/2025

EXT-PNT-100 Elevation A 20 7/19/2025 8/12/2025

EXT-PNT-101 Elevation B 20 8/13/2025 9/5/2025

EXT-PNT-102 Elevation C 20 9/6/2025 9/30/2025

EXT-PNT-103 Elevation D 20 10/1/2025 10/24/2025

PVW PROVISIONAL WORKS 212 6/16/2025 2/18/2026

WOD WOODEN DOOR 164 6/23/2025 12/31/2025

WOD-100 B1 10 11/29/2025 12/11/2025

WOD-101 GF 10 12/8/2025 12/19/2025

WOD-102 P1 10 12/9/2025 12/20/2025

WOD-103 P2 10 12/13/2025 12/25/2025

WOD-104 P3 10 12/18/2025 12/30/2025

WOD-105 F1 25 6/23/2025 7/22/2025

WOD-106 F2 25 7/4/2025 8/2/2025

WOD-107 F3 25 7/15/2025 8/13/2025

TIME SCHEDULE TIME - II PAGE 51 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

WOD-108 F4 25 7/28/2025 8/26/2025

WOD-109 F5 25 8/8/2025 9/6/2025

WOD-110 F6 25 8/19/2025 9/17/2025

WOD-111 F7 25 9/1/2025 9/30/2025

WOD-112 F8 25 9/12/2025 10/11/2025

WOD-113 F9 25 9/23/2025 10/22/2025

WOD-114 F10 25 10/6/2025 11/4/2025

WOD-115 F11 25 10/17/2025 11/15/2025

WOD-116 F12 25 10/28/2025 11/26/2025

WOD-117 F13 25 11/10/2025 12/9/2025

WOD-118 F14 25 11/21/2025 12/20/2025

WOD-119 F15 25 12/2/2025 12/31/2025

WOD-120 F16 25 12/1/2025 12/30/2025

WOD-121 TR 12 12/5/2025 12/19/2025

ALG ALUMINUM AND GLASS 169 7/22/2025 2/4/2026

ALG-100 B1 12 12/29/2025 1/12/2026

ALG-101 GF 12 1/6/2026 1/20/2026

ALG-102 P1 12 1/7/2026 1/21/2026

ALG-103 P2 12 1/12/2026 1/26/2026

ALG-104 P3 12 1/16/2026 1/30/2026

ALG-105 F1 30 7/22/2025 8/26/2025

ALG-106 F2 30 8/2/2025 9/6/2025

ALG-107 F3 30 8/13/2025 9/17/2025

ALG-108 F4 30 8/26/2025 9/30/2025

TIME SCHEDULE TIME - II PAGE 52 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

ALG-109 F5 30 9/6/2025 10/11/2025

ALG-110 F6 30 9/17/2025 10/22/2025

ALG-111 F7 30 9/30/2025 11/4/2025

ALG-112 F8 30 10/11/2025 11/15/2025

ALG-113 F9 30 10/22/2025 11/26/2025

ALG-114 F10 30 11/4/2025 12/9/2025

ALG-115 F11 30 11/15/2025 12/20/2025

ALG-116 F12 30 11/26/2025 12/31/2025

ALG-117 F13 30 12/9/2025 1/13/2026

ALG-118 F14 30 12/20/2025 1/24/2026

ALG-119 F15 30 12/31/2025 2/4/2026

ALG-120 F16 30 12/30/2025 2/3/2026

ALG-121 TR 15 1/3/2026 1/21/2026

ELT ELEVATOR WORKS 212 6/16/2025 2/18/2026

ELT-100 Delivery of Equipment 45 6/16/2025 8/7/2025

ELT-101 Installation of Equipment 150 8/8/2025 1/30/2026

ELT-102 Testing and Commissioning 15 1/31/2026 2/18/2026

GBC GARBAGE CHUTE 162 8/13/2025 2/18/2026

GBC-100 Delivery of Equipment 30 8/13/2025 9/17/2025

GBC-101 Installation of Equipment 120 9/18/2025 2/5/2026

GBC-102 Testing and Commissioning 10 2/6/2026 2/18/2026

SWP SWIMMING POOL 212 6/16/2025 2/18/2026

SWP-100 Primary Waterproofing 20 6/16/2025 7/9/2025

SWP-101 Guniting 15 7/10/2025 7/28/2025

TIME SCHEDULE TIME - II PAGE 53 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

