Material Handling and Site Clearance Rates

Uploaded by

Akshay Kamte
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views31 pages

Material Handling and Site Clearance Rates

Uploaded by

Akshay Kamte
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Summary of Rate Analysis

Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
CHAPTER-1
CARRIAGE OF MATERIALS
Loading and unloading of stone boulder / stone aggregates / sand / kanker / moorum. (Placing tipper at
1.1 loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and
return trip)
(i) Tipper-5.5 Cum cum 136.10 136.10 136.10
(ii) Tipper-10 Cum cum 119.00
(iii) Tipper-14 Cum cum 84.60
(iv) Tipper-18 Cum cum 85.40
1.2 Loading and Unloading of Boulders by Manual Means cum 394.50 394.50 394.50
1.3 Loading and Unloading of Cement or Steel by Manual Means and stacking. tonne 578.60 578.60 578.60
1.4 Cost of Haulage Excluding Loading and Unloading
(i) Surfaced Road
Tipper-5.5 Cum [Link] 11.50 11.50 11.50
Tipper-10 Cum [Link] 8.10 8.10
Tipper-14 Cum [Link] 6.50 6.50
Tipper-18 Cum [Link] 5.60 5.60
(ii) Unsurfaced Gravelled Road
Tipper-5.5 Cum [Link] 14.00 14.00 14.00
Tipper-10 Cum [Link] 9.90
Tipper-14 Cum [Link] 7.90
Tipper-18 Cum [Link] 6.80
(iii) Katcha Track and Track in river bed / nallah bed and choe bed.
Tipper-5.5 Cum [Link] 28.00 28.00 28.00
Tipper-10 Cum [Link] 19.70
Tipper-14 Cum [Link] 15.80
Tipper-18 Cum [Link] 13.70
(iv) Katcha Track in hilly area.. [Link] 57.50 57.50 57.50
(v) Transit Mixture [Link] 12.40 12.40 12.40
Hand Broken Stone Aggregates 63 mm nominal size (Supply of quarried stone, hand breaking into coarse
1.5 aggregate 63 mm nominal size (passing 80 mm and retained on 50 mm sieve) and stacking as directed) cum 2,376.50 2,376.50 2,376.50

Crushing of stone aggregates 10 mm nominal size. (Crushing of stone boulders of 150 mm size in an
1.6 integrated stone crushing unit of 250 tonnes per hour capacity comprising of primary and secondary crushing cum 1,638.20 1,638.20 1,638.20
units, belt conveyor and vibrating screens to obtain stone aggregates of different nominal size
Crushing of stone aggregates 20 mm nominal size (Crushing of stone boulders of 150 mm size in an
1.7 integrated stone crushing unit of 200 tonnes per hour capacity comprising of primary and secondary crushing cum 1,913.80 1,913.80 1,913.80
units, belt conveyor and vibrating screens to obtain stone aggregates of 20 mm nominal size.)
Crushing of stone aggregates 40 mm nominal size (Crushing of stone boulders of 150 mm size in an
1.8 integrated stone crushing unit of 200 tonnes per hour capacity comprising of primary and secondary crushing cum 1,758.10 1,758.10 1,758.10
units, belt conveyor and vibrating screens to obtain stone aggregates of 40 mm nominal size.)
Crushing of stone aggregates Dust (Crushing of stone boulders of 150 mm size in an integrated stone
1.9 crushing unit of 200 tonnes per hour capacity comprising of primary and secondary crushing units, belt cum 403.20 403.20 403.20
conveyor and
Crushing vibrating
of stone screensofto150
boulders obtain
mm stone aggregates
s ize in of .)stone crushing unit of 250 tonnes per hour
an integrated
1.10 capacity comprising of primary and secondary crushing units, belt conveyor and vibrating screens to obtain cum 538.00 538.00 538.00
crusher run (all in aggregate) for GSB.
CHAPTER-2
SITE CLEARANCE
Cutting of trees, excluding removal of stumps and roots of trees ( Cutting of trees, trunks and branches
2.1 (A) excluding removal of stumps and roots of trees and stacking of serviceable material with all lifts and up to a lead
of 1000 mtrs )
(i) Girth from 300 mm to 600 mm each 572.10 596.30 631.70
(ii) Girth from 600 mm to 900 mm each 623.70 655.60 752.40
(iii) Girth from 900 mm to 1800 mm each 1,053.90 1,090.30 1,180.80
(iv) Girth above 1800 mm each 1,664.20 1,734.30 1,889.20
Cutting of Trees, including Cutting of Trunks, Branches and Removal (Removal of stumps, roots, stacking
2.1 (B) of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit.)

2.01 (i) Girth from 300 mm to 600 mm each 336.90 340.40 366.60
2.02 (ii) Girth from 600 mm to 900 mm each 451.30 453.80 501.20
2.03 (iii) Girth from 900 mm to 1800 mm each 542.30 544.60 598.80
2.04 (iv) Girth above 1800 mm each 672.20 680.80 743.90
2.2 Clearing Grass and Removal of Rubbish hectare 38,460.60 39,166.90 39,873.20
Clearing and Grubbing Road Land . (Clearing and grubbing road land including uprooting rank vegetation,
grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and
2.3 disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of
1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.)

(i) By Manual Means:-


A In area of light jungle hectare 211,874.00 215,764.90 219,655.70
B In area of thorny jungle hectare 250,334.60 254,931.70 259,528.90
(ii) By Mechanical Meansby by Dozer
A In area of light jungle hectare 136,541.00 139,773.00 192,414.40
B In area of thorny jungle hectare 146,199.90 149,610.40 205,110.40
(iii) By Mechanical Means using by motor Grader
2.09 A In area of light jungle sqm 12.34 12.59 174.38
B In area of thorny jungle hectare 119,621.90 120,325.20 167,300.40
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other
structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding
2.4
wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the
serviceable material with all lifts and lead of 1000 metres)
(i) Lime /Cement Concrete
I By Manual Means
A Lime Concrete, cement concrete grade M-10 and below cum 804.00 818.70 833.50
B Cement Concrete Grade M-15 & M-20 cum 957.80 975.40 993.00
C Prestressed / Reinforced cement concrete grade M-20 & above cum 2,484.80 2,530.40 2,576.00
II By Mechanical Means for items No. 2.04( b) & ( c)
A Cement Concrete Grade M-15 & M-20 cum 691.60 705.00 757.10
B Prestressed / Reinforced cement concrete grade M-20 & above cum 1,114.90 1,136.10 1,196.00
(ii) Dismantling Brick / Tile work
A In lime mortar cum 470.00 478.60 487.20
B In cement mortar cum 623.80 635.30 646.70
C In mud mortar cum 405.00 412.50 420.00
D Dry brick pitching or brick soling cum 377.70 384.60 391.50
(iii) Dismantling Stone Masonry
A Rubble stone masonry in lime mortar cum 531.50 541.30 551.00
B Rubble stone masonry in cement mortar. cum 623.80 635.30 646.70
C Rubble Stone Masonry in mud mortar. cum 470.00 478.60 487.20
D Dry rubble masonry cum 439.20 447.30 455.30
E Dismantling stone pitching/ dry stone spalls. cum 408.40 415.90 423.40
Dismantling boulders laid in wire crates including opening of crates and stacking dismantled
F cum 470.00 478.60 487.20
materials.
II By Mechanical Means for items No. 2.04 (iii)
A Dismantling Brick / Tile work/ rubble masonary/ pitching/ etc by mechanical means cum 143.80 150.30 187.90
Wood work wrought framed and fixed in frames of trusses upto a height of 5 m above plinth level
(iv) cum 1,115.00 1,135.50 1,156.00
Steel work in all types of sections upto a height of 5 m above plinth level excluding cutting of rivet.
(v)
A Including dismembering tonne 2,908.60 2,962.40 3,016.30
B Excluding dismembering. tonne 2,187.90 2,228.40 2,268.90
C Extra over item No( V ) A and( V ) B for cutting rivets. tonne 20.80 21.10 21.50
(vi) Scraping of bricks dismantled from brick work including stacking.
In lime/Cement mortar 1000
A 2,669.80 2,719.20 2,768.60
numbers
In mud mortar 1000
B 953.50 971.10 988.80
numbers
(vii) Scraping of Stone from dismantled stone masonry
A In cement and lime mortar cum 1,071.10 1,091.00 1,110.80
B In Mud mortar cum 227.20 231.40 235.60
(viii) Scarping plaster in lime or cement mortar from brick/ stone masonry sqm 33.20 33.80 34.40
Removing all type of hume pipes and stacking within a lead of 1000 metres including earthwork and
(ix)
dismantling of masonry works.
A Up to 600 mm dia metre 806.40 899.20 980.40
46.30 B Above 600 mm to 900 mm dia metre 977.90 1,055.00 1,122.70
46.31 C Above 900 mm metre 1,149.40 1,210.90 1,407.20
Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials
2.5
up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately)
I By Manual Means
A Bituminous courses cum 1,274.70 1,298.30 1,321.90
B Granular courses cum 893.30 909.80 926.40
II By Mechanical Means
A Bituminous course cum 289.80 294.40 333.70
B Granular courses cum 42.50 45.90 57.90
Dismantling of Cement Concrete Pavement (Dismantling of cement concrete pavement by mechanical
means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at
2.6 cum 520.50 545.20 614.30
designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable
and unserviceable materials separately)
Dismantling Guard Rails (Dismantling guard rails by manual means and disposal of dismantled material with
2.7 all lifts and up to a lead of 1000 metres, stacking serviceable materials and unserviceable materials separately.) metre 119.20 121.50 123.70

Dismantling Kerb Stone (Dismantling kerb stone by manual means and disposal of dismantled material with
2.8 metre 22.80 23.20 23.70
all lifts and up to a lead of 1000 metre)
Dismantling Kerb Stone channel (Dismantling kerb stone channel by manual means and disposal of
2.9 metre 31.20 31.80 32.30
dismantled material with all lifts and up to a lead of 1000 metre)
Dismantling Kilometre Stone (Dismantling of kilometre stone including cutting of earth, foundation and
2.10
disposal of dismantled material with all lifts and lead upto 1000 m and back filling of pit.)
A 5th KM stone each 770.00 784.20 798.50
B Ordinary KM Stone each 459.70 468.20 476.70
C Hectometre Stone each 91.90 93.60 95.30
Dismantling of Fencing (Dismantling of barbed wire fencing/ wire mesh fencing including posts, foundation
concrete, back filling of pit by manual means including disposal of dismantled material with all lifts and up to a
2.11 metre 102.00 103.80 105.70
lead of 1000 metres, stacking serviceable material and unserviceable material separately. )
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
Dismantling of CI Water Pipe Line (Dismantling of CI water pipe line 600 mm dia including disposal with all
2.12 lifts and lead upto 1000 metres and stacking of serviceable material and unserviceable material separately metre 264.70 269.60 274.40
under supervision of concerned department)
Removal of Cement Concrete Pipe of Sewer Gutter (Removal of cement concrete pipe of sewer gutter 1500
mm dia under the supervision of concerned department including disposal with all lifts and up to a lead of 1000
2.13 metre 391.20 398.40 405.60
metres and stacking of serviceable and unserviceable material separately but excluding earth excavation and
dismantling of masonry works.)
Removal of Telephone / Electric Poles and Lines (Removal of telephone / Electric poles including
excavation and dismantling of foundation concrete and lines under the supervision of concerned department,
2.14 each 352.10 358.60 365.00
disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material
separately)
CHAPTER-3
EARTH WORK, EROSION CONTROL AND DRAINAGE
Excavation in Soil by Manual Means. (Excavation for roadway in soil using manual means including loading
3.1 in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres.) cum 418.70 426.30 434.00

