Excavation and Concrete Quantities for Bridge

estimation

Uploaded by

abdul munaf
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views10 pages

Excavation and Concrete Quantities for Bridge

estimation

Uploaded by

abdul munaf
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

NAME OF PROJECT: CONSTRUCTION OF 35 METERS RCC BRIDGE

(CALSS 40T) OVER HASSANABAD NULLAH, B&R DIVISION, GB PWD


GHANCHE

QUANTITY OF EXCAVATION
Area Total
Location No.s Depth
Length Width Excavation
(m) (m) (m) (cu.m)
At Grid A 1 17 4 68.00
At Grid B 1 17 4 68.00
Total 136.00
QUANTITY OF CONCRETE
Area Total with
Member No.s Height Sub
Length Width Concrete addition
Total
(mm) (mm) (mm) (cu.m) (cu.m)
AT GRID A & B
Piles 6 453416 15000 40.81 53.05 53.05
piles cap 2 17000000 1000 34.00 34.00 34.00
Columns 4 900 900 3000 9.72 9.72
Columns Cap 2 4800 1350 1000 12.96 12.96
Retaining Block 2 2190 350 350 0.54 0.54 45.85
Back wall 2 5000 300 5265 15.80 15.80
Wing walls 4 300 5694857 6.83 6.83

Deck Slab 1 35000 5000 225 39.38 39.38


44.21
Railing posts & Footpath 2 35000 230 300 4.83 4.83
Approach slabs 2 2000 5000 225 4.50 4.50 4.50

Wearing Course (sq.m) 1 39000 4540 177.06 sqm

Girder I-Section 2 31850 760975 48.47 48.47


Girder Rectangular 56.46
4 1500 1331528 7.99 7.99
Section

End Diaphragms 2 2190 250 2115 2.32 2.32


5.79
Internal Diaphragms 3 2190 250 2115 3.47 3.47

Summary of Concrete
Piles 53.05
Piles Caps 34.00
Columns, columns
cap,Retaining Block, back-
45.85
wall and wing-wall at Grid
A&B
Deck Slab 44.21
Approach Slab 4.50
Diaphram 5.79
Girders 56.46
Total 243.85

2
QUANTITY OF REINFORCING STEEL
No of Bars
Bar Bar Bar Total Total
Location Nos. Bar With addition Sub
Size Weight Legth Width Length Weight
Spacing Total
(Kg/m) (mm) (mm) (mm) (mm) (kg) (Kg)
AT GRID A & B
Piles
Main Bars #8 3.97 6 16000 12 1152000 4573.44 4573.44
Spiral (middle) #3 0.56 6 2300 13800 75 2553000 1429.68 1429.68 6464.22
Spiral (at ends) #3 0.56 6 2300 2200 37.5 823400 461.10 461.10
Piles Cap
Along Length(Top & Bot) #6 2.23 4 4000 2000 150 229333.33 511.41 511.41

˝ #6 2.23 4 3000 3000 150 252000 561.96 561.96


Along Length(middle) #6 2.23 4 4000 4 64000 142.72 142.72
Along Length(Diagonal) #8 3.97 4 4880 10 195200 774.94 774.94 4031.13
Along width(Top & Bot) #6 2.23 4 5000 2000 150 286666.67 639.27 639.27

˝ #6 2.23 4 3500 2000 150 200666.67 447.49 447.49


Along width(Middle) #6 2.23 4 5000 4 80000 178.40 178.40
Along Width(Diagonal) #8 3.97 4 4880 10 195200 774.94 774.94

3
No of Bars
Bar Bar Bar Total Total
Location Nos. Bar With addition Sub
Size Weight Legth Width Length Weight
Spacing Total
(Kg/m) (mm) (mm) (mm) (mm) (kg) (Kg)
Columns
Main bars #8 3.97 4 5000 24 480000 1905.60 1905.60
Ties #4 0.99 4 8880 5000 150 1219520 1207.32 1207.32
Columns Cap
Main Bars (Top & Bot) #8 3.97 2 4800 20 192000 762.24 762.24
Main Bars (middle) #6 2.23 2 4800 20 192000 428.16 428.16
Outer rings #6 2.23 2 4550 4800 130 345100 769.57 769.57
Inner rings #4 0.99 2 2900 4800 130 219953.85 217.75 217.75
Back Wall
9180.62
Horizontal (Both Faces) #4 0.99 2 12600 7500 200 970200 960.50 960.50
Vertical (Both Faces) #6 2.23 4 7500 5000 200 780000 1739.40 1739.40
Wing Walls
Horizontal (Both Faces) #4 0.99 8 2000 3675 150 408000 403.92 403.92
Vertical (Both Faces) #4 0.99 8 3675 2000 150 421400 417.19 417.19
Additional Bars( Horizontal) #8 3.97 4 3000 4 48000 190.56 190.56
Additional Bars( Horizontal) #6 2.23 4 3000 4 48000 107.04 107.04
Additional Bars( Horizontal) #6 2.23 4 2000 4 32000 71.36 71.36

