0% found this document useful (0 votes)
31 views9 pages

On Going Percentage

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views9 pages

On Going Percentage

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

PROJECT OWNER : PAROQUIA SAO PAULO LOSPALOS, DIOCESE BAUCAU

PROJECT NAME : NEW CONSTRUCTION OF CHURH SÃO PAULO LOSPALOS- LAUTEM


LOCATION : FUILORO-LOSPALOS
YEAR : 2023
CONTRACTOR : JENIC ENTERPRISES UNIPESSOAL, Lda
UNIT PRICE AMOUNT
NO. DESCRIPTION OF WORK ITEM UNIT QUANTITY Percentage (%)
(USD) (USD)

1 2 3 5 6 = ( 4 x 5) 7
4
A NEW CONSTRUCTION CRUSH BUILDING
I PRELIMINARY WORKS
1 Mobilization & Demobilzation LS 1.00 $ 6,825.00 $ 6,825.00 0.14%
2 Project Board Name Piece 1.00 $ 91.00 $ 91.00 0.00%
3 Kit Direction (Containeer) Unit 1.00 $ 2,093.00 $ 2,093.00 0.09%
4 Material Warehouse M2 24.00 $ 104.65 $ 2,511.60 0.11%
5 Site Clearing M2 6,235.26 $ 1.23 $ 7,660.02 0.32%
6 Water Supply LS 1.00 $ 910.00 $ 910.00 0.04%
7 Temporary Fence M2 200.00 $ 5.92 $ 1,183.00 0.05%
8 Bowplank M 240.00 $ 9.56 $ 2,293.20 0.10%
9 Documentation LS 1.00 $ 400.00 $ 400.00 0.02%
Total I $ 23,966.82
II EARTH WORKS
1 Common Excavation M3 48,552.00 $ 7.25 $ 352,002.00 14.86%
2 Selected Material Filling (CBR 95%) M3 285.60 $ 14.50 $ 4,141.20 0.00%
3 Sand Filling For Foundation Fotplate & Footplate continous 100 mm M3 18.80 $ 12.50 $ 235.00 0.01%
5 Compacting and Flatting M3 285.60 $ 12.50 $ 3,570.00 0.15%
Total II $ 359,948.20
III MASONRY WORKS
1 Stone for foundation area toilet 1:4 m3 4.12 87.5 $ 360.46 0.00%
2 Sand fill thick=5 cm m3 0.63 12.5 $ 7.92 0.00%
3 Hollow Block Wall Installing (1 Pc : 4 Sn) M2 2,537.00 $ 14.50 $ 36,786.50 0.00%
4 Plastering (1 Pc : 4 Sn) M2 5,074.00 $ 6.75 $ 34,249.50 0.00%
5 Cement Lining M2 5,074.00 $ 3.25 $ 16,490.50 0.00%
Total III $ 87,894.89
IV STEEL WORK
1 Supply and Instal Wf for coloum C1 size 300x300x10x18 including all necessary work Kg 26,733.60 $ 3.75 $ 100,251.00 0.00%
2 Supply and Instal Wf for Beam size 300x150x6.5x9 including all necessary work Kg 4,578.00 $ 3.75 $ 17,167.50 0.00%
3 Supply and Instal Wf for Rafter size 200x100x6.5x9 including all necessary work Kg 12,965.37 $ 3.75 $ 48,620.13 0.00%
4 Supply and Instal Wf for Rafter size 300x175x7x11 including all necessary work Kg 22,609.71 $ 3.75 $ 84,786.43 0.00%
5 Supply and Instal Wf for Stair size 200x100x6.5x9 including all necessary work Kg 1,000.59 $ 3.75 $ 3,752.21 0.00%
6 Supplay and install Anchor Bolt M22 For Joint Pedestal and wf bh 810.00 $ 2.50 $ 2,025.00 0.00%
7 Supplay and Base plate thichk=15mm m2 30.00 $ 445.00 $ 13,350.00 0.00%
8 Railing for stair Stainless steel D=1'' kg 801.46 $ 2.86 $ 2,292.16 0.00%
Total IV $ 272,244.43
V CONCRETE WORKS AND STEEL REINFORCEMENT COMPOSITE
1 Lean Concrete for Foot plat (F1 and F2) Fc 20 Mpa M3 46.40 $ 186.55 $ 8,655.92 0.37%
2 Formwork for Foot plat (F1 and F2) Fc 20 Mpa m2 782.40 $ 17.06 $ 13,349.70 0.56%
3 Lean Concrete for ground beam 25cmx5cm Fc 20 Mpa M3 13.94 $ 136.96 $ 1,908.81 0.00%
4 Formwork for ground beam 25cmx50cm Fc 20 Mpa m2 1115.00 $ 25.03 $ 27,902.88 0.00%
5 Concrete for Foot plate (F1) and Pedestal PD1 200cmx200cmx60cm, f'c 30 Mpa M3 556.80 $ 232.64 $ 129,534.79
5.47%
6 Bar D19 for Foot Plate (F1) & Pedestal (PD1) Kg 24,333.49 $ 1.32 $ 32,108.04 1.36%
7 Formwork for Pedestal PD1 & PD2 m2 678.72 $ 25.03 $ 16,984.97 0.72%