Excavation in ordinary rock by manual means (Excavation in ordinary rock using manual means including
2.14 3.2 loading in a truck and carrying of excavated material to embankment site with in all lifts and leads upto 1000 cum 578.90 589.50 600.20
metres )
Excavation in Soil with Dozer with lead upto 1000 metres ( EExcavation for road way in soil by mechanical
means including cutting and transporting the earth to site of embankment/dumping area with lead upto 1000
2.11 3.3 cum 147.00 155.90 205.70
metres, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross
sections.)
Excavation in Ordinary Rock with Dozer with lead upto 1000 metres (Excavation for roadway in ordinary
rock by deploying a dozer, including cutting and transporting the earth to site of embankment/dumping area with
2.13 3.4 cum 223.80 239.80 307.50
lead upto 1000 metres, trimming bottom and side slopes in accordance with the requirements of lines, grades
and cross sections.)
Excavation in Hard Rock (requiring blasting) with disposal upto 1000 metres (Excavation for roadway in
hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in
3.5 cum 612.00 636.80 713.80
accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all
lifts and leads upto 1000 metres )
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. (Excavation
for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side
3.6 cum 66.40 76.40 88.20
slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the
embankment location within all lifts and lead upto 1000m)
Excavation in Ordinary Rock using Hydraulic Excavator and Tippers with disposal upto 1000 metres.
(Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming
3.7 cum 409.50 426.60 464.50
bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting
to the embankment location within all lifts and lead upto 1000m.)
Excavation in Hard Rock (blasting prohibited) (Excavation for roadwork in Hard Rock (blasting prohibited)
with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in
3.8
accordance with requirements of lines, grades and cross sections, and transporting to the embankment location
within all lifts and lead upto 1000 m.)
2.15 A Mechanised cum 538.00 561.40 620.80
B Manual Method cum 2,339.50 2,382.40 2,425.40
Excavation in Hard Rock (controlled blasting) with disposal upto 1000 metres (EExcavation for roadway
in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in
3.9 cum 637.20 648.90 743.40
accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all
lifts and leads upto 1000 metres )
Excavation in Marshy Soil (Excavation for roadwork in Marshy Soil with hydraulic excavator including cutting
and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and
3.10 cum 137.30 143.70 180.90
cross sections, and transporting to the embankment location within all lifts and lead upto 1000 m.)

Removal of Unserviceable Soil with Disposal upto 1000 metres (Removal of unserviceable soil including
2.11a 3.11 excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall cum 67.40 71.20 89.60
be paid separately as per clause 305..) (Removing Black Cotton Soil)
Pre-splitting of Rock Excavation Slopes (Carrying out excavation in hard rock to achieve a specified slope of
3.12 the rock face by controlled use of explosives and blasting accessories in properly aligned and spaced drill sqm 177.50 180.80 206.20
holes, collection of the excavated rock by a dozer, loading in tipper by a front end loader and disposing of the
material with all lifts and lead upto 1000 m, all as specified in clause No. 303)
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical
specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious
3.13
matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the
remaining earth locally for road work.)
(i) Ordinary soil
15.03 A Manual Means (Depth upto 3 m) cum 615.40 626.70 638.00
B Mechanical Means (Depth upto 3 m) cum 67.90 70.10 83.50
(ii) Ordinary rock (not requiring blasting)
A Manual Means (Depth upto 3 m) cum 762.80 776.90 791.00
B Mechanical Means cum 412.00 429.50 441.80
(iii) Hard rock ( requiring blasting )
A Mechanical Means cum 469.30 480.80 505.90
(iv) Hard rock ( blasting prohibited )
A Mechanical Means cum 714.80 747.80 826.00
(v) Marshy soil
A Manual means ( upto 3 m depth) cum 1,359.70 1,384.90 1,410.10
B Mechanical Means cum 673.20 691.60 756.80
3.14 Scarifying Existing Granular Surface to a Depth of 50 mm
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
Scarifying Existing Granular Surface to a Depth of 50 mm by Manual Means (Scarifying the existing
(i) granular road surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 sqm 51.20 52.20 53.10
metres. )
Scarifying existing bituminous surface to a depth of 50 mm by mechanical means ( using Hydraulic
(ii) excavator) (Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified sqm 4.20 4.50 5.60
material with in all lifts and lead upto 1000 metres.)
Scarifying existing bituminous surface to a depth of 50 mm by mechanical means (Using Motor Grader)
(iii) (Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all sqm 6.60 6.70 9.10
lifts and lead upto 1000 metres.)
3.15 Scarifying Existing bituminous surface to a depth of 50 mm
Scarifying existing bituminous surface to a depth of 50 mm by mechanical means Hydraulic excavator
(i) (Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all sqm 5.00 5.30 6.70
lifts and lead upto 1000 metres.)
Scarifying existing bituminous surface to a depth of 50 mm by mechanical means using Motor Grader
(ii) (Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all sqm 6.70 6.90 9.20
lifts and lead upto 1000 metres.)

Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with
2.28 3.16 approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to cum 524.10 537.90 577.60
required slope and compacting to meet requirement of table 300-2)
Construction of Embankment with Material Deposited from Roadway Cutting (Construction of
2.27 3.17 embankment with approved materials deposited at site from roadway cutting and excavation from drain and cum 67.90 68.90 79.90
foundation of other structures graded and compacted to meet requirement of table 300-2)
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with
2.28a 3.18 approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to cum 528.40 542.60 583.10
required slope and compacted to meet requirement of table No. 300-2)
Construction of Subgrade and Earthen Shoulders with Material Deposited from Roadway
Cutting (Construction of embankment with approved materials deposited at site from roadway cutting and
2.28b 3.19 cum 70.00 71.10 82.30
excavation from drain and foundation of other structures graded and compacted to meet requirement of table
300-2.)
20 Compacting Original Ground
Compacting original ground supporting subgrade (Loosening of the ground upto a level of500 mm below
Case-I the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for cum 101.40 102.20 117.40
subgrade construction.)
Case-II :Compacting original ground supporting embankment cum 112.30 113.20 132.70
Stripping and Storing Top Soil (Stripping, storing of top soil by road side at 15 m internal and re-application
3.21 on embankment slopes, cut slopes and other areas in localities where the available embankment material is not cum 89.60 90.40 116.40
conducive to plant growth)
Stripping, storing and re-laying top soil from borrow areas in agriculture fields. (Stripping of top soil from
borrow areas located in agriculture fields, storing at a suitable place, spreading and re-laying after taking the
3.22 cum 177.60 182.50 244.90
borrow earth to maintain fertility of the agricultural field, finishing it to the required levels and satisfaction of the
farmer.)
Turfing with Sods (Furnishing and laying of the live sods of perennial turf forming grass on embankment
3.23 slope, verges or other locations shown on the drawing or as directed by the engineer including preparation of sqm 62.80 64.10 66.10
ground, fetching of rods and watering)
Seeding and Mulching (Preparation of seed bed on previously laid top soil, furnishing and placing of seeds,
3.24 fertilizer, mulching material, applying bituminous emulsion at the rate of0.23 litres per sqm and laying and fixing sqm 196.40 201.20 210.40
jute netting, including watering for 3 months all as per clause 308)
Surface Drains in Soil (Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil
3.25 to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material
to be used in embankment within a lead of50 metres (average lead 25 metres))
2.18 A Mechanical means metre 53.20 56.40 57.40
B Manual Means metre 216.90 220.90 225.00
Surface Drains in Ordinary Rock (Construction of unlined surface drain of average cross sectional area 0.4
3.26 sqm in ordinary rock to specified lines, grades, levels and dimensions as per approved design and to the
requirement of clause 301 to 309. Excavated material to be used in embankment at site.)
2.20 A Mechanical Means metre 76.90 78.40 79.80
B Manual Means metre 310.60 316.40 322.10
Surface Drains in Hard Rock (Rate per metre may be worked out based on quantity of hard rock as per
3.27 metre
design.)
Sub Surface Drains with Perforated Pipe (Construction of subsurface drain with perforated pipe of 100 mm
internal diameter of metal/ asbestos cement/ cement concrete/PVC, closely jointed, perforations ranging from 3
2.22 3.28 mm to 6 mm depending upon size of material surrounding the pipe, with 150 mm bedding below the pipe and 487.20 496.20 505.30
300 mm cushion above the pipe, cross section of excavation 450 x 550 mm. Excavated material to be utilised in
roadway at site )
Aggregate Sub- Surface Drains (Construction of aggregate sub surface drain 300 mm x 450 mm with
3.29 metre 221.10 225.20 229.20
aggregates conforming to table 300-4, excavated material to be utilised in roadway )
Underground Drain at Edge of Pavement (Construction of an underground drain 1 m x 1 m (inside
3.30 metre 5,323.52 5,323.52 5,323.52
dimensions) lined with RCC-20 cm thick and covered with RCC slab10 cm in thickness on urban roads)
Preparation and Surface Treatment of formation. (Preparation and surface treatment of formation by
removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to
2.23 3.31 sqm 4.90 5.10 5.40
the required line, grade, profile and rolling with 8-10 tonne smooth wheeled roller, complete as per clause 310.)

Excavation in Hilly Areas in Hard Rock Requiring Blasting (Excavation in hilly areas in hard rock requiring
3.32 blasting, by mechanical means including trimming of slopes and disposal of cut material with all lifts and lead cum 125.10 135.90 168.30
upto 1000 metres.)
Work in Urban Roads (The cost of earth work in urban roads inhabited area will be comparatively higher due
3.33
to following reasons:)
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
Embankment Construction with Fly ash/Pond ash available from coal or lignite burning Thermal Plants
as waste material. (Construction of embankment with fly ash conforming to table 1 of IRC: SP: 58 obtained
3.34 from coal or lignite burning thermal power stations as waste material, spread and compacted in layer of 200mm cum 148.00 151.30 167.40
thickness each at OMC, all as specified in IRC: SP: 58 and as per approved plans.)

CHAPTER-4
SUB-BASES, BASES ( NON- BITUMINOUS) AND SHOULDERS
4.1 Granular Sub-base with Close Graded Material (Table:- 400-1)
Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a
A mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor
grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete
(i) for grading- I Material cum 2,104.97 2,142.43 2,295.66
3.02 (ii) for grading- II Material cum 2,131.90 2,170.82 2,231.49
(iii) for grading-III Material cum 2,115.96 2,153.63 2,307.06
(iv) for grading-IV Material cum 2,115.96 2,153.63 2,307.06
(v) for grading-V Material cum 2,104.97 2,142.43 2,295.66
(vi) for grading-VI Material cum 2,110.96 2,148.54 2,301.87
By Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in
uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC,
B and compacting with vibratory roller to achieve the desired density, complete as per clause 401)

(i) for grading- I Material cum 2,036.87 2,027.80 2,071.00


3.05 (ii) for grading- II Material cum 2,047.86 2,076.55 2,159.11
(iii) for grading-III Material cum 2,047.86 2,076.55 2,159.11
(iv) for grading-IV Material cum 2,047.86 2,076.55 2,159.11
(v) for grading-V Material cum 2,036.87 2,065.35 2,147.71
(vi) for grading-VI Material cum 1,981.46 2,071.46 2,153.93
Using Crusher Run Method (Construction of granular sub-base by providing close graded material, spreading
in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC,
C and compacting with vibratory roller to achieve the desired density, complete as per clause 401)

(i) for grading- I Material cum 2,011.79 2,051.04 2,134.35


(ii) for grading- II Material cum 2,011.79 2,051.04 2,134.35
(iii) for grading-III Material cum 2,011.79 2,051.04 2,134.35
(iv) for grading-IV Material cum 2,011.79 2,051.04 2,134.35
(v) for grading-V Material cum 2,011.79 2,051.04 2,134.35
(vi) for grading-VI Material cum 2,011.79 2,049.05 2,086.30
4.2 Lime Stabilisation for Improving Subgrade
A By Manual Means
Laying and spreading available soil in the subgrade on a prepared surface, pulverising, mixing the spread
soil in place with rotavator with 3 % slaked lime having minimum content of 70% of CaO, grading with
743.00 1,385.20 1,415.82 1,481.89
motor grader and compacting with the road roller at OMC to the desired density to form a layer of improved
sub grade)
B By Mechanical Means
Laying and spreading available soil in the sub-grade on a prepared surface, pulverising, mixing the spread
soil in place with Soil Stabilizer & Binder Spreader with 2 per cent slaked lime using Binder spreader
(i) Machine, having minimum content of 70 per cent of CaO, grading with motor grader and compacting with the cum 1,687.77 1,724.00 1,795.67
road roller at OMC to the desired density to form a layer of improved sub grade

Laying and spreading available soil in the sub-grade on a prepared surface, pulverising, mixing the spread
soil in place with Soil Stabilizer with 2 per cent slaked lime mannualy spreaded having minimum
(ii) cum 1,633.54 1,668.76 1,739.43
content of 70 per cent of CaO, grading with motor grader and compacting with the road roller at OMC to the
desired density to form a layer of improved sub grade
4.3 Cement Stabilisation for Improving Subgrade
A By Manual Means
Laying and spreading available soil in the sub-grade on a prepared surface, pulverising, mixing the spread
soil in place with Soil Stabilizer & Binder Spreader with 2 per cent cement using Binder spreader cum 886.24 907.62 964.45
Machine, grading with motor grader and compacting with the road roller at OMC to the desired density to form
a layer of improved sub grade
B By Mechanical Means
Laying and spreading available soil in the sub-grade on a prepared surface, pulverising, mixing the spread
soil in place with Soil Stabilizer & Binder Spreader with 2 per cent cement using Binder spreader
(i) cum 1,188.81 1,215.80 1,278.23
Machine, grading with motor grader and compacting with the road roller at OMC to the desired density to form
a layer of improved sub grade
Laying and spreading available soil in the sub-grade on a prepared surface, pulverising, mixing the spread
soil in place with Soil Stabilizer with 2 per cent cement mannualy spreaded , grading with motor grader
(ii) cum 1,134.58 1,160.56 1,221.99
and compacting with the road roller at OMC to the desired density to form a layer of improved sub grade

4.4 Cement Stabilisation for Improving Embankment


A By Manual Means
Laying and spreading available soil in the emabankment on a prepared surface, pulverising, mixing the
spread soil in place with rotavator with 3 % slaked lime having minimum content of 70% of CaO, grading
cum 1,261.43 1,289.05 1,350.91
with motor grader and compacting with the road roller at OMC to the desired density to form a layer of
improved sub grade)
B By Mechanical Means
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
Laying and spreading available soil in the emabankment on a prepared surface, pulverising, mixing the
spread soil in place with Soil Stabilizer & Binder Spreader with 2 per cent slaked lime using Binder
(i) spreader Machine, having minimum content of 70 per cent of CaO, grading with motor grader and cum 1,561.44 1,594.61 1,662.03
compacting with the road roller at OMC to the desired density to form a layer of improved sub grade

Laying and spreading available soil in the emabankment n a prepared surface, pulverising, mixing the
spread soil in place with Soil Stabilizer with 2 per cent slaked lime mannualy spreaded having minimum
(ii) cum 1,507.21 1,539.38 1,605.79
content of 70 per cent of CaO, grading with motor grader and compacting with the road roller at OMC to the
desired density to form a layer of improved sub grade
Laying and spreading available soil in the emabankment n a prepared surface, pulverising, mixing the
spread soil in place with Soil Stabilizer & Binder Spreader with 2 per cent cement using Binder spreader
(iii) cum 1,561.44 1,594.61 1,662.03
Machine, grading with motor grader and compacting with the road roller at OMC to the desired density to form
a layer of improved sub grade
Laying and spreading available soil in the emabankment on a prepared surface, pulverising, mixing the
spread soil in place with Soil Stabilizer with 2 per cent cement mannualy spreaded, grading with motor
(iv) cum 1,507.21 1,539.38 1,605.79
grader and compacting with the road roller at OMC to the desired density to form a layer of improved sub
grade
Lime Treated Soil for Sub- Base (Providing, laying and spreading soil on a prepared sub grade, pulverising,
mixing the spread soil in place with rotavator with 3 % slaked lime with minimum content of 70% of CaO,
4.5 cum 1,794.97 1,833.97 1,923.44
grading with motor grader and compacting with the road roller at OMC to achieve at least 98%of the max dry
density to form a layer of sub base.)
Cement Treated Soil Sub Base/ Base (Providing, laying and spreading soil on a prepared sub grade,
pulverising, adding the designed quantity of cement to the spread soil, mixing in place with rotavator, grading
4.6 cum 1,165.06 1,191.60 1,265.52
with the motor grader and compacting with the road roller at OMC to achieve the desired unconfined
compressive strength and to form a layer of sub-base/base.)
Cement Treated Crushed Rock or combination as per clause 403 and table 400.4 in Sub base/ Base
(Providing, laying and spreading Material on a prepared sub grade, adding the designed quantity of cement to
4.7
the spread Material, mixing in place with rotavator, grading with the motor grader and compacting with the road
roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base.)
(i) For Sub-Base course cum 2,458.07 2,503.54 2,566.97
(ii) For Base course cum 2,417.20 2,461.91 2,524.59
Cement Treated Crushed Stone Sub base (Construction of granular sub-base by providing graded Material,
mixing with cement in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in
4.8 uniform layers with Mechanical Paver on prepared surface and compacting with vibratory power roller to
achieve the desired density, complete as per clause 401 )
A Plant Mix Method (Using by Mechanical Paver)
(i) Cement Treated Crushed Stone Sub base (Grading-III Material) cum 2,572.78 2,621.71 2,746.33
(ii) Cement Treated Crushed Stone Sub base (Grading-IV Material) cum 2,572.78 2,621.71 2,746.33
B By Mix in Place Method ((Using by Soil Stabilizer)
(i) Cement Treated Crushed Stone Sub base (Grading-III Material) cum 2,812.95 2,856.54 2,956.83
(ii) Cement Treated Crushed Stone Sub base (Grading-IV Material) cum 2,812.95 2,856.54 2,956.83
Making 50 mm x 50 mm Furrows (Making 50 mm x 50 mm furrows, 25mm deep, 450 to the center line of the
4.9 road and at one metre interval in the existing thin bituminous wearing coarse including sweeping and disposal sqm 16.02 16.32 16.61
of excavated material within 1000 metres lead)
Inverted Choke (Construction of inverted choke by providing, laying, spreading and compacting screening B
4.10 type/ coarse sand of specified grade in uniform layer on a prepared surface with motor grader and compacting cum 7,384.47 7,518.49 7,693.74
with power roller etc)
Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to
water bound macadam specification including spreading in uniform thickness, hand packing, rolling with
4.11
vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of
screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the
A By Manual Means
(i) Grading- I (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum 2,729.58 2,781.95 2,841.38
(b) Using Screening Type-A (13.2mm Agg.) cum 2,471.04 2,516.80 2,562.56
(ii) Grading- II (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum 2,578.37 2,627.93 2,684.56
(b) Using Screening Type-A (13.2mm Agg.) cum 2,468.52 2,516.06 2,570.65
3.19 (c) Using Screening Type-B (11.2mm Agg.) cum 2,688.34 2,739.95 2,798.61
(iii) Grading- III (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum 2,634.44 2,685.04 2,742.71
(b) Using Screening Type-B (11.2mm Agg.) cum 2,414.62 2,461.15 2,514.75
B By Mechanical Means:
(i) Grading- I (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum 2,473.74 2,539.20 2,663.54
(b) Using Screening Type-A (13.2mm Agg.) cum 2,095.97 2,126.84 2,216.58
(ii) Grading- II (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum 2,101.60 2,134.45 2,226.18
(b) Using Screening Type-A (13.2mm Agg.) cum 2,093.46 2,125.00 2,213.98
3.20 (c) Using Screening Type-B (11.2mm Agg.) cum 2,313.28 2,348.17 2,441.94
(iii) Grading- III (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum 2,259.37 2,293.27 2,386.04
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
(b) Using Screening Type-B (11.2mm Agg.) cum 2,039.55 2,069.38 2,158.07
Crushed Cement Concrete Sub-base / Base (Breaking and crushing of material obtained by breaking
damaged cement concrete slabs to size range not exceeding 75 mm as specified in table 400.9 transporting the
4.12 cum 399.34 408.93 463.34
aggregates obtained from breaking of cement concrete slabs at a lead of L km., laying and compacting the
same as sub base/ base course, constructed as WBM to clause 404 except the use of screening or binding
Penetration Coat Over Top Layer of Crushed Cement Concrete Base (Spraying of bitumen over cleaned
dry surface of crushed cement concrete base at the rate of 25 kg per 10 sqm by a bitumen pressure distributor,
4.13 sqm 27.44 27.95 28.45
spreading of key aggregates at the rate of 0.13 cum per 10 sqm by a mechanical gritter and rolling the surface
as per clause 506.3.8)
4.14 Wet Mix Macadam laying
Wet Mix Macadam laying Using Mechanical Paver ( Providing, laying, spreading and compacting graded
stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in
A cum 2,189.21 2,240.92 2,351.76
mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub-
base / base course on well prepared surface and compacting with vibratory roller to achieve the desired
Wet Mix Macadam laying using by Grader (Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical
3.23 B cum 2,192.74 2,226.07 2,354.12
mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base
course on well prepared surface and compacting with vibratory roller to achieve the desired density.)
Cement Treated Crushed Stone Base (Plant Mix Method) (Providing, laying, spreading and compacting
graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC
4.15 cum 2,943.62 2,986.97 3,099.60
in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub-
base / base course on well prepared surface and compacting with vibratory roller to achieve the desired
Construction of Median and Island with Soil Taken from Roadway Cutting (Construction of Median and
4.16 Island above road level with approved material deposited at site from roadway cutting and excavation for drain cum 248.55 253.19 257.95
and foundation of other structures, spread, graded and compacted as per clause 407)
Construction of Median and Island with Soil Taken from Borrow Areas (Construction of median and Island
4.17 cum 586.07 601.09 631.85
above road level with approved material brought from borrow pits, spread, sloped and compacted as per clause
4.18 Construction of Shoulders (A. Earthen Shoulders)
Footpaths and Separators (Construction of footpath/separator by providing a 150 mm compacted granular
7.29 4.19 sub base as per clause 401 and 25 mm thick cement concrete grade M15, over laid with precast concrete tiles sqm 1,197.08 1,269.05 1,291.15
in cement mortar 1:3 including provision of all drainage arrangements but excluding kerb channel..)
Crusher Run Macadam Base (Providing crushed stone aggregate, depositing on a prepared surface by
4.20 hauling vehicles, spreading and mixing with a motor grader, watering and compacting with a vibratory roller to
clause 417 to form a layer of sub-base/Base)
A By Mix in Place Method
(i) For 53 mm maximum size cum 2,034.99 2,063.37 2,145.32
(ii) For 45 mm maximum size cum 2,032.01 2,060.33 2,142.22
B By Mixing Plant :
(i) For 53 mm maximum size cum 2,016.36 2,047.82 2,167.76
(ii) For 45 mm maximum size cum 2,033.62 2,065.40 2,185.66
Lime, Fly ash stabalised soil sub-base (Construction of Sub-base using lime - fly ash admixture with
granular soil, free from organic matter/ deleterious material or clayey silts and low plasticity clays having PI
between 5 and 20 and liquid limit less than 25 and commercial dry lime, slaked at site or pre-slaked with CaO
4.21 content not less than 50%, fly ash to conform to gradation as per clause 4.3 of IRC: 88, lime + fly ash content cum 1,756.87 1,793.05 1,856.17
ranging between 10 to 30%, the minimum un-confined compressive strength and CBR value after 28 days
curing and 4 days soaking to be 7.5kg/sq, cm and 25% respectively, all as specified in IRC: 88 )

