Electrical Engineer with 20+ Years Experience

Project Coordinator CV

Uploaded by

sanrian123
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
128 views5 pages

Electrical Engineer with 20+ Years Experience

Project Coordinator CV

Uploaded by

sanrian123
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Eng.

Mohamed Sheriffu Murshid


Mobile: +971 5867 45827 WhatsApp +94 7653 20258
Email: murshi212@[Link]

EDUCATION 1. BACKGROUND
 Graduate Diploma in I am an Electrical Engineer (Infrastructure Projects) possessing a
Electrical Engineering, demonstrated leadership & interpersonal skill and having 20+ years
University of Moratuwa, Sri of professional extensive working experience (including 13 years in
Lanka Oman, UAE, Qatar and Saudi Arabia) in successful completion and
 Graduate Diploma in delivery of many large-scale projects of the built environment and
Electrical & Electronics construction industry. Most of my career experience was gained
Engineering, Engineering from working with reputable European Project Management &
Council (UK) Engineering Consultants and Australian/Japanese/GCC/Chinese
 Engineering Graduate Contractors, in several infrastructure projects, Water supply,
Diploma in Electrical Wastewater treatment plants, Sea water RO plants, Pump houses,
Engineering, Institute of mixed used developments, utilities (wet and dry) Commercial &
Engineers Sri Lanka. Residential buildings, Villas, to, implemented in the forms of
EPC/PMC/PMCM/D&B/Turnkey, in Oman, UAE, Qatar, Saudi Arabia
SKILLS and Sri Lanka from inception to delivery.
 Project Engineer, Infrastructure
Projects water supply projects, I served as a representative of main contractor’s, consultant’s &
STP & SWRO plants client’s and gained valuable experience in project management,
 Team player in construction management, engineering supervision, construction
PMCM/EPC/PMC /Design inspection & procurement management areas.
build/Turnkey executions.
 Electrical & Instrument Eng. I have enough working knowledge with relevant Public Works
 Electrical Inspector- Authority (PWA) procedures & requirements, of above-mentioned
Commercial/ Residential countries.
buildings/Villas.
RECOGNITIONS
MEMBERSHIPS FEWA-UAE
HAYA-Oman
 Associate Member– Institution
QP-Qatar
of Engineers, Sri Lanka. Ministry of Water & Electricity KSA
 Associate Member – Institute NWSDB-Srilanka
of Electrical Engineers UK.

2. EMPLOYMENT HISTORY (OMAN, UAE, QATAR, SAUDI ARABIA AND SRI LANKA)

Duration Designation Employer/Client Name of the Project

Wastewater treatment
Mar 2021 to Cadagua (Spain)
Senior EICA Eng. plant (50,000 m3 / Day),
date
(contract basis) Ancillary buildings and
upgrading 2 No’s of Lifting
Jan 2014 to
Senior Project Engineer. HAYA Water Stations AT Darsait Oman.
Feb 2018
Sultanate of Oman (DBOM)
Nihon Suido Consultant’s Co.
Consultant’s Project Ltd. Japan Kandy City Wastewater
Mar 2018 to
Engineer Management Project
Feb 2021 National Water Supply &
Drainage Board- Sri Lanka. (KCWMP).

Page 1/5
Sea Water Reverse
Jan 2010 to Cadagua (Spain)
Osmosis Plant, (400MLD) in
Senior EICA Eng.
Dec 2013 Al-Zawra, Ajman, UAE
FEWA- UAE
(Design and Build)
Residential buildings G+
Senior Electrical Hyosung Ebara Engineering 15, Domestic Waste Water
Jun 2007 to Engineer Co. Ltd. Treatment Plant and 3
lifting stations, in
Jan 2010
Masaieed Community
Qatar Petrolium QP Area, Qatar. (EPIC
Phase1)
OutoTec Australia.
May 2005 to Consultant’s Electro Integrated Water supply
Scheme of Eastern Costal
May 2007 Mechanical Eng National Water Supply &
Towns of Ampara District.
Drainage Board- Sri Lanka.
Binjarallah Est. Operation and
Riyad, KSA Maintenance Sewage
May 2002 to Project Electrical network, Pump houses
Jan 2005 Engineer Ministry of Water & Electricity and the Wastewater
KSA. treatment plant at Hofuf
Al-Hassa
May 2001 to Electrical Design MEP Projects & LV MCC
Figaro Ltd
Apr 2002 Engineer panel builders.

