Bangladesh Sunshine Timing:
Chattogram Sunshine Timing:
Daily Avg. Sunshine Hour is 6.21 hours.
Average Daily Solar Radiation in Bangladesh (Area):
Solar Radiation in Chittagong (Chattogram) is 4.55 kWh/m2/day
Photovoltaic Power Potential in Bangladesh:
Total Installed Power Generation Capacity of Bangladesh:
Energy Mix in Power Generation 2021-22:
Peak Demand Analysis (GDP Elasticity Method):
Solar Photovoltaic Targets to be Achieved by 2041:
Solar Photovoltaic Targets from 2020-2041:
Renewable Energy Sector Development in Bangladesh:
Installed Solar PV Modules / Plants in Bangladesh:
Authorities Related to Solar PV / Plant Installation:
1. BPDB (Bangladesh Power Development Board)
2. SREDA (Sustainable and Renewable Energy Development Authority)
3. Power Division, Ministry of Power, Energy and Mineral Resources
Government of Bangladesh.
Approval:
1. For Solar PV and Inverter, the approval of SREDA is required.
2. For Grid / Off-Grid, BPDB approval required (Net Metering).
3. For ESS, Explosive Department & Fire Department License is required.
Process for the Solar Panel and Inverter Import and Installation in
Bangladesh:
1. Solar PV Panel and Inverter Brand should be approved by SREDA (Sustainable
and Renewable Energy Development Authority), Power Division, Ministry of
Power, Energy and Mineral Resources, Government of Bangladesh.
2. For Battery Importation, it is required to declare prior to import as Hazardous
Item and purpose should be mention to the Office of the Chief Controller of
Imports and Exports (CCI&E). For Operation, it is required to take License from
the Department of Explosive as well as the Fire Department.
3. To Install and Operation of the Solar PV Plant, to do the Net Metering from
BPDB is required to take approval and permission from BPDB.
4. After Installation of the Plant, BPDB will visit the plant for Energizing the Net
Metering. BPDB will form a Committee, a SREDA Official might be included in
the committee as a member for approval.
5. For the Installation of the Step-Up Substation, the ELB (Electrical Licensing
Board) License is required before Energization of the Transformer.
Process Flow for the Installation of the Solar PV Plant
Approval Check from
Select Brand IP from CCI&E
SREDA
BPDB Approval for Delivery and
Installation
Net Metering Inspection
For ESS, Explosive
Inspection after
Department License
Installation and Commissioning
and ELB License for
Approval
SubStation
Energization
Electricity Tariff (Changes):
Industrial Connection
Flat Rate (Tariff)
Serial Year Remarks
11kV 33kV
1 2010 4.17 3.92
2 2012 6.81 6.48
3 2014 7.32 7.2
4 2017 8.15 8.05
5 2020 8.55 8.45
6 2023 8.98 8.87 Jan-23
7 2023 9.43 9.31 Feb-23
8 2023 9.90 9.78 Mar-23
9 2024 10.75 10.75 Feb-24