Bill of Quantities for Finishing Work

Uploaded by

Ephrem Hailu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views27 pages

Bill of Quantities for Finishing Work

Uploaded by

Ephrem Hailu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

MEKDES ANDARGE

BILL OF QUANTITY AND SPECIFICATION FOR FINISHING PART


RECIDENCIAL BUILDING
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
A. SUB & SUPER STRUCTURE FINISHING
5 METAL WORK
Glazed metal windows and door fabricated from
LTZ steel tubular black steel profile including all
necessary iron mongery, cylindrical lock for
doors and pointed with one coat printer two coats
of synthetic enamel paint (galvanizing m/s)
465birr/msq
Window
5.1 size 180cm *110cm M2 1.98 4,500.00 8,910.00
5.2 size 180cm *95cm M2 1.71 4,500.00 7,695.00
Door
5.3 size 280cm *180cm M2 5.04 4,500.00 22,680.00
5.4 size 280cm *90cm M2 2.52 4,500.00 11,340.00
Wooden Door
5.5 size 280cm *105cm NO 1 19,800.0 19,800.00
5.6 size 280cm *100cm N 1 18,800.0 O
18,800.00
Total Carried to Summary Birr …………………………………….. 89,225.00
6 FINISHING
Apply two coats of plaster in cement mortar
To external HCB wall, concrete beam and
6.1 column surface
M2 69.75 379.81 26,491.75
6.2 To internal wall surface, ditto M2 109.96 296.84 32,640.53
6.3 Gypsum wall chucking M2 105.16 95.00 9,990.20
6.4 Gypsum ceiling work M2 28.48 650.00 18,512.00
Total Carried to Summary Birr …………………………………….. 87,634.47
7 Paving and Flooring
1.5cm thick ceramic tile flooring bedded on
7.1 and including 3cm thick cement sand screed
and jointed in cement mortar mix 1:3 M2 28.48 3,144.97 89,568.75
7.2 Terrazzo tile skirting, ditto M 28.4 238.47 6,772.55
7.3 Ceramic wall tile applied to plastered wall on M2 4.8 2,360.49 11,330.35
and including cement sand mortar bedding
and white cement grout
terrazo slab window sill bedded in cement
mortar and joints pointed in cement mortar

7.4 30mm thick & 280 width marbile window sill M 2.05 1,739.82 3,566.63
Total Carried to Summary Birr …………………………………….. 111,238.28
8 GLAZING
Supply and fix putted clear glass glazed to
8.1 metal beads & putty

4mm thick M2 11.25 1,628.73 18,323.21


Total Carried to Summary Birr …………………………………….. 18,323.21
9 PAINTING
Prepare and apply three coats of plastic emulssion paint
9.1 To external quartz wall surface M2 69.75 331.91 23,150.72
9.2 To internal plastered wall surface M 2
109.96 86.54 9,515.94
9.3 To plastered ceiling surface M2 28.48 94.60 2,694.21
9.4 painting roof material M2 38.3 82.24 3,149.79
Total Carried to Summary Birr …………………………………….. 38,510.66
10 Sanitary Installation
I. Internal Installation
NOTE Supply and install galvanized
iron pipes for cold and hot water
Ǿ 15 mm
10.1 distribution to all sanitary fixtures Ml 2.5 150.00 375.00
10.2 according
Ǿ 20 to
mm where shown on the Ml 5.25 190.00 997.50
Supply and fix gate valves of
10.3 approved standard complete with
Ǿ 15 mm No. 2 65.00 130.00
unions, elastic water proofing and
Φ 20 mm
10.4 hand wheels of normal quality No. 3 95.00 285.00
Supply and fix hand wash basin
made of white vitreous china
10.5 equipped with concealed bracket
mad of grey malleable cast iron
white painted compete with plug. No. ###
1 6,273.15
Chains and traps. Size 500x450
Supply and fix wash down water
closet made of white vitreous china
with plastic seat and cover including
10.6 low flush cistern and stop cock on
the water supply line complete with
all accessories. Supply and fix toilet
paper holder with metal roller
No. 1 ### 2,586.19
150x150x25mm complete with
supply and fix pressed steel
10.7
enameled cast iron shower tray no 1 ### 2,849.15
including
supply andshower head
water heater complete
10.8
with insulation one way and saftey no 2 ### 7,300.00
valve
Supply and fix crystal glass mirror
10.9 where appropriate including chrome
plated brass mirrors, clips and M2 2 ### 3,000.00
screws. Size 50x1.2
Supply and install soil, waste and
vent pipe in horizontal branches and
vertical stacks made of rigid plastic
pipes (PVC) of approved standard
including the necessary fittings such
as bends, Y,T clean outs, increasing
and reducing pipes with tight joints
as shown on the drawing. All -
### Φ 50 mm
Ml 3.80 95.00 361.00
### Φ 110mm Ml 1.3 125.00 162.50
Supply and fix floor drains made of
###
enameled cast iron with smell trap No. 2 462.84 925.68
### complete
tank 2000 with
liter all the accessories. No. 1 ### 12,000.00
Dia 50mm.
### kitchen sink No. 1 ### 2,584.00
Supply and fix vent caps made of
### rigid PVC to be connected to the roof
terminal of vent pipe.Dia 50mm No. 2 150.00 300.00
Total ……………………… 40,129.17