3. PROJECTS DETAILS
Employer : Cadagua- Oman (Ferrovial Group Spain)
Role : Senior Project Engineer.
Client : Haya Water, Oman
Consultant : Parsons
Period : Jan 2014 to Mar 2018. Mar 2019 to date (contract basis)
Overall Program Sum : R.O 37 Million
Project : Projects consist of design and BUILD (50,000 m3 / Day) Wastewater water treatment
(MBR technology) plant, treated water storage tanks, underground sumps, roads,
tanker filling stations, buildings, landscapes, lifting pump houses transmission and
distribution pipe line networks. (DBOM) at New Darsait, Muscat, Oman.
Project Equipment Details: 11KV SWGRs, RMUs, 2500KVA 11KV/400V Transformers, 2500KVA 415V
Generator, LV MCC Panels 2500A, 415V, 44KA /3sec, MV Cable, LV cable, Induction Motors, Soft
starter, capacitor panels, Battery charger, UPS 5KVA, 3KVA, Cable tray, Lighting, Lightning
protection system, Earthing system, HVAC, Mechanical screen, Odor control system, Sludge
decanters, drying bed, Oxidation ditches, Clarifiers, UV system, Sludge holding tanks, Neutralization
pit, Air blowers, EOT crane, potable water system, Level switches, Level transmitter, ORP Transmitters,
Flow transmitter, Fire Fighting, Fire alarm system, Proximity switches, SCADA, H2S Gas monitoring
system, CCTV, Access control and Assets monitoring system.

Employer : Nihon Suido Consultant’s Co. [Link]


Role : Consultant’s Project Engineer
Client : National Water Supply and Drainage Board, Sri Lanka.
Consultant : Nihon Suido Consultant’s Co. [Link]
Period : Mar 2018 to Feb 2022
Contract Sum : JPY Million 1,400 LKR Billion 22.5
Funding Agent : JICA Japan
Project : Kandy City Wastewater Management Project.
The project consists of, 6 MH Pumping stations, 01 Main PS and A Wastewater
treatment plant 14,000 m3 / day. Force main piping and gravity collection sewer lines

Page 2/5
of total 220 km of pipe installations (open cut/MT/HDD), Ancillary buildings, road
works, service connections and associated activities.
Project Equipment Details:
Plant: 11kv/415v, 800KVA Transformer 415V Generator, LV MCC Panels 2500A, 415V, 44KA /3sec, MV
Cable, LV cable laying,, Induction Motors, Soft starter, capacitor, Battery charger, UPS 5KVA, 3KVA,
Cable tray, Lighting, Lightning protection system, Earthing system, HVAC, Mechanical screen, Odor
control system, Sludge decanters, drying bed, Oxidation ditches, Clarifiers, UV system, Sludge
holding tanks, Neutralization pit, Air blowers, EOT crane, potable water system, Level switches, Level
transmitter, ORP Transmitters, Flow transmitter, Fire Fighting, Fire alarm system, Proximity switches,
SCADA, H2S Gas monitoring system, CCTV, Access control and Assets monitoring system.

Staff Accommodations & Control room: Building Utilities such as, water supply, Sanitary /Sewage
systems, Fire Alarm, Firefighting, HVAC, Access Control, CCTV, LV Panels, SMDB, DB, Lighting, Yard
lighting, Cabling, Intercom system, Stand by generator, Transformer room, telephone, Data, TV, and
Lift.

Employer : Cadagua- Dubai (Ferrovial Group Spain)


Role : Senior EICA Engineer (Infra structure)
Client : Federal Electricity & Water Authority FEWA, UAE.
Consultant : ILF Consultancy Abu Dhabi
Period : Jan 2010 to Dec 2013
Contract sum : AED 2.6 Billion
Projects : Sea Water Reverse Osmosis Plant, (400MLD) in Al-Zawra, Ajman, UAE
(Design and Build).
Project consists of design ang build a Sea Water Reverse Osmosis Plant, (400 MLD) in
Al-Zawra, Ajman, UAE.

Project Equipment Details: Raw water Screens, Air burst system, Inlet lift pump stations, DAF,UV Filters,
RO Membrane racks, Pressure exchangers, RO Booster pumps, RO high pressure
pumps 11KV, treated water pumps, backwash pumps, belt press, chlorination system,
chemical dosing system, piping (GRP,SS,PVC), Analytical instruments, Field
instruments, SCADA, Fiber Optic network, 11KV cabling, LV panels, Transformers, MV
SWGR,LVSWGR, Diesel generator, fuel system installation, Soundproofing & HVAC
system.

Employer : Hyosung Ebara Engineering [Link]. Qatar


Role : Senior Electrical Engineer
Client : Qatar Petroleum- QP Qatar.
Consultant : KEO
Period : June 2007 to Jan 2010
Projects : Construction of Waste Water Treatment Plant and 3 lifting stations, in Masaieed
Community Area, Qatar. (EPIC Phase1)
The project consists of construction of m3 / Day, wastewater treatment plant,
pumping stations, FOC networking, road rehabilitation and soft & hard landscape
works. I was in-charge for entire Electrical works relate to the project.