CHAPTER-5
BASES AND SURFACE COURSES (BITUMINOUS)
5.1 Prime coat
A Prime Coat over WMM/WBM
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including
3.29 (i) sqm 39.44 40.18 40.98
clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means
Providing and applying primer coat with cutback MC 30 bitumen emulsion on prepared surface of granular
(ii) Base including clearing of road surface and spraying primer at the rate of 0.60 to 0.90 kg/sqm using sqm 41.79 34.39 43.43
mechanical means.
B Prime Coat over Stabilized soil bases/Crusher Run Macadam
Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular
(i) Base including clearing of road surface and spraying primer at the rate of 0.90 to 1.20 kg/sqm using sqm 57.88 58.96 60.11
mechanical means.
Providing and applying primer coat with cutback MC 70 bitumen emulsion on prepared surface of granular
(ii) Base including clearing of road surface and spraying primer at the rate of 0.90 to 1.20 kg/sqm using sqm 57.88 58.96 60.11
mechanical means.
5.2 Tack coat
Tack Coat on Bituminous surfaces (Providing and applying tack coat with bitumen emulsion using emulsion
3.30 (i) pressure distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with sqm 14.61 14.87 15.14
mechanical broom.)
Tack Coat on Granular surfaces treated with primer ( Providing and applying tack coat with bitumen
3.34 (ii) emulsion using emulsion pressure distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared bituminous sqm 15.82 16.12 16.41
surface cleaned with mechanical broom.)
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
Tack Coat on Cement concrete pavement (Providing and applying tack coat with bitumen emulsion using
(iii) emulsion pressure distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared bituminous surface sqm 18.50 18.85 19.19
cleaned with mechanical broom.)
5.3 Bituminous Macadam
Bituminous Macadam -I ( 40 mm nominal size ) (Providing and laying bituminous macadam with higher
capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder,
3.40 (i) cum 7,045.29 7,186.02 7,386.50
transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and
alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction)
Bituminous Macadam -II ( 19 mm nominal size ) (Providing and laying bituminous macadam with higher
capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder,
(ii) cum 7,400.33 7,546.45 7,757.35
transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and
alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction)
5.4 Dense Graded Bituminous Macadam
Dense Graded Bituminous Macadam-I (Providing and laying dense graded bituminous macadam with higher
capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @
4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver
(i) cum 8,810.77 8,983.41 9,224.28
finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory
and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in
all respects)
Dense Graded Bituminous Macadam-II (Providing and laying dense graded bituminous macadam with higher
capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @
4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver
3.44 (ii) cum 9,531.14 9,715.79 9,968.94
finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory
and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in
all respects.)
5.5 Bituminous Concrete
Bituminous Concrete Grading -I (Providing and laying bituminous concrete with higher capacity batch type
hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.2 per cent
3.48 (i) of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control cum 10,716.06 10,930.39 11,219.75
to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve
the desired compaction as per MORTH specification clause No. 507 complete in all respects)
Bituminous Concrete Grading -II (Providing and laying bituminous concrete with higher capacity batch type
hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent
3.50 (ii) of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control cum 11,036.38 11,251.28 11,552.17
to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve
the desired compaction as per MORTH specification clause No. 507 complete in all respects)
Surface Dressing (Providing and laying surface dressing as wearing course in single coat using crushed
4.05 5.6 stone aggregates of specified size on a layer of bituminous binder laid on prepared surface and rolling with 8-10
tonne smooth wheeled steel roller)
Case -1 :-19 mm nominal chipping size sqm 97.98 99.60 101.63
Case - II 13 mm nominal size chipping sqm 77.85 79.10 80.62
Open - Graded Premix Surfacing (Providing, laying and rolling of open - graded premix surfacing of 20 mm
thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or
5.7 emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including sqm 146.95 149.88 154.13
mixing in a suitable plant HMP, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to
required level and grades.)
Close Graded Premix Surfacing/Mixed Seal Surfacing (Mechanical means using HMP of appropriate
capacity not less than 75 tonnes/hour. Providing, laying and rolling of close-graded premix surfacing
material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-a) or 13.2 mm to 0.09 mm (Type-b)
5.8
aggregates using penetration grade bitumen to the required line, grade and level to serve as wearing
course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a
Smooth wheeled roller 8-10 tonne capacity, and finishing to required level and grade. )
(i) Type A sqm 185.85 190.18 195.16
(ii) Type B sqm 169.45 173.48 178.15
Seal Coat (Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels,
5.9
grade and cross fall using Type A and B seal coats)
(i) Case - I : Type A sqm 73.90 75.07 76.50
Case - II : Type B (Providing and laying of premix sand seal coat with HMP of appropriate capacity not less
(ii) sqm 51.83 52.79 54.01
than 75 tonnes/ hours using crushed stone chipping 6.7 mm size and penetration bitumen of suitable grade.)
Supply of Stone Aggregates for Pavement Courses (Supply of stone aggregates from approved sources
confirming to the physical requirement, specified in the respective specified clauses, including royalties, fees
rents, collection, transportation, stacking and testing and measured in cum as per clause 520 Competitive
5.10 cum
market rates to be ascertained. Alternatively, rates for stone crushing given in chapter 1may be adopted, if
found economical. In case for supply of aggregates at site are not available, nearest crusher site may be
ascertained. Loading and un-loading charges and cost of carriage may be added to these rates to arrive at the
Mastic Asphalt (Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen
meeting the requirements given in table 500-39, prepared by using mastic cooker and laid to required level and
slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine-grained hard
14.55a 5.11 sqm 1,799.67 1,832.72 1,865.77
stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of
10 cm center to center in both directions, pressed into surface when the temperature of surfaces not less than
1000C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 516.)
Slurry Seal Providing and laying slurry seal consisting of a mixture of fine aggregates, portland cement filler,
5.12 bituminous emulsion and water on a road surface including cleaning of surface, mixing of slurry seal in a
suitable mobile plant, laying and compacting to provide even riding surface)
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
(i) 5 mm thickness sqm 82.00 83.48 85.19
(ii) 3 mm thickness sqm 57.40 58.42 59.62
(iii) 1.5 mm thickness sqm 35.51 36.12 36.87
Recycling of Bituminous Pavement with Central Recycling Plant (Recycling pavement by cold milling of
exiting bituminous layers, planning the surface after cold milling, reclaiming excavated material to the extent of
30 % of the required quantity, hauling and stock piling the reclaimed material near the central recycling plant
5.13 cum 7,737.34 7,848.10 8,028.99
after carrying out necessary checks and evaluation, adding fresh material including rejuvenators as required,
mixing in a hot mix plant, transporting and laying at site and compacting to the required grade, level and
thickness, all as specified in clause 519.)
5.14 Fog Spray sqm 41.32 42.09 42.85
added [Link] case it is decided by the engineer to blind the fog spray, the following may be added sqm 6.53 6.53 6.53
Bituminous Cold Mix ( Including Gravel Emulsion) (Providing, laying and rolling of bituminous cold mix on
5.15 prepared base consisting of a mixture of unheated mineral aggregate and emulsified or cutback bitumen,
including mixing in a plant of suitable type and capacity, transporting, laying, compacting and finishing to
(i) Using bitumen emulsion and 9.5 mm or 13.2 mm nominal size aggregate cum 13,489.67 13,751.26 14,088.41
(ii) Using bitumen emulsion and 19 mm or 26.5 mm nominal size aggregate cum 13,489.67 13,751.26 14,088.41
(iii) Using cutback bitumen and 9.5 mm or 13.2 mm nominal size aggregate cum 10,525.49 10,731.82 11,015.29
(iv) Using cutback bitumen and 19 mm or 26.5 mm nominal size aggregate cum 10,525.49 10,731.82 11,015.29
Sand Asphalt Base Course (Providing, laying and rolling sand-asphalt base course composed of sand,
5.16 mineral filler and bituminous binder on a prepared sub-grade or sub-base to the lines, levels, grades and cross cum 11,288.34 11,506.41 11,789.40
sections as per the drawings including mixing in a plant of suitable type and capacity, transporting, laying,
5.17 Crack Prevention Courses
Stress Absorbing Membrane (SAM) crack width less than 6 mm (Providing and laying of a stress
absorbing membrane over a cracked road surface, with crack width below 6 mm after cleaning with a
(i) mechanical broom, using modified binder complying with IRC:SP: 53, sprayed at the rate of 9 kg per 10 sqm sqm 81.04 82.55 84.05
and spreading 5.6 mm crushed stone aggregates @ 0.11 cum per 10 sqm with hydraulic chip spreader,
sweeping the surface for uniform spread of aggregates and surface finished to conform to clause 902..)
Stress Absorbing Membrane (SAM) with crack width 6 mm to 9 mm (Providing and laying of a stress
absorbing membrane over a cracked road surface, with crack width 6 to 9 mm after cleaning with a
(ii) mechanical broom, using modified binder complying with IRC:SP: 53,, sprayed at the rate of 11 kg per 10 sqm 95.32 97.09 98.85
sqm and spreading 11.2 mm crushed stone aggregates @ 0.12 cum per 10 sqm, sweeping the surface for
uniform spread of aggregates and surface finished to conform to clause 902.)
Stress Absorbing Membrane (SAM) crack width above 9 mm and cracked area above 50 % (Providing
and laying a single coat of a stress absorbing membrane over a cracked road surface, with crack width above
(iii) 9 mm and cracked area above 50 % after cleaning with a mechanical broom, using modified binder sqm 126.78 129.13 131.47
complying with IRC:SP: 53,, sprayed at the rate of 15 kg per 10 sqm and spreading 11.2 mm crushed stone
aggregates @ 0.12 cum per 10 sqm, sweeping the surface for uniform spread of aggregates and surface
Case - IV : Bitumen Impregnated Geotextile (Providing and laying a bitumen impregnated geotextile layer
(iv) after cleaning the road surface, geotextile conforming to requirements of clause 708.2, laid over a tack coat sqm 160.85 163.83 166.81
with 1.05 kg per sqm of paving grade bitumen 80 - 100 penetration and constructed to the requirement of
Recipe Cold Mix (Providing and laying of premix of crushed stone aggregates and emulsion binder, mixed in a
5.18 batch type cold mixing plant, laid over prepared surface, by paver finisher, rolled with a pneumatic tyred roller
initially and finished with a smooth steel wheel roller, all as per clause 518.3)
(i) 75 mm thickness cum 8,593.88 8,769.14 9,015.01
(ii) 40 mm thickness cum 11,884.79 12,120.92 12,429.30
(iii) 25 mm thickness cum 13,624.94 13,894.97 14,232.33
5.19 Bituminous Concrete with waste plastic
Bituminous Concrete Grading -I with waste plastic (Providing and laying bituminous concrete with higher
capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous
(i) binder @ 5.2 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver cum 10,133.10 10,336.60 10,616.10
finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory
and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in
Bituminous Concrete Grading -II with waste plastic (Providing and laying bituminous concrete with higher
capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous
(ii) binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver cum 10,426.60 10,637.10 10,922.30
finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory
and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in
CHAPTER-6
CEMENT CONCRETE PAVEMENTS
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared
sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25
mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1,
5.13 6.1 cum 3,738.04 3,805.55 3,862.10
cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length
construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to
site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.)
Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement
over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to
IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per
5.03 6.2 approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and cum 7,614.87 7,760.31 7,927.39
finished in a continuous operation including provision of contraction, expansion, construction and longitudinal
joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod,
admixtures as approved, curing compound, finishing to lines and grades as per drawing )
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
Transition section between rigid and flexible pavement (Due to change in the properties of materials and
type of construction, a gradual changeover from rigid pavement to flexible pavement is desirable to avoid any
6.3 damage at the butting joint. After provision of an expansion joint in the cement concrete slab, the thickness of
slab should be tapered to 10 cm over a length of 3 m towards the flexible pavement. The deficiency of thickness
caused due to tapering of the slab should be made up by the asphaltic layers.)
Construction of Base/Sub-base of pavement with lean concrete - fly ash. (Construction of Base/sub-base
using cement, sand, fly ash and coarse aggregates proportioned as per table 4 of IRC: 74/1979 and with water
content ratio, slump and compressive strength as defined in the said table, mix prepared in a batching and
6.4 cum 3,626.65 3,692.12 3,746.63
mixing plant and compacted with a vibratory roller 8-10 tonnes capacity within the time limit laid down vide
clause 7.6.3 of IRC: 74-1979, construction joints properly formed at the end of day's work, cured for 14 days, all
as specified in IRC: 74-1979 and as per approved plans.)
Cement - Fly ash concrete pavement. (Construction reinforced-reinforced, dowel jointed, plain cement
concrete pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate conforming to
IS 383, maximum size of coarse aggregate not exceeding 25 mm, replacing cement by fly ash to the extent of
5.12 6.5 15% and sand by 10%, mixed in a batching and mixing plant as per approved mix design, transported to site, cum 6,812.37 6,812.37 6,812.37
laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including
provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane,
sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound,
CHAPTER-7
GEOSYNTHETICS AND REINFORCED EARTH
Sub- Surface Drain with Geotextiles (Construction of sub surface drain 200 mm dia using geotextiles treated
with carbon black with physical properties as given in clause 702.2.3 formed in to a stable network and a planar
7.1 metre 974.00 992.00 1,010.00
geocomposite structure, joints wrapped with geotextile to prevent ingress of soil, all as per clause 702 and
approved drawings including excavation and backfilling)
Reinforced Earth Retaining Wall (Reinforced earth retaining walls have four main components as under: a)
Excavation for foundation, foundation concrete and cement concrete grooved seating in the foundation for
7.4
facing elements (facia material). b) Facia material and its placement. c) Assembling, joining with facing
elements and laying of the reinforcing elements. d) Earthfill with granular material which is to be retained by
(i) Assembling, joining and laying of reinforcing elements. Sqm
Type 5 [Link] reinforced polymer/fibre reinforced polymer/polymeric strips metre 70.00 71.00 72.00
B With reinforcing elements of synthetic geogrids sqm 240.00 240.00 240.00
(ii) Facing elements of RCC sqm 1,685.00 1,686.00 1,687.00
7.5 Bi-axial extruded high modulus polypropylene geogrid
Supplying & laying of bi-axial extruded high modulus polypropylene geogrid conforming to MORT&H
specification for base/sub-base reinforcement having minimum tensile strength 15kN/m in the longitudinal and
(i) transverse direction, with 5kN/m and 7kN/m tensile strength at 2% and 5% strain respectively in the longitudinal sqm 138.00 141.00 143.00
and transverse direction, junction efficiency not less than 95% and with 38mm X 38mm mesh opening.

