BATTERY SIZING
Let us have total load of 16 kW with 0.8 pf, which needs to be supported by battery
Categories backup for at least 1 hr, when the grid fails. Before choosing the battery with respect to
cost or brand, there are many questions to be answered
Equipments
Which type of battery?
Battery
C-rating of the battery?
What is the UPS Voltage window?
Cable
UPS rating?
Capacitor No: of Batteries (blocs) required?
We're offline
How many cells per bloc? Leave a message
How many blocs in series?
Circuit
How many blocs in string (parallel)? Home Services Projects B
Breaker
What is the End Cell Voltage (ECV)?
Generator What is the Temperature correction factor with respect to the ambient
temperature?
Motor
What is the Discharge power per cell with respect to ECV and backup time?
What is the Discharge current per cell with respect to ECV and backup time?
Solar
What is the ageing factor considering end of life criterion?
inverters
What is the K factor?
Starter For space constraints, bloc dimensions?
No: of blocs per rack?
Transformer
Battery sizing calculation differs with respect to application as well
Transmission
UPS
Line
Telecommunications
Power System Solar Photovoltaic
Studies
REFERENCE STANDARDS / DOCUMENTS:
Arc Flash
IEEE 1184-2006 – Guide for Batteries for Uninterruptible Power Supply Systems
Study
Highlighted values are taken from reputed vendor catalogue available on the internet
Load Flow for calculation purpose.
Study We're offline
UPS BATTERY SIZING CALCULATION: Leave a message
Battery load of UPS should be calculated by considering the following 4 margin factors
Relay
as shown below Home Services Projects B
Coordination
Study Actual load / Inverter Efficiency = Nominal battery load
Temperature correction factor x Design Margin x Aging Margin x Overloading factor =
Short Circuit Battery load
Study
Selected Battery type Sealed Maintanence Free VRLA.
Traction Power UPS Output rating = 20 kVA
System Output Power Factor = 0.8
Actual Load = 16 kW
Uncategorized
Inverter Efficiency (EFF) = 94%
Nominal Battery load = 17.02 kW
Temperature correction factor for 25°C = 1.00
Design Margin = 1.10
Aging Margin = 1.25
Overloading Factor = 1.10
Calculated Battery load = 25.74 kW
End Cell Voltage (ECV) should be maintained
well within the voltage window of the UPS.
Nominal DC voltage = 400 Vdc
Maximum Rectifier equalizing voltage = 432 Vdc We're offline
Inverter low voltage cut-off = 290 Vdc Leave a message
Voltage drop of DC cables is assumed = 2 Vdc
Minimum required UPS voltage = 292 Vdc Home Services Projects B
Boost charge = 2.4 Vdc
Equalizing Cell Voltage = 2.25 Vdc
End cell Voltage (ECV) Selected = 1.75 V/Cell
Nominal Cell Voltage = 2 V/Cell
Battery Model Selected = LX-12 150
Total [Link] cell x ECV > Cut-off voltage
Let us assume 1 hr be the required backup time
Minimum number of cells required = 166.86 Nos.
Total number of cells selected = 180.00 Nos.
Backup time = 60 mins.
Required cell discharge for 1hrs in Watts = 143.03 W/cell
Available cell discharge for 1hrs in Watts = 203 W/cell
[Link] strings = 1 Nos.
Number of cells per bloc = 6 Nos.
As the selected battery bloc is 12V
(Total [Link] 2V cells) / 6 = [Link] Blocs
180/6 = 30
Number of blocs required = 30 Nos.
We're offline
UPS datasheet: Leave a message
Home Services Projects B
We're offline
Leave a message
Thinesh babu V Home Services Projects B
– Power System Designer
April 27th, 2022 | 0 Comments
Share This Article
Leave A Comment
Comment...
We're offline
Name (required) Email (required) Website
Leave a message
Save my name, email, and website in this browser for the next time I comment.
Home Services Projects B
POST COMMENT
CONNECT WITH US
© Copyright 2012 - 2023 | Power Projects India | All Rights Reserved
We're offline
Leave a message