SWP-102 Delivery of MEP Equipment 50 7/29/2025 9/25/2025

SWP-103 Installation of MEP Equipment 61 9/26/2025 12/6/2025

SWP-104 Secondary Waterproofing 20 12/8/2025 12/31/2025

SWP-105 Tiling 20 1/1/2026 1/24/2026

SWP-106 Testing and Commissioning 20 1/26/2026 2/18/2026

KCT KITCHEN CABINET 161 8/13/2025 2/17/2026

KCT-100 F1 25 8/13/2025 9/11/2025

KCT-101 F2 25 8/16/2025 9/15/2025

KCT-102 F3 25 8/27/2025 9/25/2025

KCT-103 F4 25 9/9/2025 10/8/2025

KCT-104 F5 25 9/20/2025 10/20/2025

KCT-105 F6 25 10/1/2025 10/30/2025

KCT-106 F7 25 10/14/2025 11/12/2025

KCT-107 F8 25 10/25/2025 11/24/2025

KCT-108 F9 25 11/5/2025 12/4/2025

KCT-109 F10 25 11/18/2025 12/17/2025

KCT-110 F11 25 11/29/2025 12/29/2025

KCT-111 F12 25 12/10/2025 1/8/2026

KCT-112 F13 25 12/23/2025 1/21/2026

KCT-113 F14 25 1/3/2026 2/2/2026

KCT-114 F15 25 1/14/2026 2/12/2026

KCT-115 F16 25 1/19/2026 2/17/2026

WAR WARDROBES 161 8/13/2025 2/17/2026

WAR-100 F1 25 8/13/2025 9/11/2025

WAR-101 F2 25 8/16/2025 9/15/2025

TIME SCHEDULE TIME - II PAGE 54 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

WAR-102 F3 25 8/27/2025 9/25/2025

WAR-103 F4 25 9/9/2025 10/8/2025

WAR-104 F5 25 9/20/2025 10/20/2025

WAR-105 F6 25 10/1/2025 10/30/2025

WAR-106 F7 25 10/14/2025 11/12/2025

WAR-107 F8 25 10/25/2025 11/24/2025

WAR-108 F9 25 11/5/2025 12/4/2025

WAR-109 F10 25 11/18/2025 12/17/2025

WAR-110 F11 25 11/29/2025 12/29/2025

WAR-111 F12 25 12/10/2025 1/8/2026

WAR-112 F13 25 12/23/2025 1/21/2026

WAR-113 F14 25 1/3/2026 2/2/2026

WAR-114 F15 25 1/14/2026 2/12/2026

TIME SCHEDULE TIME - II PAGE 55 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

WAR-115 F16 25 1/19/2026 2/17/2026

MEP MEP WORKS 904 5/5/2023 3/25/2026

ELC ELECTRICAL WORK 904 5/5/2023 3/25/2026

ELC-100 B1 904 5/5/2023 3/25/2026

ELC-101 GF 904 5/5/2023 3/25/2026

ELC-102 P1 904 5/5/2023 3/25/2026

ELC-103 P2 904 5/5/2023 3/25/2026

ELC-104 P3 904 5/5/2023 3/25/2026

ELC-105 F1 904 5/5/2023 3/25/2026

ELC-106 F2 904 5/5/2023 3/25/2026

ELC-107 F3 904 5/5/2023 3/25/2026

ELC-108 F4 904 5/5/2023 3/25/2026

ELC-109 F5 904 5/5/2023 3/25/2026

ELC-110 F6 904 5/5/2023 3/25/2026

ELC-111 F7 904 5/5/2023 3/25/2026

ELC-112 F8 904 5/5/2023 3/25/2026

ELC-113 F9 904 5/5/2023 3/25/2026

ELC-114 F10 904 5/5/2023 3/25/2026

ELC-115 F11 904 5/5/2023 3/25/2026

ELC-116 F12 904 5/5/2023 3/25/2026

ELC-117 F13 904 5/5/2023 3/25/2026

ELC-118 F14 904 5/5/2023 3/25/2026

ELC-119 F15 904 5/5/2023 3/25/2026

ELC-120 F16 904 5/5/2023 3/25/2026

ELC-121 TR 904 5/5/2023 3/25/2026

TIME SCHEDULE TIME - II PAGE 56 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

HVAC HVAC WORKS 904 5/5/2023 3/25/2026

HVAC-100 B1 904 5/5/2023 3/25/2026

HVAC-101 GF 904 5/5/2023 3/25/2026

HVAC-102 P1 904 5/5/2023 3/25/2026

HVAC-103 P2 904 5/5/2023 3/25/2026

HVAC-104 P3 904 5/5/2023 3/25/2026

HVAC-105 F1 904 5/5/2023 3/25/2026

HVAC-106 F2 904 5/5/2023 3/25/2026

HVAC-107 F3 904 5/5/2023 3/25/2026

HVAC-108 F4 904 5/5/2023 3/25/2026

HVAC-109 F5 904 5/5/2023 3/25/2026

TIME SCHEDULE TIME - II PAGE 57 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