II. External installation (site


work)
Supply and lay galvanized iron water
distribution pipes according to the
### drawing shown complete with
fittings and accessories. Unit price
shall include excavation of the Ml 14.7 150.00 2,205.00
trench to a depth of 500mm for
construction man hole

construct man hole with precast


### concrete pile diameter 50cm with a
depth of 50cm with base slab of 7cm no 2 ### 11,000.00
thick removeable R.C
### Septic tanck diam 300cm & 280cm no 1 ### 81,650.20
depthe
Supply and lay rigid sewage pipe
(PVC) of approved standard
including the necessary fittings such
as bends, Y,T with a slope as
indicated on the drawing with a firm -
bed of sand 100mm above and
### Φ 150 mm Ml 7.2 195.00 1,404.00
Construct pre cast concrete circular
manholes on sanitary sewers on a
base of mass concrete 150mm thick
### mass concrete with proper slope for
smooth flow. The manholes shall be
covered with 80mm thick R.C slab.
No. 2 ### 11,000.00
Total ………………………
107,259.20
Total Carried to Summary Birr …………………………………….. 147,388.37
11 Electrical installation
Supply and fix flush mounted mean
distribution boards MDB1-MDB-4
with earthing leads, connectors and
all otherofnecessary
1 piece MDB 16A/1phaccessories
11.1 No. 1 ### 7,000.00
lower voltage earthing system with
1*10mm2 copper conduct inside pvc
11.2 conduit of 16mm diameter and
2400*16mm copper earthing rod
feeder pvc sheathed pvc insulated
power cable
4*6 sq. mm from EEPCO up to KWH ml 12.5 72.00 900.00
4*6 sq. mm from KWH up toMDB ml 16.45 50.00 822.50
11.3 wire -
2.5 wire ml 1 ### 2,800.00
1.5 wire ml 1 ### 1,250.00
switch sytem
single switch point no 2 50 100.00
double switch point no 4 80.00 320.00
Light points fed through PVC
11.4 insulated conductor of 2x2.5mm in
2

thermoplastic conduit of diameter


No. 4 350.00 1,400.00
13/16mm for necessary installation
11.5 condut No. 60 15.00 900.00
Total Carried to Summary Birr …………………………………….. 15,492.50
Total (B)………………………………………………………
507,812.49

SPECIFICATION AND BILL OF QUANTITY


PROJECT: RESIDENCIAL BULIDING OF SERVICE
LOCATION:SULULT
OWNER: MEKDES ANDARGE
5 METAL WORK 89,225.00
6 FINISHING WORK 87,634.47
7 PAVING & FLOORING 111,238.28
8 GLAZING 18,323.21
9 PAINTING 38,510.66
10 SANITARY INSTALLATION 147,388.37
11 ELECTRICAL INSTALLATION 15,492.50
GRAND TOTAL 507,812.49
PREPARED BY MILKESSA GIRMA
ITEM DESCRIPTION UNIT QTY QTY RATE
A. SUB STRUCTURE
1 EXCAVATION & EARTH WORK
1.1 Clear of site to remove top soil to a depth of 20cm
thick starting from natural ground level
M2 167.81 167.81 3.00
1.2 Bulk excavation to a depth not exceeding 50cm. M3 250 250 15.00
1.2 Excavation for isolated footing in ordinary soil to
a depth not exceeding 250cm starting from M3 135 135 15.00
reduced level
1.3 Trench foundation excavation in ordinary soil Ditto M3 86 86 15.00
1.4 Backfill around foundation with good dry fill
material from site and well ram in layers not
exceeding 20cm thick M3 157.17 157.17 15.00
1.5 Fill under hardcore with selected borrowed
material from site and well ram in layers
M3 47 47 15.00
1.6 Cart away surplus excavation material to an appropri
M3 305 305 30.00
1.7 25cm thick basaltic or equivalent stone hard core
well rolled consolidated and blinded with crushed
stones M2 140 140 30.00
Total Carried to summary Birr ………………………………………………………