Supplying & laying of bi-axial extruded high modulus polypropylene geogrid conforming to MORT&H
specification for base/sub-base reinforcement having minimum tensile strength 20kN/m in the longitudinal and
(ii) transverse direction, with 7kN/m and 14kN/m tensile strength at 2% and 5% strain respectively in the sqm 157.00 160.00 162.00
longitudinal and transverse direction, junction efficiency not less than 95% and with 38mm X 38mm mesh
opening.
Supplying & laying of bi-axial extruded high modulus polypropylene geogrid conforming to MORT&H
specification for base/sub-base reinforcement having minimum tensile strength 30kN/m in the longitudinal and
(iii) transverse direction, with 10.5kN/m and 21kN/m tensile strength at 2% and 5% strain respectively in the sqm 248.00 250.00 255.00
longitudinal and transverse direction, junction efficiency not less than 95% and with 38mm X 38mm mesh
opening.
Supplying & laying of bi-axial extruded high modulus polypropylene geogrid coforming to MORT&H
specification for base/sub-base reinforcement having minimum tensile strength 40kN/m in the longitudinal and
(iv) transverse direction, with 14kN/m and 28kN/m tensile strength at 2% and 5% strain respectively in the sqm 353.00 359.00 366.00
longitudinal and transverse direction, junction efficiency not less than 95% and with 38mm X 38mm mesh
opening.
Supplying and laying high strength flexible geogrids (HSFG) as soil reinforcement / basal reinforcement as
per MORTH 3100 and IRC 113, made of high tenacity polyester core with polyethylene coating with minimum
7.6 Long Term Design Strength (LTDS) of more than 50% of ultimate tensile strength at 30 degree Celcius
corresponding to 12 % strain etc. complete and as directed by Engineer - In - Charge.

(i) Synthetic Geogrid Ultimate tensile strength- 100 kN/m sqm 310.00 315.00 321.00
(ii) Synthetic Geogrid Ultimate tensile strength- 150 kN/m sqm 324.00 330.00 336.00
(iii) Synthetic Geogrid Ultimate tensile strength- 200 kN/m sqm 517.00 527.00 537.00
(iv) Synthetic Geogrid Ultimate tensile strength- 250 kN/m sqm 533.00 542.00 552.00
(v) Synthetic Geogrid Ultimate tensile strength- 300 kN/m sqm 547.00 558.00 568.00
(vi) Synthetic Geogrid Ultimate tensile strength- 350 kN/m sqm 563.00 574.00 584.00
(vii) Synthetic Geogrid Ultimate tensile strength- 400 kN/m sqm 682.00 695.00 707.00
(viii) Synthetic Geogrid Ultimate tensile strength- 500 kN/m sqm 755.00 769.00 783.00
(ix) Synthetic Geogrid Ultimate tensile strength- 600 kN/m sqm 830.00 845.00 860.00
(x) Synthetic Geogrid Ultimate tensile strength- 800 kN/m sqm 980.00 998.00 1,016.00
(xi) Synthetic Geogrid Ultimate tensile strength- 900 kN/m sqm 1,091.00 1,111.00 1,131.00
(xii) Synthetic Geogrid Ultimate tensile strength- 1000 kN/m sqm 1,278.00 1,302.00 1,325.00
(xiii) Synthetic Geogrid Ultimate tensile strength- 1100 kN/m sqm 1,426.00 1,452.00 1,478.00
(xiv) Synthetic Geogrid Ultimate tensile strength- 1200 kN/m sqm 1,499.00 1,527.00 1,554.00
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
Supplying & laying of drainage composite for use behind walls, between two different fills, alongside
drains of road, below concrete lining of canals etc. Geocomposite for planar drainage, realized by
thermobonding a draining core in extruded monofilaments with two filtering nonwoven geotextiles that may also
be working as separation or protecting layers. The draining three dimensional core will have a “W” configuration
as longitudinal parallel channels. Minimum thickness to be 7.2mm, with two filtering UV stabilized polypropylene
7.8 nonwoven geotextile of minimum thickness of 0.75 mm having pores of 150 micron and tensile strength of 8.0 sqm 677.00 690.00 702.00
kN/m that will be working as separation or protecting layer, geocomposite having in plane flow capacity of 2.1 L
/ (m.s) at hydraulic gradient of 1.0 & 20 kpa pressure and tensile strength of 18 kN/m , with mass per unit area
of 740 gsm, supplied in the form of roll for easy transportation to site of work as per detailed specification all
complete as per directions of Engineer in charge.
Supplying & laying of drainage composite for use behind walls, between two different fills, alongside
drains of road, below concrete lining of canals etc. Geocomposite for planar drainage, realized by
thermobonding a draining core in extruded monofilaments with two filtering nonwoven geotextiles that may also
be working as separation or protecting layers. The draining three dimensional core will have a “W” configuration
as longitudinal parallel channels. Minimum thickness to be 7.2mm, with two filtering UV stabilized polypropylene
7.9 nonwoven geotextile of minimum thickness of 0.75 mm having pores of 150 micron and tensile strength of 8.0 sqm 804.00 819.00 833.00
kN/m that will be working as separation or protecting layer, geocomposite having in plane flow capacity of 2.1 L
/ (m.s) at hydraulic gradient of 1.0 & 20 kpa pressure and tensile strength of 18 kN/m , with mass per unit area
of 740 gsm, supplied in the form of roll for easy transportation to site of work as per detailed specification all
complete as per directions of Engineer in charge.

