0% found this document useful (0 votes)
429 views3 pages

MBC CC Block Pipeline Quotation

Uploaded by

akshays230894
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
429 views3 pages

MBC CC Block Pipeline Quotation

Uploaded by

akshays230894
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

MATHRU BHOOMI CONSTRUCTIONS

. Addicted To Superior Quality Work, Progress And Execution.

Date : 1-06-2019 M/s.


Dear Sir,
Kind Attn: - JMC Construction,
Sub: - Quotation for Water Pipe line work for BBMP Project in Kormangala at Bangalore.

With reference to the discussions we had with your good self-regarding the above subject we are pleased about your interest in Water pipe line work
contract. We wish to mention that we are good labour contractor to the above project site. We are here with quoting our best offer for the required project.

Sl. PARTICULARS No. L B D TOTAL UNIT QTY RATE AMOUNT


1). Cutting road surfaces for pipeline trenches and disposing of the excavated stuff as directed including
barricading, danger lighting etc. in the classifications for: Asphalt Road (SR 2017-18, S No.23C, Code
A105B)
MH- 1 to MH- 2 1 x 30.00 x 1.00 x 0.25 7.50
MH- 2 to MH- 3 1 x 30.00 x 1.00 x 0.25 7.50
MH- 3 to MH- 4 1 x 30.00 x 1.00 x 0.25 7.50
MH- 4 to MH- 5 1 x 30.00 x 1.00 x 0.25 7.50
MH- 5 to MH- 6 1 x 30.00 x 1.00 x 0.25 7.50
MH- 6 to MH- 7 1 x 30.00 x 1.00 x 0.25 7.50
MH- 7 to MH- 8 1 x 30.00 x 1.00 x 0.25 7.50
MH- 8 to MH- 9 1 x 30.00 x 1.00 x 0.25 7.50
MH- 9 to MH- 10 1 x 30.00 x 1.00 x 0.25 7.50
MH- 10 to MH- 11 1 x 30.00 x 1.00 x 0.25 7.50
MH- 11 to MH- 12 1 x 30.00 x 1.00 x 0.25 7.50
MH- 12 to MH- 13 1 x 30.00 x 1.00 x 0.25 7.50
MH- 13 to MH- 14 1 x 30.00 x 1.00 x 0.25 7.50
MH- 14 to MH- 15 1 x 30.00 x 1.00 x 0.25 7.50
MH- 15 to MH- 16 1 x 30.00 x 1.00 x 0.25 7.50
MH- 16 to MH- 17 1 x 30.00 x 1.00 x 0.25 7.50
MH- 17 to MH- 18 1 x 30.00 x 1.00 x 0.25 7.50
MH- 18 to MH- 19 1 x 30.00 x 1.00 x 0.25 7.50
MH- 19 to MH- 20 1 x 30.00 x 1.00 x 0.25 7.50
MH- 20 to MH- 21 1 x 30.00 x 1.00 x 0.25 7.50
150.00
Deduction for MHs (-) 20 x 2.18 x 1.00 x 0.25 10.90
Net Qty 139.10 Cum 139.10 1000.00 139100.00
2). EXCAVATING FOR PIPE LINE TRENCHES OF REQUIRED WIDTH by mechanical / & manual means including
dressing sides, ramming of bottoms, providing baricading, danger lighting, shoring, strutting, dewatering,
etc. IN ALL KINDS OF SOIL MIXED WITH BOULDERS of 30 cms size, etc. for : depth upto 2.0 M in all types
of soils (SR 2017-18, S No.7A, Code :A050A)

0 TO 2MTR DEPTH
MH- 1 to MH- 2 1 x 30.00 x 1.00 x 1.50 45.00
MH- 2 to MH- 3 1 x 30.00 x 1.00 x 1.50 45.00
MH- 3 to MH- 4 1 x 30.00 x 1.00 x 1.50 45.00
MH- 4 to MH- 5 1 x 30.00 x 1.00 x 1.50 45.00
MH- 5 to MH- 6 1 x 30.00 x 1.00 x 1.50 45.00
MH- 6 to MH- 7 1 x 30.00 x 1.00 x 1.50 45.00
MH- 7 to MH- 8 1 x 30.00 x 1.00 x 1.50 45.00
MH- 8 to MH- 9 1 x 30.00 x 1.00 x 1.50 45.00
MH- 9 to MH- 10 1 x 30.00 x 1.00 x 1.50 45.00
MH- 10 to MH- 11 1 x 30.00 x 1.00 x 1.50 45.00
MH- 11 to MH- 12 1 x 30.00 x 1.00 x 1.50 45.00
MH- 12 to MH- 13 1 x 30.00 x 1.00 x 1.50 45.00
MH- 13 to MH- 14 1 x 30.00 x 1.00 x 1.50 45.00
MH- 14 to MH- 15 1 x 30.00 x 1.00 x 1.50 45.00
MH- 15 to MH- 16 1 x 30.00 x 1.00 x 1.50 45.00
MH- 16 to MH- 17 1 x 30.00 x 1.00 x 1.50 45.00
MH- 17 to MH- 18 1 x 30.00 x 1.00 x 1.50 45.00
MH- 18 to MH- 19 1 x 30.00 x 1.00 x 1.50 45.00
MH- 19 to MH- 20 1 x 30.00 x 1.00 x 1.50 45.00
MH- 20 to MH- 21 1 x 30.00 x 1.00 x 1.50 45.00
900.00
Deduction for MHs (-) 20 x 2.18 x 1.00 x 1.50 65.40
834.60
Deduciton for pipe volume 1 x 600.00 x 0.785 x 0.30 2 42.39
792.21
Deduction for cutting asphalt portion(-) 139.10
Net Qty 653.11 Cum 653.11 200.00 130622.00
Sl. PARTICULARS No. L B D TOTAL UNIT QTY RATE AMOUNT
3). Supplying S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-
1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work
site, rolling and lowering into trenches, laying true to line and level including loading and unloading at
both destinations and jointing of pipes and specials including cost of specials, perfect linking of joints with
jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for
S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the
required pressure and commissioning etc. complete. (Contractor will make his own arrangements for
procuring water for testing). Before the execution of the work, the contractor shall carry out the survey
and will be paid extra for the same as per seperate item.: (SR 2017-18, S No.252B, Code :T050B)