8 Concrete for Foot plate (F2) and pedestal (PD2) 200cmx3700cmx60cm, f'c 30 Mpa M3 465.50 $ 191.10 $ 88,957.81
3.76%
9 Bar D19 for Foot Plate (F2) & Pedestal (PD2) Kg 13,333.02 $ 1.32 $ 17,592.91 0.74%
10 Formwork for Foot Plate (F2) & Pedestal (PD2) m2 2,921.53 $ 17.81 $ 52,028.71 2.20%
11 Concrete for Ground Beam 1 25x50 cm, f'c 30 Mpa M3 139.38 $ 191.10 $ 26,634.56 0.00%
12 Bar D19 for Ground Beam 1 25x500 cm Kg 30,562.50 $ 1.32 $ 40,327.22 0.00%
13 Formwork for Ground Beam 1 25x50 cm, f'c 30 Mpa m2 1115.00 $ 20.48 $ 22,829.63 0.00%
14 Concrete for Retaining Wall Thick=15 cm,30 Mpa M3 130.19 $ 191.10 $ 24,879.21 0.00%
15 Bar D13 for Retaining wall Kg 12,035.30 $ 1.32 $ 15,880.57 0.00%
16 Formwork for Retaining wall m2 867.93 $ 20.48 $ 17,770.87 0.00%
17 Bar D13 for Ground Floor Slab Kg 33,990.67 $ 1.32 $ 44,850.68 0.00%
Concrete for Coloum Composite 400mmx400mm with cover 50mm, f'c 25 Mpa Code
18 m3 113.39 $ 173.36 $ 19,656.79
(C1) 0.00%
19 Bar D13 for Coloum Composite Code (C1) Kg 12,728.37 $ 1.32 $ 16,795.09 0.00%
20 Formwork for Coloum Composite Code (C1) m2 283.48 $ 35.04 $ 9,931.58 0.00%
21 Concrete for Coloum Composite D=50 with cover 50mm, f'c 25 Mpa Code (C2) M3 3.02 $ 173.36 $ 522.77 0.00%
22 Bar D13 for Coloum Composite Code (C2) Kg 910.60 $ 1.32 $ 1,201.54 0.00%
23 Concrete for Second floor Beam Composite 250mmx400mm with cover 50mm, f'c 25 m3 108.88 $ 173.36 $ 18,874.03 0.00%
24 Bar D13 for Second floor Beam Composite Elv=4.085 m & elev=9.045 Kg 9,482.23 $ 1.32 $ 12,511.81 0.00%
25 Formwork for Second floor Beam Composite Elv=4.085 m & elev=9.045 m2 615.00 $ 45.56 $ 28,021.68 0.00%
Concrete for Third floor & Tower Beam Composite 250mmx400mm with cover
26 m3 47.00 $ 173.36 $ 8,147.69
50mm, f'c 25 Mpa 0.00%
27 Bar D13 for Third floor Beam Composite Kg 3,674.64 $ 1.32 $ 4,848.68 0.00%
28 Formwork for Third floor Beam Composite m2 213.00 $ 45.56 $ 9,705.07 0.00%
29 Concrete for Second Floor Slab t=15 cm, f'c 30 Mpa m3 42.32 $ 173.36 $ 7,335.52 0.00%
30 Bar D13 for Second floor Composite Kg 37,440.00 $ 1.32 $ 49,402.08 0.00%
31 Bondex Thick=1mm m2 352.63 $ 10.01 $ 3,529.78 0.00%
32 Concrete for Lintel beam arku 10x20 cm, f'c 20 Mpa M3 0.10 $ 173.36 $ 17.34 0.00%
