Instrumentation ITP FOR SIPCHEM GRP REPLACEMENT

Uploaded by

Yasser
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views4 pages

Instrumentation ITP FOR SIPCHEM GRP REPLACEMENT

Uploaded by

Yasser
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Plant-Tech Arabia Co.Ltd.

Inspection Tracking Plan (ITP)


Client Name SIPCHEM ITS No PTA-ITP-SP-02 Revision No 0 Date 14/Oct/24

Project Code Responsible Prepared By Reviewed By Accepted By

Drawing #. Designee SIPCHEM INSPECTION TEAM

Equipment # /Package # Name

Descrption Signature

A=Approval, H=Hold Pont, I=Information, M=Monitor, R=Document Review, S=Surveillance, W=Witness, Indicates revision

VERIFYING DOCUMENTS INSPECTION ACTIVITIES BY


EXAMINATION & INSPECTION TECHNICAL DOCUMENTS
Sl#
ACTIVITIES (if applicable)
SIPCHEM SIPCHEM
SIPCHEM
ACCEPTANCE CRITERIA RECORD / REFERENCE PLANT TECH QC OPERATION / INSPECTION REMARKS
MAINTENANCE
PROCESS TEAM

DOCUMENTS REVIEW

1 Review & Approval of Inspection & Test Plan. Approved Drawings Approved drawings Shop Drawings R NA NA R/A

2 Approval of method statement As per Scope of Work R R/A NA R/A

3 Design and Drawings Approved Drawings Approved drawings Shop Drawings R NA NA R

4 Material Approval Design Specification Approved Material submiitals MTC/Data sheet H R NA R

5 Lifting Plans As per Sipchem procedure Rigging Plan H R/A NA R

MATERIAL RECEIVING (REMOVAL OF FIELD INSTRUMENTS)

Removal & Disconnection of Temperature


6 Approved drawings Approved drawings Scope of work H NA NA H
Transmitter & Temperature Element

Removal of Pressure Gauges & Temperature


7 Approved drawings Approved drawings Scope of work H NA NA H
Gauges

Removal & Disconnection of Pressure


8 Approved drawings Approved drawings Scope of work H NA NA H
Transmitters

Page 1 821659066.xlsx
A=Approval, H=Hold Pont, I=Information, M=Monitor, R=Document Review, S=Surveillance, W=Witness, Indicates revision

VERIFYING DOCUMENTS INSPECTION ACTIVITIES BY


EXAMINATION & INSPECTION TECHNICAL DOCUMENTS
Sl#
ACTIVITIES (if applicable)
SIPCHEM SIPCHEM
SIPCHEM
ACCEPTANCE CRITERIA RECORD / REFERENCE PLANT TECH QC OPERATION / INSPECTION REMARKS
MAINTENANCE
PROCESS TEAM

9 Removal & Disconnection of Control Valve Approved drawings Approved drawings Scope of work H NA NA H

10 Removal & Disconnection of On-Off Valve Approved drawings Approved drawings Scope of work H NA NA H

Removal & Disconnection of Flowmeter


11 Approved drawings Approved drawings Scope of work H NA NA H
Coriolis

Proper Tagging and Identification Shall be


12 Approved drawings Approved drawings Approved drawings H NA NA H
placed in the Field

Approved Procedure /
Visual Inspection of all Removed field
13 Manufacturer Approved drawings Project specs / Standards H NA NA H
Instruments for any damage
Recommendations.

Approved Procedure /
14 Handling, Tagging, Storage & Preservation Manufacturer Approved MRIR Project specs / Standards H NA NA R/A
Recommendations.

RE-INSTALLATION OF FIELD INSTRUMENTS

Installation & Re-connection of Temperature Approved Drawings, Visual check


15 RFI & Checklist Scope of work H M W H
Transmitter & Temperature Element satisfactory

Installation of Pressure Gauges & Temperature Approved Drawings, Visual check


16 RFI & Checklist Scope of work H M W H
Gauges satisfactory

Installation & Re-connection of Pressure Approved Drawings, Visual check


17 RFI & Checklist Scope of work H M W H
Transmitters satisfactory

Approved Drawings, Visual check


18 Installation & Re-connection of Control Valve RFI & Checklist Scope of work H M W H
satisfactory

Approved Drawings, Visual check


19 Installation & Re-connection of On-Off Valve RFI & Checklist Scope of work H M W H
satisfactory

Installation & Re-connection of Flowmeter Approved Drawings, Visual check


20 RFI & Checklist Scope of work H M W H
Coriolis satisfactory

Page 2 821659066.xlsx
A=Approval, H=Hold Pont, I=Information, M=Monitor, R=Document Review, S=Surveillance, W=Witness, Indicates revision

VERIFYING DOCUMENTS INSPECTION ACTIVITIES BY


EXAMINATION & INSPECTION TECHNICAL DOCUMENTS
Sl#
ACTIVITIES (if applicable)
SIPCHEM SIPCHEM
SIPCHEM
ACCEPTANCE CRITERIA RECORD / REFERENCE PLANT TECH QC OPERATION / INSPECTION REMARKS
MAINTENANCE
PROCESS TEAM

Approved Drawings, Visual check


21 Install appropriate steel tags on all instruments. RFI & Checklist Scope of work H M W H
satisfactory

Install all required accessories for installation


including Instrument mounting stanchions,
impulse tubes and connections for process hook- Approved Drawings, Visual check
22 RFI & Checklist Scope of work H M W H
ups and conduit connections with associated satisfactory
accessories as mentioned in the instrument
installation detail drawings.

Approved Drawings, Visual check


23 Instrument tubing RFI & Checklist Scope of work H M W H
satisfactory

Conduct a pressure test for all new and Approved Drawings, Visual check
24 RFI & Checklist Scope of work H M W H
modified instrument tubing/ piping satisfactory

PRE-COMMISSIONING

Function Test / Loop Check of Temperature Method statement / Project


25 Approved Drawing / P&ID. Test Package. H W W NA
Transmitter Specifications

Function Test / Loop Check of Pressure Method statement / Project


26 Approved Drawing / P&ID. Test Package. H W W NA
Transmitter Specifications

Method statement / Project


27 Stroke check / Function Test for Control Valve Approved Drawing / P&ID. Test Package. H W W NA
Specifications

Page 3 821659066.xlsx
A=Approval, H=Hold Pont, I=Information, M=Monitor, R=Document Review, S=Surveillance, W=Witness, Indicates revision

VERIFYING DOCUMENTS INSPECTION ACTIVITIES BY


EXAMINATION & INSPECTION TECHNICAL DOCUMENTS
Sl#
ACTIVITIES (if applicable)
SIPCHEM SIPCHEM
SIPCHEM
ACCEPTANCE CRITERIA RECORD / REFERENCE PLANT TECH QC OPERATION / INSPECTION REMARKS
MAINTENANCE
PROCESS TEAM

Method statement / Project


28 Function Test of On-Off Valve Approved Drawing / P&ID. Test Package. H W W NA
Specifications

Method statement / Project


29 Function Test of Flow meter Coriolis Approved Drawing / P&ID. Test Package. H W W NA
Specifications

Compiling of QA/QC records & ALL INSPECTION REPORTS / SCOPE OF WORK.ALL


30 Inspection reports H NA NA H
ITP close out CHECKLIST INSPECTION DOCUMENTS

Remarks: