CONCRETE BUILDING COMPUTATION
FIRST FLOOR
Concrete Slab
Slab Area 1 (Whole)
Slab Area 2 (to be deducted)
Total Area (including columns and walls)
Total length of interior walls 0
Width Length Area
Column
Exterior Walls (Y)
Exterior Walls (X)
Interior Walls
Total Area of columns and walls
Total Area without columns and walls 0 - 0 0
Volume of Floor Slab 0 x
Due to Comfort Room 0 -
Total volume of concrete 0
Plus 10% Allowance for Wastage 0
Total Estimated Concrete Volume (C/V) 0
For Class C Concrete Mix of C/V
0 x 5.49 0 bags
0 x 0.44 0 cubic meter of sand
0 x 0.89 0 cubic meter of gravel
Column Footing
Volume of Column Footing 1
Volume of "" Column Footing 1
Total volume of concrete 0
Plus 10% Allowance for Wastage 0
Total Estimated Concrete Volume (C/V) 0
For Class A Concrete Mix of C/V
0 x 7.85 0 bags
0 x 0.42 0 cubic meter of sand
0 x 0.84 0 cubic meter of gravel
Column
Length of Column 1
Volume of Column 1
Volume of "" Column
Total volume of concrete 0
Plus 5% Allowance for Wastage 0
Total Estimated Concrete Volume (C/V) 0
For Class C Concrete Mix of C/V
0 x 5.49 0 bags
0 x 0.44 0 cubic meter of sand
0 x 0.89 0 cubic meter of gravel