33 Bar D13 For Lintel Beam For Door and Windows Kg 1,597.02 $ 1.32 $ 2,107.27 0.00%
34 Formwork For Lintel Beam For Door and Windows m2 139.20 $ 45.56 $ 6,342.47 0.00%
35 Concrete for Lintel beam 10x20 cm, f'c 20 Mpa For Door And windows M3 1.74 $ 173.36 $ 301.64 0.00%
36 Concrete for Cantilever Thick=10 cm M3 0.52 $ 173.36 $ 89.71 0.00%
37 Bar D13 For Cantilever Beam Kg 905.54 $ 1.32 $ 1,194.85 0.00%
38 Formwork For Cantilever Beam m2 62.10 $ 43.23 $ 2,684.27 0.00%
39 Concrete for Coloum Stiffener 15x15 cm fc 30 Mpa M3 10.48 $ 173.36 $ 1,816.30 0.00%
40 Bar D13 For Coloum Stiffener Kg 32,277.32 $ 1.32 $ 42,589.92 0.00%
41 Formwork For Coloum Stiffener m2 279.40 $ 20.48 $ 5,720.63 0.00%
42 Bar D13 for Stair Kg 582.39 $ 1.32 $ 768.47 0.00%
43 Formwork for Stair m2 54.74 $ 36.58 $ 2,002.68 0.00%
44 Bondex Thick=1mm m2 0.15 $ 9.56 $ 1.39 0.00%
Total V $ 838,318.32
VI TILE WORKS
1 Granite, 600 x 600 mm (Roman) In Room M2 1,737.93 $ 30.49 $ 52,980.76 0.00%
2 Granite, 600 x 600 mm (Rough) Roman in Veranda M2 425.00 $ 30.49 $ 12,956.13 0.00%
3 Granite, 600 x 600 mm (Rough) Roman in Altar M2 316.70 $ 30.49 $ 9,654.64 0.00%
4 Granite Floor Toilet Installing (200 x 200 mm) Rough M2 8.30 $ 30.49 $ 253.03 0.00%
5 Granite Wall Installing (300 x 300 mm) Area Toilet M2 47.05 $ 29.58 $ 1,391.50 0.00%
6 Granite Plint, 100 x 600 mm (Roman) M 350.00 $ 3.64 $ 1,274.00 0.00%
Total VI $ 78,510.05
VII ROOFING WORKS
1 Roof Frame Works, Steel SHS cf.100x50x3 + Accesories M 2,867.93 $ 8.20 $ 23,517.03 0.00%
2 Roof Frame Works, Steel SHS cf. 80x40x3 + Accesories M 2,506.77 $ 8.20 $ 20,555.51 0.00%
3 Purlins Works, SHS cf. 80x40x3 + Accessories M 3,416.46 $ 8.20 $ 28,014.99 0.00%
4 Wind Bond Works, Ø 16mm M 622.00 $ 8.20 $ 5,100.40 0.00%
5 Trekstang Works, Ø 12mm M 439.79 $ 8.20 $ 3,606.29 0.00%
6 Corrugated Headland Roofing Installing, 0.42 mm M2 2,639.06 $ 28.88 $ 76,216.05 0.00%
7 Ridge Capping Installing, 0.42 mm M 185.00 $ 22.50 $ 4,162.50 0.00%
Total VII $ 161,172.78
VIII CEELING WORKS
1 Ceiling List Installing, Teak Wood M 270.00 $ 3.75 $ 1,012.51 0.00%
2 Calcibord Ceiling Works T6 mm M2 2,555.06 $ 14.00 $ 35,770.88 0.00%
3 Steel Hollow Box Frame 40x40x1,8 mm & 20x40x1.8 (Complete+ Acsesories) M2 2,555.06 $ 14.00 $ 35,770.88 0.00%