2 CONCRETE WORK
2.1 5cm thick lean concrete class C-5, with minimum
comment content of 150kg/m3 under footing,
masonry foundation wall and under slab
M2 63.27 63.27 21.00
2.2 10cm thick reinforced concrete ground floor slab
in C-15 with minimum cement content of 280
kg/m3 well spread and leveled M2 140 140 85.00
Reinforced concrete class C-25, with minimum
cement content of 360kg/m3 filled into form work
and vibrated around rod reinforcement. Steel and
form work measured separately.
2.3 In footings M3 20.45 20.45 700.00
2.4 In foundation column M3 3.82 3.82 700.00
2.5 In grade beam, including entrance steps M3 6.15 6.15 700.00
Provide cut and fix in position sawn zigba wood form work
2.6 To footing M2 42.56 42.56 40.00
2.7 To foundation column M2 53.76 53.76 40.00
2.8 To grade beam M 2
73.76 73.76 40.00
2.9 To steps M2 5 5 40.00
ITEM DESCRIPTION UNIT QTY QTY RATE
Reinforcement steel bars according to structural
drawings. Price includes cutting, bending, placing
in position & trying wires.

2.11 Diameter 8mm deformed bars kg 356 356 11.50


2.11 Diameter 14mm deformed bars kg 345 345 11.50
2.12 Diameter 20mm deformed bars kg 987 987 11.50
2.13 10/2cm Chip wood expansion joint painted with
two coats of asphalt between slab and grade beam m 182 182 45.00
Total Carried to summary Birr ………………………………………………………
3 MASONRY WORK
3.1 50cm thick hard trachytic or equivalent stone
masonry foundation wall bedded in cement mortar M3 36 36 220.00
mix 1:3
3.2 50cm thick hard trachytic or equivalent stone
masonry wall bedded in cement 1:3, above NGL
externally left for dressing M3 18 18 250.00
Total Carried to summary Birr ………………………………………………………

Total (A)………………………………………………………
B. SUPER STRUCTURE
1 CONCRETE WORK
Reinforced concrete class C-25, with minimum
cement content of 360kg/m3 filled into form work
and vibrated around rod reinforcement.

1.1 In elevation column M3 17.4 23.2 700.00


1.2 In suspende beams M3 20.453 27.27 700.00
1.3 In top tie beam M3 4.0125 5.35 700.00
1.4 In stair case M3 3.6825 4.91 700.00
1.5 In 15cm thick suspended slab M3 12.03 16.04 700.00
Provide cut and fix in position sawn zigba wood form work
1.6 To elevation column M2 93.75 125 40.00
1.7 To beams M2 148.69 198.25 40.00
1.8 To top tie beam M 2
36.51 48.68 40.00
1.9 To stair case M2 34.02 45.36 40.00
1.10 In suspended slab M2 299.36 399.15 40.00
Reinforcement steel bars according to structural
drawings. Price includes cutting, bending, placing
in position & tying wires
1.11 Diameter 20mm deformed bars kg 2092 2789 11.50
ITEM DESCRIPTION UNIT QTY QTY RATE
1.11 Diameter 16mm deformed bars kg 1009 1345 11.50
1.12 Diameter 14mm deformed bars kg 657 876 11.50
1.13 Diameter 12mm deformed bars kg 432.75 577 11.00
1.14 Diameter 10mm deformed bars kg 326.25 435 11.00
1.15 Diameter 8mm deformed bars kg 486 648 11.00
Total Carried to Summary Birr ……………………………………..

