0% found this document useful (0 votes)
67 views3 pages

Masterflow 55

Uploaded by

Hamza Aldaeef
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views3 pages

Masterflow 55

Uploaded by

Hamza Aldaeef
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

®

MASTERFLOW 55
Versatile high strength, non shrink cementitious construction grout
3 days 40 N/mm2
Description
7 days 44 N/mm2
MASTERFLOW 55 is a ready to use product in 28 days 54 N/mm2
powder form, which requires only the on-site
addition of water to produce a non-shrink grout of Bleeding at 24h 0
predictable performance. Expansion % at 24h ASTM C-940 0.2%

Applications
MASTERFLOW 55 is formulated for use at
flowable or plastic consistency. It may be used with
confidence for bedding, grouting and void filling
operations with clearance of greater than 25mm, Anchor Bolts Rail/ Post to Slab
such as but not limited to:
ƒ Void filling between old and new concrete.
ƒ Anchor bolts. Key
ƒ Floor patching. „„ MASTERFLOW 55
ƒ Foundation for machinery. Heavy Equipment
ƒ Cavities Machinery Base
Application Procedure
Advantages
Surface preparation:
ƒ Double expansion All surfaces in contact with the material must be
ƒ Adjustable consistency. sound, dense and clean. All laitance and any
ƒ Micro silica enhanced for strength. unsound material should be removed by light
ƒ High bond strength to steel and concrete. sweep blast, light scabbling or vigorous wire
brushing (Note: heavy scabbling, creating deep
ƒ High early strength development even at
flowable consistency. troughs or high peaks is unsuitable). Surfaces must
be pre-wetted to thoroughly dampen the concrete,
ƒ Impermeable.
but any free surface water must be removed before
MASTERFLOW 55 is placed.
Packaging Particular attention should be paid to bolt holes to
ensure that these are water-free. Use oil free
MASTERFLOW 55 is supplied in 25kg bags. compressed air to blow out bolt holes and pockets
as necessary. Base plates, bolts, etc. must be
Standards tested * clean and free of oil, grease and paint. Set and
align equipment. If shims are to be removed after
ASTM C-109; ASTM C-940 the grout has set, then lightly grease them for easy
Complies with ASTM C-1107 removal.
Ensure formwork is secure and watertight to
Typical properties* prevent movement and leaking during the placing
and curing of the grout.
Water addition Flowable 2.35 ltrs / 25 kg
Plastic 2.2 ltrs / 25 kg Mixing:
Density Flowable 2297 kg / m³ Damp down the inside of the grout mixer with water
Plastic 2363 kg / m³ prior to mixing the initial batch of MASTERFLOW
Compressive Strength N/mm² Flowable 55. Ensure the mixer is damp but free of standing
ASTM C-109: water. Add the pre-measured quantity of water.
Slowly add the MASTERFLOW 55, mixing
24 hours 30 N/mm2 continuously. Mix for 3-5 minutes until a smooth,
®
MASTERFLOW 55
Versatile high strength, non shrink cementitious construction grout
uniform, lump free consistency is achieved. A slow
speed drill with heavy duty paddle can be
employed for 1 or 2 bag mixes
Placing:
Place immediately after mixing, into the prepared Yield / consumption
area in such a manner that the grout has the
shortest distance to flow. Pour the grout Consistency MASTERFLOW Water Yield
continuously maintaining a constant hydrostatic 55
head wherever possible.
Flowable 84 x 25 Kg bags 197 L
MASTERFLOW grouts are suitable for use with 1m3
most types of pumping equipment. Plastic 87 x 25 Kg bags 188 L

Immediately after MASTERFLOW 55 grout is Note:


placed, cover all exposed grout with clean wet
hessian and keep moist until grout surface is ready For precision grouting of heavy machinery use
to be finished, or until final set. Alternatively, MASTERFLOW 928 T or in critical operating
consider the use of a curing membrane from the conditions MASTERFLOW 885.
MASTERKURE range. When a very rapid set is required in areas subject
to chemical spillage or contamination, use epoxy
Storage grouts MASTERFLOW 400 / 410 .
For additional information on MASTERFLOW 55
Store out of direct sunlight, clear of the ground on grout or other non-shrink grouting materials,
pallets protected from rainfall. Avoid excessive contact your Saudi BASF representative.
compaction. Storage life is approximately 12
months when stored in ideal conditions in original Safety precautions
sealed bags.
As with other products containing Portland cement,
Precautions the cementitious material in MASTERFLOW 55
grout may cause irritation. In case of contact with
The temperature of both the grout and elements eyes, immediately flush with plenty of water for at
coming into contact with the grout should be in the least 15 minutes. Call a physician. In case of
range of +5°C to +35°C. Do not use water in an contact with skin, wash skin thoroughly.
amount or at a temperature that will produce a
consistency more than recommended or cause Note
mixed grout to bleed or segregate.
Field service, where provided, does not
MASTERFLOW 55 was formulated for thickness constitute supervisory responsibility. For
above 80mm, however it is suitable for use at a
minimum thickness of 25mm. additional information contact your local BASF
representative.
For applications below 25mm consult Saudi BASF
Technical Services Department for advice.
DO NOT OVERWORK AND AVOID USING BASF reserves the right to have the true cause
MECHANICAL VIBRATION.
of any difficulty determined by accepted test
UNDER NO CIRCUMSTANCES SHOULD
MASTERFLOW 55 BE RETEMPERED BY THE
methods.
LATER ADDITION OF WATER.
Use a mechanically powered grout mixer for optimum
properties. A slow speed drill and mixing paddle may
be used for 1 or 2 bag mixes. Do not mix less than 1
bag or attempt to mix by hand.
MASTERFLOW® 55
Versatile high strength, non shrink cementitious construction grout
Quality and care

All BASF Products are manufactured under a


management system independently certified to
conform to the requirements of the quality,
environmental and occupational health and safety
standards of ISO 9001 and BASF ESHQ
recommendations.

REQUEST AND REFER TO RECOMMENDED


INSTALLATION PROCEDURES FOR
MASTERFLOW GROUTS PRIOR TO USE

Saudi BASF – 12/2007

*Properties listed are only for guidance and are not a guarantee of performance

Saudi BASF For Building Materials Co, .Ltd. (Saudi Arabia)


P.O Box-1884 Al-Khobar 31952 Tel: +966 3 8121140 Fax: +966 3 8121822
Web: www.saudi-basf.com e-mail: [email protected]
Whilst any information contained herein is true, accurate and represents our best knowledge and experience, no warranty is given or implied
with any recommendations made by us, our representatives or distributors, as the conditions of use and the competence of any labour
involved in the application are beyond our control.

As all BASF technical datasheets are updated on a regular basis it is the user's responsibility to obtain the most recent issue.