Total VIII $ 72,554.28
IX DOOR AND WINDOW WORKS
1 Doors Works and Installing, Type D1 (Complete + Acsesories) UNIT 7.00 $ 1,700.00 $ 11,900.00 0.00%
2 Doors Works and Installing, Type D2 (Complete + Acsesories) UNIT 9.00 $ 530.00 $ 4,770.00 0.00%
3 Doors Works and Installing, Type D3 (Complete + Acsesories) UNIT 4.00 $ 500.00 $ 2,000.00 0.00%
4 Windows Works and Installing, Type W1 (Complete + Acsesories) UNIT 58.00 $ 500.00 $ 29,000.00 0.00%
5 Windows Works and Installing, Type W2 (Complete + Acsesories) UNIT 4.00 $ 500.00 $ 2,000.00 0.00%
6 Windows Works and Installing, Type W3 (Complete + Acsesories) UNIT 12.00 $ 500.00 $ 6,000.00 0.00%
7 Windows Works and Installing, Type W4 (Complete + Acsesories) UNIT 3.00 $ 500.00 $ 1,500.00 0.00%
8 Windows Works and Installing, Type V1 (Complete + Acsesories) UNIT 290.00 $ 340.00 $ 98,600.00 0.00%
Windows Works + Glass 10 mm + Frame + Muzaic (Lukisan Familia Nazaret) and
9 UNIT 403.00 $ 160.00 $ 64,480.00
Installing, For tower 0.00%
Total IX $ 220,250.00
X PAINTING WORKS
1 Ceiling Painting M2 2,555.06 $ 3.25 $ 8,303.95 0.00%
3 Wall Painting For Interior And Exterior M2 5,074.00 $ 3.25 $ 16,490.50 0.00%
Total X $ 24,794.45
XI SANITATION AND PLUMBING WORKS
1 Cold Water Pipe Installation, Galv. 3/4" M 30.00 $ 14.00 $ 420.00 0.00%
2 Sewage Water Pipe Installation, PVC 4" M 24.00 $ 15.50 $ 372.00 0.00%
3 Waste Water Pipe Installation, PVC 3" M 4.00 $ 12.50 $ 50.00 0.00%
4 Wastafel Faucet Installation UNIT 2.00 $ 98.50 $ 197.00 0.00%
5 Jet Washer Installation UNIT 2.00 $ 96.00 $ 192.00 0.00%
6 Floor Drain Installation UNIT 6.00 $ 25.50 $ 153.00 0.00%
7 Wastafel Installation UNIT 6.00 $ 220.00 $ 1,320.00 0.00%
8 Sit Closet Installation UNIT 4.00 $ 480.50 $ 1,922.00 0.00%
9 Toilet Paper Holder Installation UNIT 2.00 $ 25.00 $ 50.00 0.00%
10 Heavy Duty Mirror Installation UNIT 2.00 $ 45.00 $ 90.00 0.00%
11 Septic Tank 3x2x2 + Infiltrated Well UNIT 2.00 $ 1,300.00 $ 2,600.00 0.00%
Total XI $ 7,366.00
XII ELECTRICAL WORKS
1 TBS 318 2xLEDW30L120 36W (Prismatik Cover) unit 20.00 $ 55.75 $ 1,115.00 0.00%
2 SOROT LED 4X12 WATT, Recessed Mounted unit 73.00 $ 29.00 $ 2,117.00 0.00%
3 Cap Hanging Light + LED 20 Watt unit 12.00 $ 90.00 $ 1,080.00 0.00%