4
No of Bars
Bar Bar Bar Total Total
Location Nos. Bar With addition Sub
Size Weight Legth Width Length Weight
Spacing Total
(Kg/m) (mm) (mm) (mm) (mm) (kg) (Kg)
Deck Slab
Along Length(Bot) #4 0.99 1 35000 5000 150 1201667 1189.65 1189.65
Along width(Bot) #5 1.55 1 5000 35000 175 1005000 1557.75 1557.75
Along Length(Top) #4 0.99 1 35000 5000 150 1201667 1189.65 1189.65
Along width(Top) #5 1.55 1 5000 35000 200 880000 1364.00 1364.00
Approach slab
Along Length(Bot & Top) #4 0.99 2 4000 5000 150 274666.67 271.92 271.92
Along width(Bot & Top) #4 0.99 2 5000 4000 150 276666.67 273.90 273.90 6633.45
Retaining Block
Main bars #6 2.23 2 2790 3 16740 37.33 37.33
Transverse bars #4 0.99 2 1845 2190 200 44095.5 43.65 43.65
Railing Post
At Both Ends of Slab #6 2.23 2 35000 2 140000 312.20 312.20
Transverse bars #3 0.56 2 1250 35000 125 702500 393.40 393.40

5
No of Bars
Bar Bar Bar Total Total
Location Nos. Bar With addition Sub
Size Weight Legth Width Length Weight
Spacing Total
(Kg/m) (mm) (mm) (mm) (mm) (kg) (Kg)
Girder I-Section
Bottom Flange #6 2.23 2 34850 8 557600 1243.45 1305.62
″ #6 2.23 2 34850 2 139400 310.86 326.41
Top Flange #6 2.23 2 34850 6 418200 932.59 979.22
″ #6 2.23 2 34850 2 139400 310.86 326.41
Web(Both Faces) #4 0.99 4 34850 1210 150 1263893 1251.25 1313.82
Stirrups in web
I- sections #4 0.99 2 4600 15314 150 948458.67 938.97 985.92
#4 0.99 2 4600 18164 200 844744 836.30 878.11
Rectangular Sections #4 0.99 2 5350 2400 125 216140 213.98 224.68
#4 0.99 2 5350 1200 75 181900 180.08 189.09
Stirrups (in Bot flanges) 0.00
I- sections #4 0.99 2 2000 31850 150 853333.33 844.80 887.04
Rectangular Sections #4 0.99 2 1375 3000 150 57750 57.17 60.03 9359.94
Stirrups (in Top flanges) 0.00
″ #4 0.99 2 1590 33600 150 715500 708.35 743.76
Additional Bars 0.00
At Center line #3 0.56 8 2510 1210 150 182058.67 101.95 107.05
″ #4 0.99 8 2562 1210 150 185830.4 183.97 193.17
#4 0.99 4 4600 1210 150 166826.67 165.16 173.42

6
9359.94

No of Bars
Bar Bar Bar Total Total
Location Nos. Bar With addition Sub
Size Weight Legth Width Length Weight
Spacing Total
(Kg/m) (mm) (mm) (mm) (mm) (kg) (Kg)
At Ends 0.00
C shaped #6 2.23 4 3315 2 26520 59.14 62.10
N shaped (for lifting) #6 2.23 4 3315 4 53040 118.28 124.19
MAT 0.00
Horizontal #4 0.99 16 655 2000 100 220080 217.88 228.77
Vertical #4 0.99 16 2000 655 100 241600 239.18 251.14

Diaphragms (Internal)
Vertical (Rings) #6 2.23 3 4630 2000 150 199090 443.97 443.97
Horizontal Bottom #6 2.23 3 2000 6 36000 80.28 80.28
Horizontal (Both Faces) #4 0.99 3 2000 6 36000 35.64 35.64
In deck slab #6 2.23 3 2000 3 18000 40.14 40.14
Diaphragms (At Ends) 946.53
Vertical (Rings) #6 2.23 2 4630 2000 150 132726.67 295.98 295.98
Horizontal Bottom #6 2.23 2 2000 6 24000
Horizontal (Both Faces) #4 0.99 2 2000 6 24000 23.76 23.76
In deck slab #6 2.23 2 2000 3 12000 26.76 26.76

summary
SUB STRUCTURE

7
No of Bars
Bar Bar Bar Total Total
Location Nos. Bar With addition Sub
Size Weight Legth Width Length Weight
Spacing Total
(Kg/m) (mm) (mm) (mm) (mm) (kg) (Kg)
Piles 6464
Pile caps 4031
SUPER STRUCTURE 26121
Total 36616

8
QUANTITY OF PRESTRESSING STEEL
Strand No. of Length of No of No of Total Total
Strand Weight Strands each Tendon Tendons Girders Length of Strands Weight
Member
Size
(Kg/m) (in one Tendon) (mm) (in one Girder) (m) (kg)
(0.5")
Girder 0.775 12 34900 5 2 4188 3245.7
13mm
QUANTITY OF MS LINING
Area Total Total with
Member No.s Height Unit Weight
Perimeter Thichness Volume Weight addition
(mm) (mm) (mm) (cu.m) kg/cu.m kg kg

Pile Casing (A & B) 6 2388 12.7 15000 2.73 7850 21426 22498