2 MASONRY & BLOCK WORK


Hollow concrete block wall bedded in cement
mortar both sides left for plaster
2.1 20cm thick M2 397.5 530 80.00
2.2 15cm thick M2 56.25 75 70.00
2.3 10cm thick M 2
12 16 70.00
Total Carried to Summary Birr ……………………………………..

3 ROOFING
3.1 G-28 glavanized corrugated steel sheet roof cover
including root ridge, tixed to zigba purlin, (Roof
cover measures horizontal projection and purlin
measured separately M2 167.81 167.81 80.00
3.2 G-28 galvanized plain steel sheet flusing fixed as
shown, development 40cm M 56 56 60.00
3.3 Diam. 110mm down pipe M 70 70 40.00
Total Carried to Summary Birr ……………………………………..
4 CARPENTRY & JOINERY
All structural timber member shall be well
seasoned and free of harm full defects and painted
with two coats of anti terminate solution. Each
truss shall be firmly fixed with dia. 6mm plain bar
to concrete beam
Eucalyptus Truss
4.1 Upper and lower, Size Diameter 10cm M 195.4 195.4 15.00
4.2 Vertical and diagonal member, Size Diameter 10cm M 145.6 145.6 15.00
4.3 Zigba purlin, Size 5/7cm M 194 194 20.00
4.4 8mm thick chip wood ceiling nailed on 4x4cm
zigba battens at c/c 60cm both ways price includes M2 167.81 167.81 60.00
corner list
Total Carried to Summary Birr ……………………………………..

5 METAL WORK
ITEM DESCRIPTION UNIT QTY QTY RATE
Glazed metal windows and door fabricated from
LTZ steel tubular black steel profile including all
necessary iron mongery, cylindrical lock for doors
and pointed with one coat printer two coats of
synthetic enamel paint (galvanizing m/s)