4 Led 18 Watt Recessed Mounted unit 80.00 $ 20.50 $ 1,640.00 0.00%
5 Circular Led 22 Watt unit 3.00 $ 18.25 $ 54.75 0.00%
6 Downlight Led 7 Watt unit 13.00 $ 45.50 $ 591.50 0.00%
7 Wall Light + LED 12 Watt unit 14.00 $ 29.55 $ 413.70 0.00%
8 Wall Light + LED 2x5 Watt unit 12.00 $ 22.55 $ 270.60 0.00%
9 Wall Light 3 Watt Recessed Mounted unit 5.00 $ 10.00 $ 50.00 0.00%
10 Stair Light 3 Watt unit 12.00 $ 10.12 $ 121.44 0.00%
11 Single Switch unit 12.00 $ 6.00 $ 72.00 0.00%
12 Double Switch unit 15.00 $ 6.55 $ 98.25 0.00%
13 2-Ways Switch unit 14.00 $ 12.00 $ 168.00 0.00%
14 Single Power Socket Outlet unit 4.00 $ 12.00 $ 48.00 0.00%
15 Double Power Socket Outlet unit 20.00 $ 12.50 $ 250.00 0.00%
16 Wall Fan unit 6.00 $ 120.50 $ 723.00 0.00%
17 Ceiling Fan unit 4.00 $ 125.50 $ 502.00 0.00%
18 Exhaust Fan unit 4.00 $ 55.12 $ 220.48 0.00%
19 NYM 3X1.5mm2 + 20mm uPVC m' 700.00 $ 3.65 $ 2,555.00 0.00%
20 NYM 3X2.5mm2 + 20mm uPVC m' 500.00 4.25 $ 2,125.00 0.00%
21 Tap Connector unit 4.00 $ 2.50 $ 10.00 0.00%
Total XII $ 14,225.72
A SOUND SYSTEM
1 Power Amplifier ST-PA 1000 W "SOUNDTRON" unit 1.00 $ 1,000.00 $ 1,000.00 0.00%
2 G93 Passive Wall Speaker 220Watt unit 6.00 $ 140.00 $ 840.00 0.00%
3 Unit Mixer 24CH MGP24X " YAMAHA" 16 Mic Input unit 1.00 $ 750.00 $ 750.00 0.00%
4 Mic Wireless ST-2000WM PRO "SOUNDTRON" Digital UHF set 1.00 $ 300.00 $ 300.00 0.00%
5 Mic Wall Socket unit 6.00 $ 6.00 $ 36.00 0.00%
6 Podium Mic unit 2.00 $ 26.00 $ 52.00 0.00%
7 Table Stand Mic unit 1.00 $ 30.00 $ 30.00 0.00%
8 Speaker Selector 10 Zone unit 1.00 $ 80.00 $ 80.00 0.00%
9 Cable Audio "PROEL" m' 2.00 $ 5.00 $ 10.00 0.00%
10 Cable sommer Stage 22 2x0,22mm m' 150.00 $ 4.50 $ 675.00 0.00%
11 Cable NYMHY 2 x 2,5 mm² m' 120.00 $ 2.00 $ 240.00 0.00%
12 Organ Yomaha + Accessories UNIT 1.00 $ 3,200.00 $ 3,200.00 0.00%
13 $ 750.00 $ 6,000.00
Speaker Complete & Installation ( SAMSON AURO X15D 2-WAY ACTIVE SPEAKER) UNIT 8.00 0.00%
Total A $ 13,213.00
B DISTRIBUITION PANEL
A.1 MAIN PANEL
Pilot Lamp
Volt Meter
a Mastuka MCB 2 A set 1.00 $ 150.00 $ 150.00 0.00%
Accessories
Grounding
b MCCB 80 A 3P ls 1.00 $ 120.00 $ 120.00 0.00%
c Input Cable NFA 3X35+1X25mm unit 1.00 $ 250.00 $ 250.00 0.00%