RCC NP3 Class pipe of 300 mm dia.


MH- 1 to MH- 2 1 x 30.00 30.00
MH- 2 to MH- 3 1 x 30.00 30.00
MH- 3 to MH- 4 1 x 30.00 30.00
MH- 4 to MH- 5 1 x 30.00 30.00
MH- 5 to MH- 6 1 x 30.00 30.00
MH- 6 to MH- 7 1 x 30.00 30.00
MH- 7 to MH- 8 1 x 30.00 30.00
MH- 8 to MH- 9 1 x 30.00 30.00
MH- 9 to MH- 10 1 x 30.00 30.00
MH- 10 to MH- 11 1 x 30.00 30.00
MH- 11 to MH- 12 1 x 30.00 30.00
MH- 12 to MH- 13 1 x 30.00 30.00
MH- 13 to MH- 14 1 x 30.00 30.00
MH- 14 to MH- 15 1 x 30.00 30.00
MH- 15 to MH- 16 1 x 30.00 30.00
MH- 16 to MH- 17 1 x 30.00 30.00
MH- 17 to MH- 18 1 x 30.00 30.00
MH- 18 to MH- 19 1 x 30.00 30.00
MH- 19 to MH- 20 1 x 30.00 30.00
MH- 20 to MH- 21 1 x 30.00 30.00
600.00
Deduction for MHs (-) 20 x 1.20 24.00
Net Qty 576.00 Rmt 576.00 1800.00 1036800.00
4). Disposal off the excess excavated earth of all types by vehicle including loading, unloading with all lead
and lifts, labour, HOM of machineries etc. for: (SR 2017-18, S No.27, Code :A115)

21 x 0.79 x 2.18 2 x 1.50 117.51


Pipe Qty 42.39
159.90
4.0 to 5.0 KM Rs 250.00
Every KM Beyond 5 km/Rs 10.00 x10 Km Rs 100.00
[Link] 350.00
Wet Mix Qty Cum 159.90 350.00 55967.00
5). REFILLING OF EARTH around pipelines, in layers not exceeding 20 cms. in depth, compacting each
deposited layer by ramming after watering all lead and lift including cost of all labour including
consolidation by mechanical means approved by the Engineer in charge, when earth is at suitable
moisture content with desired field desnity upto 95% maximum dry density (modified heavy proctor test)
for restoration of roads without settlement including HOM of machineries, complete. (The contractor
shall take care while consolidating the earth, so that, pipes laid are not damaged due to mechanical
compaction and shall restore the damaged pipes at his own cost, in case of damage) etc. with: (SR 2017-
18, S No.20A, Code :A095A)

Qty of Item No.1 & 2 792.21


Wet Mix Qty 159.90
Net Qty 632.31 Cum 632.31 150.00 94846.00
6). Providing and constructing "WIRE CUT BRICK MANHOLE CHAMBERS" using suplhate resistant cement,
conical in shape at top, with CC [Link] foundation using 40mm and down size graded metal of approved
quality and with an offset of 0.15M alround the chamber. Construct Brick masonry in CM 1:4, 340 mm
thick, with wirecut bricks of approved quality, plaster inside and out side with CM 1:3, 12mm thick,
except for the conical surface outside where the plaster thickness shall be 20mm. Slope inside to be 1:6 in
the concrete towards central drain and finished smooth. Fixing of pipes in CC [Link] with graded metal of
20mm and down size. Supplying and fixing SFRC manhole frame and cover conforming to IS:12592 with
latest amendment, in CC [Link]. Supplying and fixing footsteps made of 12mm dia. steel bars (Fe-415) with
3mm thick plastic encapsulation (IS-10910). The footsteps shall be fixed 30cms apart and on CC block
embeded to masonry wall. The whole works include excavation in all types of soils, watering, curing,
barricading, danger lighting, pouring tar over MH frame and cover, cost of tar, shoring, strutting, de-
watering, engraving manhole number with flow direction on the inner conical surface etc. as per the
drawing etc. as per technical specifications and for the following diameters and depth etc. for:(SR 2017-
18, S No.365, Code :T300) Constructing Brick Masonry Circular Manholes 1.2 m internal dia

1.40 M depth & SFRC cover & frame : On the line Each 10 30000.00 300000.00
1.50 M depth & SFRC cover & frame : On the line Each 10 32000.00 320000.00
Sub-Total 2077335.0
7). C GST @9 % 186960.00
8). S GST @ 9 % 186960.00
Grand-Total 2451255.0