HVAC-110 F6 904 5/5/2023 3/25/2026

HVAC-111 F7 904 5/5/2023 3/25/2026

HVAC-112 F8 904 5/5/2023 3/25/2026

HVAC-113 F9 904 5/5/2023 3/25/2026

HVAC-114 F10 904 5/5/2023 3/25/2026

HVAC-115 F11 904 5/5/2023 3/25/2026

HVAC-116 F12 904 5/5/2023 3/25/2026

HVAC-117 F13 904 5/5/2023 3/25/2026

HVAC-118 F14 904 5/5/2023 3/25/2026

HVAC-119 F15 904 5/5/2023 3/25/2026

HVAC-120 F16 904 5/5/2023 3/25/2026

HVAC-121 TR 904 5/5/2023 3/25/2026

LPG LPG WORKS 904 5/5/2023 3/25/2026

LPG-100 B1 904 5/5/2023 3/25/2026

LPG-101 GF 904 5/5/2023 3/25/2026

LPG-102 P1 904 5/5/2023 3/25/2026

LPG-103 P2 904 5/5/2023 3/25/2026

LPG-104 P3 904 5/5/2023 3/25/2026

LPG-105 F1 904 5/5/2023 3/25/2026

LPG-106 F2 904 5/5/2023 3/25/2026

LPG-107 F3 904 5/5/2023 3/25/2026

LPG-108 F4 904 5/5/2023 3/25/2026

LPG-109 F5 904 5/5/2023 3/25/2026

LPG-110 F6 904 5/5/2023 3/25/2026

LPG-111 F7 904 5/5/2023 3/25/2026

TIME SCHEDULE TIME - II PAGE 58 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

LPG-112 F8 904 5/5/2023 3/25/2026

LPG-113 F9 904 5/5/2023 3/25/2026

LPG-114 F10 904 5/5/2023 3/25/2026

LPG-115 F11 904 5/5/2023 3/25/2026

LPG-116 F12 904 5/5/2023 3/25/2026

LPG-117 F13 904 5/5/2023 3/25/2026

LPG-118 F14 904 5/5/2023 3/25/2026

LPG-119 F15 904 5/5/2023 3/25/2026

LPG-120 F16 904 5/5/2023 3/25/2026

LPG-121 TR 904 5/5/2023 3/25/2026

PLB PLUMBING WORKS 904 5/5/2023 3/25/2026

TIME SCHEDULE TIME - II PAGE 59 OF 60


ACTIVITY CODE ACITIVITY DURATION START END ACTIVITY TRADE NO
GRAND SUMMARY 1068 1/5/2023 6/4/2026

PLB-100 B1 904 5/5/2023 3/25/2026

PLB-101 GF 904 5/5/2023 3/25/2026

PLB-102 P1 904 5/5/2023 3/25/2026

PLB-103 P2 904 5/5/2023 3/25/2026

PLB-104 P3 904 5/5/2023 3/25/2026

PLB-105 F1 904 5/5/2023 3/25/2026

PLB-106 F2 904 5/5/2023 3/25/2026

PLB-107 F3 904 5/5/2023 3/25/2026

PLB-108 F4 904 5/5/2023 3/25/2026

PLB-109 F5 904 5/5/2023 3/25/2026

PLB-110 F6 904 5/5/2023 3/25/2026

PLB-111 F7 904 5/5/2023 3/25/2026

PLB-112 F8 904 5/5/2023 3/25/2026

PLB-113 F9 904 5/5/2023 3/25/2026

PLB-114 F10 904 5/5/2023 3/25/2026

PLB-115 F11 904 5/5/2023 3/25/2026

PLB-116 F12 904 5/5/2023 3/25/2026

PLB-117 F13 904 5/5/2023 3/25/2026

PLB-118 F14 904 5/5/2023 3/25/2026

PLB-119 F15 904 5/5/2023 3/25/2026

PLB-120 F16 904 5/5/2023 3/25/2026

PLB-121 TR 904 5/5/2023 3/25/2026

PHO PROJECT HANDING OVER 60 3/26/2026 6/4/2026

PHO PROJECT HANDING OVER 60 3/26/2026 6/4/2026

PHO-100 Project Handing Over 60 3/26/2026 6/4/2026

TIME SCHEDULE TIME - II PAGE 60 OF 60