CHAPTER-8
TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES
Cast in Situ Cement Concrete M20 kerb (Construction of cement concrete kerb with top and bottom width
115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick,
8.1
foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation
concrete laid manually, all complete as per clause 408)
A Using Concrete Batching and Mixing Plant
(i) PCC M15 for Kerb base metre 178.00 181.00 184.00
14.44a (ii) PCC M20 for Kerb (Cast in Situ) metre 217.00 221.00 224.00
Cast in Situ Cement Concrete M 20 Kerb with Channel (Construction of cement concrete kerb with channel
with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade
8.2
foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCC M20 grade, sloped towards the kerb,
kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per
A Using Concrete Batching and Mixing Plant
(i) PCC M15 for Kerb base metre 152.00 155.00 157.00
7.02 (ii) PCC M20 for Kerb (Cast in Situ) metre 253.00 257.00 262.00
Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic
8.3
enamel paint black or any other approved colour to give an even shade)
Hindi ( Matras commas and the like not to be measured and paid for Half letter shall be counted as half ) cm height
(i) 1.70 1.70 1.70
per letter
English and Roman cm height
(ii) 1.00 1.00 1.00
per letter
Retro- reflectorised Traffic signs (Providing and fixing of retro- reflectorised cautionary, mandatory and
informatory sign as per IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed
8.4 over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly
fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm
x 60 cm, 60 cm below ground level as per approved drawing)
6.29e (i) 120 cm equilateral triangle each 7,695.00 7,838.00 7,980.00
6.30f ( ii ) 90 cm equilateral triangle each 5,649.00 5,753.00 5,858.00
( iii ) 75 cm equilateral triangle each 4,845.00 4,935.00 5,024.00
6.38 ( iv ) 60 cm equilateral triangle each 4,741.00 4,818.00 4,896.00
(v) 120 cm circular each 11,502.00 11,715.00 11,928.00
6.28b (vi ) 90 cm circular each 7,790.00 7,934.00 8,079.00
( vii ) 75cm circular each 6,332.00 6,449.00 6,566.00
6.39 ( viii ) 60 cm circular each 5,139.00 5,234.00 5,329.00
6.51 ( ix) 90 cm x 75 cm rectangular each 8,081.00 8,231.00 8,381.00
( x) 80 mm x 60 mm rectangular each 6,619.00 6,741.00 6,864.00
( xi) 60 cm x 50 cm rectangular each 5,268.00 5,366.00 5,463.00
6.54 ( xii) 60 cm x 45 cm rectangular each 5,043.00 5,136.00 5,230.00
( xiii) 60 cm x 60 cm square each 5,718.00 5,824.00 5,930.00
6.28f ( xiv) 120 cm high octagon each 11,967.00 12,189.00 12,410.00
( xv) 90 cm high octagon each 8,052.00 8,201.00 8,350.00
( xvi) 75 cm high octagon each 6,513.00 6,634.00 6,755.00
Direction and Place Identification signs upto 0.9 sqm size board. (Providing and erecting direction and
place identification retro-reflectorised sign asper IRC:67 made of encapsulated lens type reflective sheeting
6.34d 8.5 vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a sqm 10,861.00 11,060.00 11,260.00
mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed
foundation with M15 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
Direction and Place Identification signs with size more than 0.9 sqm size board. (Providing and erecting
direction and place identification retro- reflectorised sign asper IRC :67 made of encapsulated lens type
reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm
6.33d 8.6 sqm 11,567.00 11,779.00 11,991.00
supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of
properly designed foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground
level as per approved drawing)
Overhead Signs (Providing and erecting overhead signs with a corrosion resistant aluminium alloy sheet
reflectorised with high intensity retro-reflective sheeting of encapsulated lense type with vertical and lateral
8.7 clearance given in clause 802.2 and 802.3 and installed as per clause 802.7 over a designed support system of
aluminium alloy or galvanised steel trestles and trusses of sections and type as per structural design
requirements and approved plans)
6.23 A Truss and Vertical Support tonne 149,135.00 151,897.00 154,658.00
6.35d B Aluminium alloy plate for over head sign sqm 1,854.00 1,888.00 1,922.00
Painting Two Coats on New Concrete Surfaces (Painting two coats after filling the surface with synthetic
NDR2 8.8 sqm 112.00 114.00 116.00
enamel paint in all shades on new plastered concrete surfaces)
Painting on Steel Surfaces (Providing and applying two coats of ready mix paint of approved brand on steel
8.9 sqm 102.00 106.00 110.00
surface after through cleaning of surface to give an even shade)
Painting on Wood Surfaces (Providing and applying two coats of ready mix paint of approved brand on wood
8.10 sqm 113.00 115.00 117.00
surface after through cleaning of surface to give an even shade)
Painting Lines, Dashes, Arrows etc on Roads in Two Coats on New Work (Painting lines, dashes, arrows
8.11 etc on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous
surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic
6.12a (i) Over 10 cm in width sqm 208.00 212.00 216.00
(ii) Up to 10 cm in width sqm 176.00 179.00 183.00
Painting Lines, Dashes, Arrows etc on Roads in Two Coats on Old Work (Painting lines, dashes, arrows
8.12 etc on roads in two coats on old work with ready mixed road marking paint confirming to IS: 164 on bituminous
surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic
6.08a (i) Over 10 cm in width sqm 147.00 150.00 152.00
(ii) Up to 10 cm in width sqm 159.00 162.00 165.00
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on
Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including
8.13 sqm 678.00 690.00 703.00
reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass
beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.)
Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-
8.14
1980, fixing in position including painting and printing etc)
6.02c (i) 5th kilometre stone (precast) each 5,205.00 5,235.00 5,265.00
6.02b (ii) Ordinary Kilometer stone (Precast) each 2,993.00 3,007.00 3,022.00
6.02a (iii) Hectometer stone (Precast) each 874.00 880.00 886.00
Road Delineators (Supplying and installation of delineators (road way indicators, hazard markers, object
markers), 80-100 cm high above ground level, painted black and white in 15 cm wide stripes, fitted with 80 x
6.15 8.15 each 2,925.00 2,979.00 3,032.00
100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and
confirming toIRC-79 and the drawings.)
Boundary pillar (Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25-
8.16 each 821.00 829.00 837.00
1967, fixed in position including finishing and lettering but excluding painting)
G.I Barbed wire Fencing 1.2 metre high (Providing and fixing 1.2 metres high GI barbed wire fencing with 1.8
m angle iron posts 40 mm x 40 mm x 6 mm placed every 3 metres center to center founded in M15 grade
8.17 cement concrete, 0.6 metre below ground level, every 15th post, last but one end post and corner post shall be metre 378.00 385.00 392.00
strutted on both sides and end post on one side only and provided with 9 horizontal lines and 2 diagonals
interwoven with horizontal wires, fixed with GI staples, turn buckles etc complete as per clause 808 )
G.I Barbed wire Fencing 1.8 metre high (Providing and fixing 1.8 metres high GI barbed wire fencing with 2.4
m angle iron posts 50 mm x 50 mm x 6 mm placed every 3 metres center to center founded in M15 grade
44.13 8.18 cement concrete, 0.6 metre below ground level, every 15th post, last but one end post and corner post shall be metre 614.00 625.00 636.00
strutted on both sides and end post on one side only and provided with 12 horizontal lines and 2 diagonals
interwoven with horizontal wires, fixed with GI staples, turn buckles etc complete as per clause 808 )
Tubular Steel Railing on Precast RCC posts, 1.2 m high above ground level (Providing, fencing and
40.07 8.21 erecting 50 mm dia painted steel pipe railing in 3 rows on precast M20 grade RCC vertical posts1.8 metres high metre 4,500.00 4,581.00 4,596.00
(1.2 m above GL) with 3 holes 50 mm dia for pipe, fixed 2 metres centre to, complete as per approved drawing)
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the
edges of the road, approaches to bridge structures and medians, constructed with Reinforced Cement Concrete
with HYSD reinforcement conforming to MORTH specification & as per details given in IRC 5 including dowel
8.22
bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board etc as per
approved drawing and at locations directed by the Engineer, all as specified (Area = 0.243 sqm/ Single face)

