Luberef Yanbu Refinery Expansion Project
Subject of JHA JHA No. 18 Rev. No. 2
JOB HAZARD ANALYSIS Discipline Rev Date
Job Hazard Analysis for STOPAQ Wrapping
(JHA) Civil Elec. Struc. Piping
Other
_______________________________
SSA Discipline Manager SSA Safety Manager SSA Construction Manager
Prepared by Sign Reviewed by Sign A Approved by Sign
ved
Date Date D Date
a
Activity Potential Hazards Preventive Measures Risk Responsible Remarks
Rating Person
Risk From: 1. All workers should be aware with
1 Collapse of stocked the work place hazards. L Project/Site Regular Site
Handling and Storage materials 2. Materials should not over stock Manager Inspection.
in storage area or in working
Risk Of: location. HSE Supervisor Daily Tool Box
Physical 3. Barricade the materials and post Meeting
injury/Damage to sign indicating hazards near the Site Supervisor
property barricade. Daily
4. Appropriate wooden supports Foreman Observation
fasten with nails must be
provided in the STOPAQ materials
prior to stocking.
5. Received materials shall be
stored according to
manufacturer’s recommendation
MSDS.
1
Risk From: 1. Necessary permits for all related
Suffocation, Heat activities within the construction L Project/Site Regular Site
Installation and Stopaq stress, Slip, trips and site shall be obtained prior to the Manager Inspection.
2 Wrapping at Confined fall from same level commencement of any job.
space Confined space permit shall be HSE Supervisor Daily Tool Box
Risk Of: secured prior to start U/G work Meeting
Physical activities. Unusual and Site Supervisor
injury/Damage to unexpected acute hazard may be Daily
property encountered while working inside Foreman Observation
manholes or any confine spaces,
therefore, it is required that all
personnel involved in this
activities shall be trained with the
nature of job hazard associated
with the works.
2. Conduct atmospheric
monitoring/gas testing to air
quality in relation to exposure
standard to atmospheric
contaminants:
3. Provide exit/entry attendant or
stand by man and record exit and
entry on the log.
4. Provide exit and entry access
every 50 meters length of trench.
5. Ventilation is a necessity when
working in confined spaces
hazardous chemicals and solvent
vapors tend to migrate to lower
levels. Tools shall be correctly
selected for the purpose; extreme
care should be used if tools have
ability to create sparks in the
presence of flammable vapors.
Smoking is absolutely prohibited in
any worksite. PPE shall be used at
2
Risk from: 1. To achieved and maintain L
3 Hazardous waste environmentally sound practices Project/Site Regular Site
Waste Disposal for sanitation and for Manager Inspection.
Risk of: conservation of the environment,
Work related the contractor has to monitor HSE Supervisor Daily Tool Box
diseases/sickness waste accumulation and to Meeting
ensure prompt and correct Site Supervisor
disposal of the waste materials. Daily
2. Non-hazardous wastes, Foreman Observation
hazardous waste and inert
construction wastes at project
site shall be segregated
separately. The contractor and
sub-contractor HSE Personnel
shall maintain a waste inventory
to keep a record of the types and
quantities of waste present at the
job sites.
3. Waste materials shall be
segregated at source by
providing colored and marked
(with universal symbols and
signage in Arabic and English)
bins/ containers the waste