d Manual Change Over Switch 100 A 4P m' 30.00 $ 150.00 $ 4,500.00 0.00%
C GROUND FLOOR PANEL (P GF)
1 Indoor Panel 40x30x20 Unit 1.00 $ 35.00 $ 35.00 0.00%
2 MCCB 40 A 3P Unit 1.00 $ 65.00 $ 65.00 0.00%
3 RCCB/RCD 25 A 30mA 2P Unit 3.00 $ 55.00 $ 165.00 0.00%
4 MCB 6 A 1P Unit 7.00 $ 10.00 $ 70.00 0.00%
5 MCB 10 A 1P Unit 1.00 $ 10.00 $ 10.00 0.00%
6 MCB 16 A 1P Unit 1.00 $ 10.00 $ 10.00 0.00%
7 MCB 20 A 1P Unit 3.00 $ 9.50 $ 28.50 0.00%
8 Theben Timer Unit 1.00 $ 20.00 $ 20.00 0.00%
9 Input Cable NYY 4X6 mm2/ + PVC m' 2.00 $ 15.00 $ 30.00 0.00%
D FIRST FLOOR PANEL (P FF)
1 Indoor Panel 40x30x20 Unit 1.00 $ 37.00 $ 37.00 0.00%
2 MCCB 40 A 3P Unit 1.00 $ 62.00 $ 62.00 0.00%
3 RCCB/RCD 25 A 30mA 2P Unit 3.00 $ 49.53 $ 148.59 0.00%
4 MCB 6 A 1P Unit 7.00 $ 10.00 $ 70.00 0.00%
5 MCB 10 A 1P Unit 1.00 $ 10.00 $ 10.00 0.00%
6 MCB 16 A 1P Unit 2.00 $ 10.00 $ 20.00 0.00%
7 MCB 20 A 1P Unit 2.00 $ 9.50 $ 19.00 0.00%
8 Theben Timer Unit 1.00 $ 25.00 $ 25.00 0.00%
9 Input Cable NYY 4X6 mm2/ + PVC m' 5.00 $ 10.78 $ 53.90 0.00%
C LANDSCAPE LIGHTING
1 Cap Column Light + Led 5 Watt unit 58.00 $ - 0.00%
2 Garden Light Led 25 Watt + Accessories unit 4.00 $ - 0.00%
3 NYY 2X1.5mm2 + 20mm uPVC m' 150.00 $ - 0.00%
Total B $ 5,898.99
XIII FUNITURE ( Production in Solo Indonesia & ITALY)
1 The Altar Table is a Carving ( length 3,6 meters & Wide 1,2 Meters) Teak Wood UNIT 1.00 $ 2,900.00
$ 2,900.00 0.00%
2 Chair for People ( length 5,50 meters) Teak Wood + Accessories UNIT 138.00 $ 1,000.00
$ 138,000.00 0.00%
3 Chair for People Standar UNIT 600.00 $ 42.00
$ 25,200.00 0.00%
4 Chair for Pastor (Teak Wood) is a carving UNIT 3.00 $ 250.00
$ 750.00 0.00%
5 Podium for the reading of the bible (Teak Wood) UNIT 2.00 $ 400.00
$ 800.00 0.00%
6 Bell Tower ( Production of Italy) + Accessories UNIT 1.00 $ 13,000.00
$ 13,000.00 0.00%
7 Statue: São Paulo, Dom Bosco, Nai Feto, Cruss Iha Altar ( Production of Italy) + Acces UNIT 4.00 $ 2,000.00
$ 8,000.00 0.00%
$ 188,650.00 0.00%
A TOTAL BUILDING $ 2,369,007.93 31.05%
C CONTRACTOR FEE 10% $ 236,900.79
D TAX 2% $ 52,118.17
GRAND TOTAL EXCLUDE CONSULTANT FEE $ 2,658,026.90

Dili, 12 Julho 2024


Jenic Enterprises Unipessoal, Lda

Eng. Joao Soares Pereira


Director