7.37 (i) M 40 grade concrete metre 2,912.00 2,912.00 2,913.00


8.23 Metal Beam Crash Barrier
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier
comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC
series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below
A metre 4,055.00 4,129.00 4,204.00
ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to
IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x
75 x 5 mm, 330 mm long complete as per clause 811)
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
Type - B, "THRIE" : Metal Beam Crash Barrier (Providing and erecting a "Thrie" metal beam crash barrier
comprising of 3 mm thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on ISMC
series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 2 m high with 1.15 m below
7.30 B metre 6,528.00 6,648.00 6,768.00
ground level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367
and IS:1364, metal beam rail to be fixed on the vertical post with a space of channel section 150 x 75 x 5 mm,
546 mm long complete as per clause 811)
Road Traffic Signals electrically operated (Since it is a ready made item commercially produced and erected
8.24 by specialised firm in the electrical and electronic field, rate may be taken based on market enquiry from firms
specialised in this field and ISI certified for the approved design and drawing.)
Flexible Crash Barrier, Wire Rope Safety Barrier (Providing and erecting a wire rope safety barrier with
vertical posts of medium weight RS Joist (ISMB series) 100 mm x 75 mm (11.50 kg/m), 1.50 m long 0.85 m
above ground and 0.65 m below ground level, split at the bottom for better grip, embedded in M 15 grade
cement concrete 450 x 450 x 450 mm, 1.50 m center to center and with 4 horizontal steel wire rope 40 mm dia
8.25 metre 2,006.00 2,041.00 3,109.00
and anchored at terminal posts 15 m apart. Terminal post to be embedded in M 15
gradecementconcretefoundation2400 x 450 x 900 mm (depth), strengthened by a strut of RS joist 100 x 75 mm,
2 m long at 450 inclination and a tie 100 x 8 mm, 1.50 m long at the bottom, all embedded in foundation
concrete as per approved design and drawing, rate excluding excavation and cement concrete.)
8.26 Anti - Glare Devices in Median
Plantation (Plantation of shrubs and plants of approved species in the median. apart from cutting off glare from
TP2 A vehicle coming from opposite direction, these plants provide a pleasant envoirenment and are eco-friendly. The
rate for this item is available in the chapter 11 on horticulture. )
Anti - Glare Screen with 25 mm steel pipe framework fixed with circular and rectangular vans
(Providing and erecting an anti - glare screen with 25 mm dia vertical pipes fabricated and framed in the form
B of panels of one metre length and 1.75 mtr height fixed with circular vane 250 mm dia at top and rectangular metre 3,569.00 3,632.00 3,695.00
vane 600 x 300 mm at the middle, made out of steel sheet of 3 mm thickness, end vertical pipes of the panel
made larger for embedding in foundation concrete, applying 2 coats of paint on all exposed surfaces, all as
Anti - Glare Screen with Rectangular Vane of MS sheet (Providing and erecting anti - glare screen with
rectangular vanes of size 750 x 500 mm made from MS sheet, 3 mm thick and fixed on MS angle 50 x 50 x 6
C mm at an angle of 450 to the direction of flow of traffic, 1.5 m center to center, top edge of the screen 1.75 m metre 1,189.00 1,210.00 1,230.00
above ground level, vertical post firmly embedded in cement concrete foundation 0.60 m below ground level,
applying 2 coats of paint on exposed faces, all complete as per approved design and drawings)
Street Lighting (Providing and erecting street light mounted on a steel circular hollow pole of standard
8.27 specifications for street lighting, 9 m high spaced 40 m apart, 1.8 m overhang on both sides if fixed in the
median and on one side if fixed on the footpath, fitted with sodium vapour lamp and fixed firmly in concrete
(i) For Fixing in Median each 84,693.00 94,051.00 92,139.00
(ii) For fixing in Footpath each 84,579.00 86,137.00 92,025.00
Lighting on Bridges (Providing and fixing lighting on bridges, mounted on steel hollow circular poles of
8.28 each 51,597.00 52,547.00 54,025.00
standard specifications, 5 m high fixed on parapets with cement concrete, 20 m apart and fitted with sodium
Highway Patrolling and Traffic Aid Post (It is proposed to locate one Traffic Aid Post every 50-60 km of the
8.30
highway. )
Items related to under pass/ subway/ overhead bridge/ overhead foot bridge (The items involved for
underpass/ subway/ overhead bridge/ overhead foot bridge are earthwork, plain cement concrete, plastering,
8.31
painting, information sign etc. The rates for these items are available in respective chapters which can be
adopted for the quantities derived from the approved designs and drawings)
Traffic Control System and Communication system (Providing a traffic control centre and communication
system including telecommunication facilities and related accessories, CCTV, radar, vehicle detection camera,
central computer system These are specialised item of telecommunication system and are the commercial
8.32
products. The designer is required to contact the manufacturers to ascertain market prices. In case of civil
works required to be executed for these installations, pricing may be done as per rates in relevant chapters for
quantities derived approved design and drawing.)
Gantry Mounted Variable Message Sign board (Providing and erecting gantry mounted variable message
8.33 sign board electronically operated capable of flashing the desired message over a designed support system of
aluminium alloy or galvanised steel, erected as per approved design and drawings and with lateral clearance as
(i) Gantry Support System tonne 148,738.00 151,492.00 6,207.00
Message Display (Message display board 6 sqm electronically operated with complete electronic fitments
(ii)
for flashing the pre-determined messages.)
Road Markers/Road Stud with Lense Reflector (Providing and fixing of road stud 100x 100 mm, die cast in
aluminium, resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or
6.09 8.35 each 222.00 226.00 230.00
asphaltic surface by drilling hole 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or
epoxy mortar, all as per BS 873 part 4:1973)
8.37 Roadside Amenities
Rest Areas (Providing plainly furnished accommodation for rest rooms, dormitories, restaurants, stalls, shops,
petrol pump, telephone booth, first aid room, traffic aid post, police assistance booth, including electricity, toilet
A
and sewerage system Pricing may be done based on current plinth area rates approved by PWD/CPWD/MES
for a particular zone. Area is required to be assessed for specific location as per actual site conditions)
Parking areas and Bus Laybyes for Trucks, Buses and Light vehicles (Pricing of parking areas may be
B done for the quantities of various items based on the approved dimensions and pavement design for a
particular terrain and soil. Rates for items may be from respective chapters.)
C Lawn (Providing a lawn planted with grass and its maintenance )
Rumble Strips (Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at
8.38 center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white sqm
strips of road marking paint.)
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
High Mast Pole Lighting at Interchanges and Flyovers (Providing and erecting a high mast pole lighting with
30 m high hot dip galvanised mast designed to withstand forces exerted with wind speeds of 180 km per hour
with 3 seconds gust, as per IS:875 (Part 3) - 1978, fitted with a base flange, door at the base of mast with
heavy duty internal lock, lantern carriage, suitable winching arrangement for safe working load of 750 kg and
8.40 high powered electrically driven power tools for raising and lowering of lantern carriage, flexible 8 core electric
cable, lightening conductor, earthing terminal, and fixing 2 nos aviation obstruction lights on top of the mast,
all complete as per approved design and drawings This is a specialised work and is generally done by firms
who specialise in such jobs. The detailed designs and estimates are submitted by the firms alongwith their
tender for checks by the Department. The cost of this work is required to be worked out based on approved
Toll Plaza (The construction, operation and maintenance of Toll Plaza can be broken into separate items of
8.41
work as under based on the approved design and drawings:-)
Safety Devices and signs in Construction Zones (Provision and fixing of traffic signs for limited period at
suitable locations in construction zone comprising of warning zone, approach transition zone, working zone
and terminal transition zone with a minimum distance of 60 cm from the edge of the kerb in case of kerbed
8.42 roads and 2 to 3 m from the edge of the carriageway in case of un-kerbed roads, the bottom edge of the lowest
sign plate to be not less than 2 m above the road level, fixed on 60 mm x 60 mm x 6 mm angle iron post,
founded and installed as per approved design and drawings, removed and disposed of after completion of
construction work, all as per IRC:SP:55-2001)
Portable Barricade in Construction Zone (Installation of a steel portable barricade with horizontal rail 300
mm wide, 2.5 m in length fitted on a 'A' frame made with 45 x 45 x 5 mm angle iron section, 1.5 m in height,
8.43 each 3,929.00 4,076.00 4,226.00
horizontal rail painted (2 coats) with yellow and white stripes, 150 mm in width at an angle of 450, 'A' frame
painted with 2 coats of yellow paint, complete as per IRC:SP:55-2001 )
8.44 Permanent Type Barricade in Construction Zone
With Steel Components (Construction of a permanent type barricade made of steel components, 1.5 m
high from road level, fitted with 3 horizontal rails 200 mm wide and 4 m long on 50 x 50 x 5 mm angle iron
A each 6,246.00 6,361.00 6,477.00
vertical support, painted with yellow and white strips, 150 mm in width at an angle of450, complete as per
IRC:SP:55-2001 )
With Wooden Components (Construction of a permanent type barricade made of wooden components, 1.5
m high from road level, fitted with 3 horizontal planks 200 mm wide and 3.66 m long on 100 x 100mm
B each 23,416.00 23,850.00 24,284.00
wooden vertical post, painted with yellow and white striups, 150 mm in width at an angle of450, complete as
per IRC:SP:55-2001 )
With Bricks (Construction of a permanent type barricade made with brick work in mud mortar, 1.5 m high,
C each 18,385.00 18,725.00 19,066.00
4 m long, 600 mm thick, plastered with cement mortar 1:6, painted with yellow and white strips)
Water Filled Barricades Work zone sheeting (Providing water filled barricades made up of LDPE to
8.46 segregate the vehicular movement and workzone as per IRC SP 55 shall be in Trapezoidal Shape 800 mm to each 4,000.00 4,074.00 4,149.00
1000 mm in length, 700 mm in height for Major Roads and expressway and 500 mm tall for other roads with
Providing Tubular Marker made up of Polyurethane used to divide opposing lanes of road users shall be
8.47 flexible in nature. Tubular maker having minimum height 450 mm shall be having minimum 75 mm each 781.00 795.00 810.00
Reboundable workzone retroreflective sheeting as per ASTM 4956 S2. Application of Tubular Marker Shall be
Providing Tubular Marker made up of Polyurethane used to divide opposing lanes of road users shall be
8.48 flexible in nature. Tubular maker having minimum height 700 mm shall be having minimum 75 mm each 923.00 941.00 958.00
Reboundable workzone retroreflective sheeting as per ASTM 4956 S2. Application of Tubular Marker Shall be
Advanced Traffic Management Systems (ATMS) work shall cover design, supply, installation,
commissioning and/or operation and maintenance of Advance Traffic Management Systems (which is one of
the components of Intelligent Transport Systems - ITS). The system would include out-door equipment
8.50 including emergency call boxes, variable message sign systems, meteorological data system, close circuit TV
camera (CCTV) system, traffic counting and classification system and transmission system. The indoor
equipment would comprise a large display board, central computer (with Network Management System - NMS),
CCTV monitor system, call centre system or management of emergency call boxes housed in a control centre
with uninterrupted power supply.
A Traffic Management Command Centre Equipment
Control Centre Server Nos. 840,000.00 840,000.00 840,000.00
Hot Standby Backup Server Nos. 840,000.00 840,000.00 840,000.00
NAS Video Server with storage Minimum 70 TB Nos. 1,080,000.00 1,080,000.00 1,080,000.00
Backup Video (Only Incidents) Server Nos. 840,000.00 840,000.00 840,000.00
Graphic Display (70" LED DLP in 3x2 matrix) Nos. 2,400,000.00 2,400,000.00 2,400,000.00
Graphic Display Controller and software including Video Switches Nos. 1,160,000.00 1,160,000.00 1,160,000.00
CCTV Monitoring Workstation Nos. 68,000.00 68,000.00 68,000.00
Emergency Telephone (1033) console Nos. 180,000.00 180,000.00 180,000.00
VIDS- Workstation Nos. 68,000.00 68,000.00 68,000.00
Administrative Workstation Nos. 44,000.00 44,000.00 44,000.00
ATMS Operator Workstation Nos. 44,000.00 44,000.00 44,000.00
CCTV Joystick Nos. 76,000.00 76,000.00 76,000.00
Operations Laser Printer (Colour) Nos. 108,000.00 108,000.00 108,000.00
Operations Laser Printer (Black) Nos. 76,000.00 76,000.00 76,000.00
Rack 19" Nos. 46,400.00 46,400.00 46,400.00
B Advanced Traffic Management Systems (ATMS) Software
ATMS Control Room Software (integrated with VIDS, ATCC, VMS, MOS) Nos. 1,200,000.00 1,200,000.00 1,200,000.00
Video Management Software with atleast 150 VMS Lic. Nos. 780,000.00 780,000.00 780,000.00
Facility Monitoring System Controller Software Nos. 440,000.00 440,000.00 440,000.00
Server & Database license Nos. 800,000.00 800,000.00 800,000.00
Antivirus license Nos. 160,000.00 160,000.00 160,000.00
C PTZ Closed Circuit Television System
PTZ Camera (including CCTV Controller) Set 96,000.00 96,000.00 96,000.00
Solar System with UPS, battery & 12m Pole & Cabinet Set 68,000.00 68,000.00 68,000.00
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
D Video Incident Detection System Equipment (VIDS)
VIDS Camera (including Image Processing unit) Set 132,000.00 132,000.00 132,000.00
Warning amber lights with hooters, 72 Hrs solar backup, 5m poles and foundation Set 91,200.00 91,200.00 91,200.00
Cabinet Nos. 22,800.00 22,800.00 22,800.00
12 m Pole (including manufacturing and galvanizing) Nos. 20,160.00 20,160.00 20,160.00
Solar System with UPS & batteries Set 18,000.00 18,000.00 18,000.00
E Automatic Traffic Counters-cum-classifier System Equipment (ATCC)
Equipment, Sensor unit, Processing unit, Solar power supply Set 660,000.00 660,000.00 660,000.00
Solar System with UPS, batteries Set 74,880.00 74,880.00 74,880.00
F Variable Message Sign Equipment (VMS)
VMS (Variable Message Sign - M type) Nos. 920,000.00 920,000.00 920,000.00
Gantry (including manufacturing and galvanizing) Nos. 760,000.00 760,000.00 760,000.00
Solar System with UPS, battery and cabinet for M type VMS Set 312,000.00 312,000.00 312,000.00
G UPS and Power system
Uninterruptible Power Supply (UPS) For Server Rack (10 KVA) Set 520,000.00 520,000.00 520,000.00
Uninterruptible Power Supply (UPS) For TMC (30 KVA) Set 1,160,000.00 1,160,000.00 1,160,000.00
Power Distribution Board (Essential & Critical Supply) Set 44,000.00 44,000.00 44,000.00
H Meteorological Observation System (MOS)
MOS sensor Equipment (including MOS Controller) Set 848,000.00 848,000.00 848,000.00
Cabinet Nos. 22,800.00 22,800.00 22,800.00
Pole Nos. 25,600.00 25,600.00 25,600.00
Steel fence for protection Set 60,000.00 60,000.00 60,000.00
I Digital Transmission System (DTS)
24 Core Armoured OFC + all accessories Meter 384.00 384.00 384.00
40 mm PLB HDPE duct as per latest TSEC specifications + all accessories Meter 456.00 456.00 456.00
Trenching of 1.8 meters, Laying & Backfilling for PLB HDPE duct Meter 160.00 160.00 160.00