Window
5.1 Size 305/180cm NO 18 24 ###
5.2 Size 305/70cm NO 12 16 768.60
5.3 Size 370/40cm NO 3 4 16.41
Door
5.4 Size 210/80cm NO 9 12 604.80
5.4 Size 210/70cm NO 6 8 529.20
Total Carried to Summary Birr ……………………………………..
6 FINISHING
Apply two coats of plaster in cement mortar
6.1 To external HCB wall, concrete beam and column s M2 671 894.65 25.00
6.2 To internal wall surface, ditto M2 671 894.65 25.00
6.3 To concrete ceiling and belly of staircase M2 110.25 147 25.00
6.4 Apply final coats of fine cement plaster to all M2 793.26 1057.7 10.00
6.6 plastered
2cm thicksurface
Terazzo tile flooring bedded on and
including 3cm thick cement sand screed and
jointed in cement mortar mix 1:3 M2 420 560 80.00
6.7 1.5cm thick non slippery ceramic floor tile bedded
on and including 3.5cm thick cement Sand screed
and jointed in cement mortar 1:3 M2 12 16 200.00
6.8 10/2cm terazzo tile skirting stuck to wall on and
including cement mortar backing M 264 352 30.00
6.9 Ceramic tile skirting, ditto M 9.375 12.5 40.00
6.1 Ceramic wall tile applied to plastered wall on and
including cement sand mortar bedding and white M2 13.973 18.63 150.00
cement grout
Marble slab window cill bedded in cement mortar
and joints pointed in cement mortar
6.11 Size 27 x 3cm M 24.375 32.5 162.00
Marble slab for staircase bedded and jointed in
cement mortar bedding
6.12 Thread size 30/3cm M 41.4 55.2 180.00
6.13 Riser size 15/2cm M 41.4 55.2 90.00
Total Carried to Summary Birr ……………………………………..
7 GLAZING
ITEM DESCRIPTION UNIT QTY QTY RATE
Supply and fix putted clear glass glazed to metal
beads & putty
7.1 4mm thick M2 278.88 371.84 95.00
Total Carried to Summary Birr ……………………………………..
8 PAINTING
Prepare and apply three coats of plastic emulssion paint
8.1 To external plastered wall surface M2 671 894.65 15.00
8.2 To internal plastered wall surface M2 671 894.65 15.00
8.3 To plastered ceiling surface M2 110.25 147 16.00
8.4 To chip wood ceiling M 2
793.26 1057.7 16.00
Total Carried to Summary Birr ……………………………………..
9 Sanitary Installation
I. Internal Installation
NOTE Supply and install galvanized iron
pipes for cold and hot water distribution
to all sanitary fixtures according to
where shown on the drawing complete
with the necessary connecting pipes
such as bends, unions, etc.. Unit price
shall include all the necessary
assistance to the installation works such
as chiseling of walls, beams, slabs,
floors, fixing pipes with metal straps to
beams, etc.. and closing them with
concrete or cement mortar to normal
conditions. The installation shall be
tested at a pressure of 10kg/cm2 at the
9.1 Ǿ 15 mm Ml 13.98 18.64 30.00
9.2 Ǿ 20 mm Ml 3 4.00 25.00
Supply and fix gate valves of approved
standard complete with unions, elastic
water proofing and hand wheels of
normal quality
9.3 Ǿ 15 mm No. 12 16.00 20.00
9.4 Φ 20 mm No. 6 8.00 40.00
Supply and fix hand was basin made of
white vitreous china equipped with
9.5 concealed bracket mad of grey
malleable cast iron white painted
compete with plug. Chains and traps.
Size 500x405 No. 12 16.00 275.00
ITEM DESCRIPTION UNIT QTY QTY RATE
Supply and fix wash down water closet
made of white vitreous china with
plastic seat and cover including low
9.6 flush cistern and stop cock on the water
supply line complete with all
accessories. Supply and fix toilet paper
holder with metal roller 150x150x25mm
complete with fastening screws. No. 6 8.00 450.00
Supply and fix crystal glass mirror
9.7 where appropriate including chrome
plated brass mirrors, clips and screws. No. 6 8.00 50.00
Size 500x400
Supply and install soil, waste and vent
pipe in horizontal branches and vertical
stacks made of rigid plastic pipes (PVC)
of approved standard including the
necessary fittings such as bends, Y,T
clean outs, increasing and reducing
pipes with tight joints as shown on the
drawing. All horizontal branch pipes
shall be laid in a slope of 2%. Unit price
shall include all the necessary masonry
assistance such as chiseling of walls,
slabs, beams, floors, etc. And closing
them with concrete or cement mortar.
9.10 Φ 50 mm Ml 13.725 18.30 36.00
9.11 Φ 110mm Ml 6 8.00 56.00
Supply and fix floor drains made of
9.12 enameled cast iron with smell trap
complete with all the accessories. Dia
No. 12 16.00 60.00
50mm.
Supply and fix vent caps made of rigid
9.13 PVC to be connected to the roof
terminal of vent pipe.Dia 50mm No. 1.5 2.00 30.00
Total ………………………
II. External installation (site work)
Supply and lay galvanized iron water
distribution pipes according to the
drawing shown complete with fittings
and accessories. Unit price shall include
excavation of the trench to a depth of
9.14 500mm for laying the pipes spread of
granular material 100mm under and
above the pipe and back filling. The
installation shall be tested at a pressure
of 10kg/cm2 before back filling. Ml 15 20.00 70.00
ITEM DESCRIPTION UNIT QTY QTY RATE
Supply and fix gate valves of approved
standard complete with unions, elastic
9.15 water proofing and hand wheels of
normal quality. Ø32mm No. 3 4.00 150.00
Supply and lay rigid sewage pipe (PVC)
of approved standard including the
necessary fittings such as bends, Y,T
with a slope as indicated on the drawing
with a firm bed of sand 100mm above
and under the pipe. Unit price shall
include excavation of trench, supply and
spread of granular material back filling
9.16 Φ 150 mm Ml 7.5 10.00 70.00
Construct pre cast concrete circular
manholes on sanitary sewers on a base
9.17 of mass concrete 150mm thick mass
concrete with proper slope for smooth
flow. The manholes shall be covered
with 80mm thick R.C slab. No. 2.25 3.00 200.00
Total ………………………
Total Carried to Summary Birr ……………………………………..
10 Electrical installation
Supply and fix flush mounted mean
distribution boards MDB1-MDB-4 with
earthing leads, connectors and all other
necessary accessories
10.1 1 piece of MDB 16A/1ph No. 3 4.00 500.00
Light points fed through PVC insulated
conductor of 2x2.5mm2 in thermoplastic
10.2 conduit of diameter 13/16mm for
necessary installation including junction
boxes with insulating caps as well as
flush mounted switches No. 114 ### 89.00
Flush mounted socket outlets of 16A/ph
fed through conductor of 3x2.5mm2 in
10.3 thermoplastic conduit of diameter of 13
mm including junction boxes with cover
No. 54 72.00 55.00
insulating caps etc.
Total Carried to Summary Birr ……………………………………..