Employer : Outokumpu Technology Pty Ltd. Australia/Sunpower Constructions, Sri Lanka


Role : Consultant’s Electro Mechanical Eng
Client : National Water Supply and Drainage Board of Sri Lanka
Period : May 2005 to May 2007
Projects : Integrated Water Supply Schemes in Ampara District (ECTAD Phase I & II). Project
consists of design and construction of raw water intake, treatment plant (filter houses,
clear water reservoirs), sludge dryers, buildings, pump stations, elevated water towers,

Page 3/5
pipe laying (transmissions & distributions – 660km) and electro-mechanical
installations.

Employer : Binjarallah Est. Riyadh, KSA.


Role : Project Electrical Engineer
Client : Ministry of Water and Electricity, Eastern Province, Kingdom of Saudi Arabia.
Period : May 2002 to Jan 2005
Project : Operation and Maintenance of Sewage Network, STP (220,000 m3 / Day ) and 9
No’s of pump stations, sewer network and storm water PH.
I was a second man electrical engineer for Ministry of Water and Electricity,
Kingdom of Saudi Arabia (Eastern Province – Al Ahasa) and responsible for the 24/7
maintenance crews.

4. ROLES AND RESPONSIBILITIES


Infrastructure Project Engineer /EICA Eng. (Consultant/Main Contractor’s Representative)
 Deliver projects within the framework of sustainability, risk and environmental considerations
while maintaining focus on time, cost and quality. Experienced in PMCM/EPC/PMC /Design
build/Turnkey executions.
 Review of design reports, sub-contractor’s submittals (shop drawings, method statements,
material submittals, work programmers and alternative designs & proposals), design
coordination works & stakeholder management. Monitor & report Contractor’s progress,
assess delays (if any) and suggest preventive/corrective measures for catchup.
• Prepare Prequalification Documents, Tender Documents (specifications, drawings and
BOQs) and Engineer’s Estimates. Managing stakeholders/utility agencies/service providers.
 Responsible to the higher management on project risk management, resource planning,
project scheduling, construction methodology, cost budgeting, procurement of materials
and subcontractors, project execution, cost/schedule monitoring, QA/QC, HSE, HR
management, project delivery and contract close out.
 Develop construction methodologies, shop drawings, material submittals, ITPs, QA/QC & HSE
Plans for consultant/client approval. Adhere to project documentation, programs, master
budget etc.
 Liaise with service providers and utility agencies in obtaining their work permits and NOCs to
facilitate the project works, as per the schedule.
 Responsible for post contract administration (including contractual correspondence,
monthly valuations, new rates, identifying and managing variations, claims, extension of time,
final bill etc).
 Coordination between project stake holders and represent the contractor in all Progress
Review Meetings and Project Coordination Meetings. Provide training to empower young
engineers and other staff.
 Coordination with client, consultants, subcontractors & suppliers, to ensure “right product is
built and build a reputation for my employer.
Project MEP Engineer (Main Contractors representative).
• Attending to Inspection Requests (IR's) submitted by the contractor and take appropriate
action in a timely manner.
• Review submitted shop drawings against contract drawings and specifications, local codes
and statutory requirements and international best practice.
• Report any works carried out by contractor found to not be in accordance with approved
drawing and specifications and report to stakeholders for appropriate action.
• Receive material inspection requests (MIR) from contractor, inspect electrical &
instrumentation materials delivered at site and report on quantity and technical compliance
and sign off requests.

Page 4/5
• Monitor quality of works and assess the safety at site including health and environmental
issues, ensuring compliance with contractual / QCS specifications and safety and health risk
assessments.
• Maintain records for daily activities on site including progress photos and ensure they are
readily available for inspection as and when required.
• Prepare surveillance report for deficiencies of work found at site and non-conformance
reports (NCR) if required in view of the development of events.
• Check and ensure effective co-ordination between disciplines related works and all other
disciplines.
• Provide technical input and experiences to resolve any discipline related issues on site that
may arise.
• Prepare daily/weekly summary report to Engineer.
• Prepare snag list & involve taking over/handing over the project.
• Assist Engineer to As-built drawing approval.
• Assist Engineer in monthly invoice, VO approval.

5. RESEARCH WORKS
 “Feasibility study for introducing Solar PV at KCWMP- Project report submitted to Institute of
Engineers in 2022

6. PERSONAL INFORMATION
 Nationality : Sri Lankan
 DOB : 22nd Feb 1976
 Passport No : N6746021
 Gender : Male
 Material Status : Married
 Driving License : UAE, Oman, Qatar, & Srilanka.
 Languages : English (excellent), Arabic (good), Urdu (very good) & Tamil (native)

I hereby declare that the particulars furnished above are true and accurate to the best of my
knowledge. Kindly contact me on +971 5867 45827 mobile and + 94 7653 20258 WhatsApp, should
any further information be required.

Thanking you.

Eng. Mohamed Sheriffu Murshid

Page 5/5