Total (B)………………………………………………………

A+B……………….
AMOUNT AMOUNT

503.43 503.43
3,750.00 3,750.00

2,025.00 2,025.00
1,290.00 1,290.00

2,357.55 2,357.55

705.00 705.00

9,150.00 9,150.00

4,200.00 4,200.00

23,980.98 23,980.98

1,328.67 1,328.67

11,900.00 11,900.00

14,315.00 14,315.00
2,674.00 2,674.00
4,305.00 4,305.00
- -
1,702.40 1,702.40
2,150.40 2,150.40
2,950.40 2,950.40
200.00 200.00
AMOUNT AMOUNT

4,094.00 4,094.00
3,967.50 3,967.50
11,350.50 11,350.50

8,190.00 8,190.00
69,127.87 69,127.87

7,920.00 7,920.00

4,500.00 4,500.00

12,420.00 12,420.00

105,528.85 105,528.85

12,180.00 16,240.00
14,316.75 19,089.00
2,808.75 3,745.00
2,577.75 3,437.00
8,421.00 11,228.00

-
3,750.00 5,000.00
5,947.50 7,930.00
1,460.40 1,947.20
1,360.80 1,814.40
11,974.50 15,966.00

-
24,055.13 32,073.50
AMOUNT AMOUNT
11,600.63 15,467.50
7,555.50 10,074.00
4,760.25 6,347.00
3,588.75 4,785.00
5,346.00 7,128.00
121,703.70 162,271.60

31,800.00 42,400.00
3,937.50 5,250.00
840.00 1,120.00
36,577.50 48,770.00

13,424.80 13,424.80

3,360.00 3,360.00
2,800.00 2,800.00
19,584.80 19,584.80

2,931.00 2,931.00
2,184.00 2,184.00
3,880.00 3,880.00

10,068.60 10,068.60
19,063.60 19,063.60
AMOUNT AMOUNT

35,575.20 47,433.60
9,223.20 12,297.60
49.24 65.65

5,443.20 7,257.60
3,175.20 4,233.60
53,466.04 71,288.05

16,774.69 22,366.25
16,774.69 22,366.25
2,756.25 3,675.00
7,932.60 10,576.80

33,600.00 44,800.00

2,400.00 3,200.00

7,920.00 10,560.00
375.00 500.00

2,095.88 2,794.50

-
3,948.75 5,265.00

- -
7,452.00 9,936.00
3,726.00 4,968.00
105,755.85 141,007.80
AMOUNT AMOUNT

26,493.60 35,324.80

26,493.60 35,324.80

10,064.81 13,419.75
10,064.81 13,419.75
1,764.00 2,352.00
12,692.16 16,922.88
34,585.79 46,114.38

419.40 559.20
75.00 100.00

240.00 320.00
240.00 320.00

3,300.00 4,400.00
AMOUNT AMOUNT

2,700.00 3,600.00

300.00 400.00

-
494.10 658.80
336.00 448.00

720.00 960.00

45.00 60.00
8,869.50 11,826.00

1,050.00 1,400.00
AMOUNT AMOUNT

450.00 600.00

-
525.00 700.00

450.00 600.00
2,475.00 3,300.00
11,344.50 15,126.00

1,500.00 2,000.00

10,146.00 13,528.00

2,970.00 3,960.00
14,616.00 19,488.00

443,191.37 578,039.03

548,720.22 683,567.88
PROJECT

OWNER Prof. Redda Tekle

SUMMARY
A. Substructure
1 Excavation and earth work BIRR -
2 Concrete Work BIRR
3 Masonry work BIRR
TOTAL (A) BIRR

B. Superstructure
1 Concrete Work BIRR
2 Masonry & block work BIRR
3 Roofing BIRR
4 Carpentry and joinery BIRR
5 Metal work BIRR
6 Finishing BIRR
7 Glazing BIRR
8 Painting BIRR
9 Sanitary Installation BIRR
10 Electrical installation BIRR
TOTAL (B) BIRR
GRAND TOTAL (A+B) BIRR
#REF!