CHAPTER-9
CULVERTS & BOX CELL
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical
9.1 specification, including setting out, construction of shoring and bracing, removal of stumps and other
deleterious matter, dressing of sides and bottom and backfilling with approved material.)
I Ordinary soil
A Manual Means
12.06a (i) upto 3 m depth cum 297.00 297.00 297.00
(ii) 3 m to 6 m depth cum 381.00 381.00 381.00
(iii) Above 6 m depth cum 509.00 509.00 509.00
B Mechanical Means
12.03b (i) Depth upto 3 m cum 78.00 79.00 91.00
(ii) Depth 3 m to 6 m cum 86.00 87.00 101.00
(iii) Depth above 6m cum 96.00 96.00 112.00
II Ordinary rock (not requiring blasting)
A Manual Means
12.08a (i) Depth upto 3 m cum 424.00 424.00 424.00
B Mechanical Means cum 463.00 475.00 483.00
III Hard rock ( requiring blasting )
A Manual Means cum 852.00 852.00 852.00
B Mechanical Means cum 486.00 486.00 510.00
IV Hard rock ( blasting prohibited )
A Mechanical Means cum 604.00 650.00 721.00
V Marshy soil
(i) upto 3 m depth
A Manual means cum 1,080.00 1,080.00 1,080.00
12.11a B Mechanical Means cum 705.00 710.00 755.00
VI Back Filling in Marshy Foundation Pits cum 714.00 714.00 714.00
Filling Annular Space Around Footing in Rock ( Lean cement concrete [Link] nominal mix. Rate may be
9.2 cum 5,425.00 5,426.00 5,434.00
taken as per item 9.4.)
Sand Filling in Foundation Trenches as per Drawing & Technical Specification
9.3 cum 2,869.00 2,869.00 2,871.00
Plain cement concrete [Link] nominal mix in foundation with crushed stone aggregate 40 mm nominal size
9.4 cum 5,425.00 5,426.00 5,434.00
mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per
9.5 cum 7,990.00 7,993.00 8,011.00
Drawing and Technical Specifications.
9.6 Cement Mortar
A Cement Mortar 1:3 (1 cement : 3 sand) cum 5,499.00 5,499.00 5,499.00
B Cement Mortar1:2 (1cement :2 sand) cum 6,258.00 6,258.00 6,258.00
C Cement Mortar1:4 (1cement :4 sand) cum 4,985.00 4,985.00 4,985.00
D Cement Mortar1:6 (1cement :6 sand) cum 4,676.00 4,676.00 4,676.00
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and
9.8 cum 7,653.00 7,657.00 7,675.00
Technical Specifications
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications
9.9 Sqm. 1,106.00 1,106.00 1,106.00
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
9.10 Sqm. 1,982.00 1,983.00 1,988.00
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
Laying Reinforced Cement Concrete Pipe NP4/prestrssed concrete pipe on first class bedding in single
row . (Laying Reinforced cement concrete pipe NP4/prestrssed concrete pipe for culverts on first class bedding
9.12
of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation,
protection works, backfilling, concrete and masonry works in head walls and parapets . )
A 300 mm dia metre
B 600 mm dia metre
C 900 mm dia metre
D 1000 mm dia metre 11,942.00 12,391.00 12,391.00
11.21 E 1200 mm dia metre 14,091.00 14,091.00 14,091.00
Laying Reinforced Cement Concrete Pipe NP 4 /prestrssed concrete pipe on first class bedding in
double row . (Laying Reinforced cement concrete pipe NP4 /prestrssed concrete pipe for culverts on first class
9.13
bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . )
A 300 mm dia
B 600 mm dia
C 900 mm dia
D 1000 mm dia metre 24,133.00 24,133.00 24,133.00
F 1500 mm dia #VALUE! #VALUE! #VALUE!
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical
9.14
Specifications.
A PCC Grade M15
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 5,709.00 5,714.00 5,735.00
11.30 Case II With Batching Plant, Transit Mixer and Manual placing cum 6,195.00 6,200.00 6,222.00
B PCC Grade M20
17.28 Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,363.00 6,367.00 6,389.00
Case II With Batching Plant, Transit Mixer and Manual placing cum 6,849.00 6,854.00 6,875.00
C RCC Grade M20
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,452.00 6,456.00 6,477.00
11.29 Case II With Batching Plant, Transit Mixer and Manual placing cum 7,019.00 7,024.00 7,045.00
D PCC Grade M25
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,806.00 6,811.00 6,832.00
Case II With Batching Plant, Transit Mixer and Manual placing cum 7,289.00 7,293.00 7,315.00
E RCC Grade M25
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 7,173.00 7,178.00 7,199.00
25.13 Case II With Batching Plant, Transit Mixer and Manual placing cum 7,687.00 7,692.00 7,713.00
F PCC Grade M30
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,854.00 6,858.00 6,880.00
Case II With Batching Plant, Transit Mixer and Manual placing cum 7,337.00 7,341.00 7,363.00
G RCC Grade M30
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 7,320.00 7,324.00 7,346.00
Case II With Batching Plant, Transit Mixer and Manual placing cum 7,834.00 7,838.00 7,860.00
H RCC Grade M35
17.31 Case I With Batching Plant, Transit Mixer and Concrete Pump cum 7,644.00 7,649.00 7,670.00
Case II With Batching Plant, Transit Mixer and Manual placing cum 8,162.00 8,166.00 8,188.00
I RCC Grade M40
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 8,148.00 8,153.00 8,174.00
Case II With Batching Plant, Transit Mixer and Manual placing cum 8,694.00 8,703.00 8,744.00
Plain/Reinforced Cement Concrete for wall & slab etc. complete as per Drawing and Technical
9.15
Specifications.
A RCC Grade M20
12.57 With Batching Plant, Transit Mixer and Concrete Pump cum 7,331.00 7,336.00 7,361.00
B RCC Grade M25
With Batching Plant, Transit Mixer and Concrete Pump cum 8,151.00 8,156.00 8,181.00
C RCC Grade M30
14.17 With Batching Plant, Transit Mixer and Concrete Pump cum 8,381.00 8,386.00 8,411.00
D RCC Grade M35
14.89 With Batching Plant, Transit Mixer and Concrete Pump cum 8,621.00 8,626.00 8,651.00
E RCC Grade M40
With Batching Plant, Transit Mixer and Concrete Pump cum 9,259.00 9,265.00 9,289.00
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing
14.01 9.16 tonne 102,545.43 102,545.43 102,545.43
and Technical Specifications.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with
17.37 9.17 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards Nos. 286.00 286.00 286.00
drawing foce. Complete as per drawing and Technical Specifications
9.18 PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification
14.58 Case I With Batching Plant, Transit Mixer and Concrete Pump cum 5,191.00 5,195.00 5,215.00
Case II With Batching Plant, Transit Mixer and Manual placing cum 5,633.00 5,637.00 5,656.00
Reinforced cement concrete approach slab including reinforcement and formwork complete as per
14.59 9.19 cum 11,104.00 11,104.00 11,104.00
drawing and Technical specification
14.50 9.2 Drainage Spouts complete as per drawing and Technical specification Nos. 1,612.00 1,612.00 1,612.00
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per
9.21 cum 13,333.00 13,333.00 13,333.00
drawing and Technical Specifications
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
Providing and laying 12 mm thick mastic asphalt wearing course on top of deck slab excluding prime coat
with paving grade bitumen meeting the requirements given in Table 500-39, prepared by using mastic cooker and
laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen
9.22 Sqm. 590.00 590.00 590.00
precoated fine grained hard stone chipping of 9.5 mm nominal size at the rate of 0.005cum per 10 sqm and at an
approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of
surfaces not less than 100 deg. C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 516.
9.23 Crash Barriers Rm
Providing and applying 2 coats of water based cement paint to unplastered concrete surface after
9.24 Sqm. 864.32 864.32 864.32
cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.
9.25 Filler joint
(i) Providing & fixing 2 mm thick corrugated copper plate in expansion joint complete as per drawing &
Sqm. 3,487.00 3,487.00 3,487.00
Technical Specification.
(ii) Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing &
Sqm. 53.00 53.00 53.00
Technical Specification.
(iii) Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of
simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered Sqm. 536.00 536.00 536.00
with sealant complete as per drawing and technical specifications.
(iv) Providing and filling joint sealing compound as per drawings and technical specifications with coarse
Sqm. 50.00 50.00 50.00
sand and 6 per cent bitumen by weight
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical
9.26
Specification
12.70 A Granular material cum 2,590.00 2,590.00 2,590.00
12.71 B Sandy material cum 3,586.00 3,586.00 3,586.00
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the
requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600
12.72 9.27 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire 1,787.00 1,787.00 1,787.00
surface behind abutment, wing wall and return wall to the full height compacted to a firm condition
complete as per drawing and Technical Specification.

CHAPTER-10
MAINTENANCE OF ROADS
Restoration of Rain Cuts (Restoration of rain cuts with soil, moorum, gravel or a mixture of these, clearing
10.1 the loose soil, benching for 300 mm width, laying fresh material in layers not exceeding 250 mm and cum 199.00 205.00 215.00
compacting with plate compactor or power rammers to restore the original alignment, levels and slopes)
Maintenance of Earthen Shoulder (filling with fresh soil) (Making up loss of material/ irregularities on
10.2 sqm 97.00 100.00 102.00
shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.)
Maintenance of Earth Shoulder (stripping excess soil) (Stripping excess soil from the shoulder surface to
10.3 sqm 39.00 40.00 41.00
achieve the approved level and compacting with plate compactor)
Filling Pot- holes and Patch Repairs with open - graded Premix surfacing, 20mm. (Removal of all failed
material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack
10.4 coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous sqm 172.00 174.00 178.00
material as per clause 510, compacting, trimming and finishing the surface to form a smooth continuous
surface, all as per clause 3004.2)
Filling Pot- holes and Patch Repairs with - Bituminous concrete, 40mm. ( Removal of all failed material,
trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on
10.5
the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as
per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per
(i) for grading I Material sqm 444.00 451.00 460.00
(ii) for grading II Material sqm 486.00 493.00 503.00
Crack Filling (Filling of crack using slow - curing bitumen emulsion and applying crusher dust in case crack are
10.6 metre 5.00 5.00 5.00
wider than 3mm.)
10.7 Dusting (Applying crusher dust to areas of road where bleeding of excess bitumen has occurred.) sqm 2.66 2.71 2.76
10.8 A Fog Seal (ref item 5.17) sqm 41.32 42.09 42.85
B Crack Prevention courses. (ref item 5.21)
(i) Stress Absorbing Membrane (SAM) crack width less than 6 mm sqm 81.04 82.55 84.05
(ii) Stress Absorbing Membrane (SAM) with crack width 6 mm to 9 mm sqm 95.32 97.09 98.85
(iii) Stress Absorbing Membrane (SAM) crack width above 9 mm and cracked area above 50 % sqm 126.78 129.13 131.47
(iv) Bitumen Impregnated Geotextile sqm 160.85 163.83 166.81
C Slurry Seal (ref item 5.15)
(i) 5 mm thickness sqm 82.00 83.48 85.19
(ii) 3 mm thickness sqm 57.40 58.42 59.62
(iii) 1.5 mm thickness sqm 35.51 36.12 36.87
D Surface Dressing for maintance works. (ref item 5.9)
(i) 19 mm nominal chipping size sqm 97.98 99.60 101.63
(ii) 13 mm nominal size chipping sqm 77.85 79.10 80.62
Repair of old Joints Sealant (Removal of existing sealant and re sealing of contraction, longitudinal or
10.10 metre 72.00 74.00 75.00
expansion joints in concrete pavement with fresh sealant material)
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side
10.11 metre 80.00 82.00 83.00
manually)
Land Slide Clearance in soil (Clearance of land slides in soil and ordinary rock by a bull-dozer 175 HP and
10.12 cum 91.00 92.00 94.00
disposal of the same on the valley side)
Land slide Clearance in Hard Rock Requiring Blasting (Clearing of land slide in hard rock requiring blasting
10.13 cum 137.00 140.00 142.00
for 50% of the boulders and disposal of the same on the valley side.)
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
Snow Clearance on Roads with Dozer (Snow clearance from road surface by a bull- dozer 165 Hp and
10.14 cum 6.00 6.00 6.00
disposing it on the valley side)
Snow Clearance on Roads with Snow Blowers (Snow clearance from road surface by a snow blower and
10.15 cum 9.00 9.00 9.00
disposing on the valley side.)
CHAPTER-11
HORTICULTURE
Spreading of Sludge Farm Yard Manure or/and good Earth (Spreading of sludge farm yard manure or/ and
11.1 cum 51.00 52.00 53.00
good earth in required thickness (cost of sludge, farm- yard manure or/and good earth to be paid for
Making Lawns including Ploughing and Dragging with 'Swagha' Breaking of Clod (Making lawns including
11.3 ploughing and breaking of clod, removal of rubbish, dressing and supplying doobs grass roots and planting at sqm 42.00 43.00 44.00
15 cm apart, including supplying and spreading of farm yard manure at rate of 0.18 cum per 100 sqm)
Maintenance of Lawns or Turfing of Slopes (Maintenance of lawns or Turfing of slopes (rough grassing)
11.4 sqm 434.00 442.00 450.00
for a period of one year including watering etc)
Turfing Lawns with Fine Grassing including Ploughing, Dressing (Turfing lawns with fine grassing
11.5 including ploughing, dressing including breaking of clods, removal of rubbish, dressing and supplying doobs sqm 52.00 53.00 54.00
grass roots at 10 cm apart, including supplying and spreading of farm yard manure at rate of0.6 cum per 100
11.6 Maintenance of Lawns with Fine Grassing for the First Year sqm 401.00 408.00 416.00
a) Planting Permanent Hedges including Digging of Trenches (Planting permanent hedges including
11.7 digging of trenches, 60 cm wide and 45 cm deep, refilling the excavated earth mixed with farmyard manure, metre 218.00 222.00 226.00
supplied at the rate of 4.65 cum per 100 metres and supplying and planting hedge plants at 30 cm apart)
(b) Maintenance of Hedge for one year metre 376.00 383.00 390.00
11.8 a) Planting Flowering Plants and Shrubs in Central Verge km 65,386.00 66,596.00 67,807.00
(b) Maintenance of Flowering Plants and Shrubs in Central Verge for one Year km 424,041.00 431,894.00 439,746.00
Planting of Trees and their Maintenance for one Year (Planting of trees by the road side (Avenue trees) in
TPL1 11.9 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, each 1,971.00 2,007.00 2,043.00
planting the saplings, backfilling the trench, watering, fixing the tree guard and maintaining the plants for one
Renovation Lawns including, Weeding, Forking the Ground, Top Dressing with Forked Soil
(Renovation lawns including, weeding, forking the ground, top dressing with forked soil, watering and
11.10 sqm 35.00 35.00 36.00
maintenance the lawns, for 30 days or more, till the grass forms a thick lawn, free from weeds, and fit for
moving and disposal of rubbish as directed, including supplying good earth, if needed but excluding the cost of
Supply at Site Well Decayed Farm Yard Manure (Supply at site of work well decayed farm yard manure,
11.11 from any available source, approved by the engineer in charge including screening and stacking) cum 238.00 242.00 246.00

Supply at Site of Work/ Store - Deoiled Neem Cake (Supply at site of work/ store- deoiled neem cake duly
11.12 quintal 30.00 30.00 31.00
packed in used gunny bags)
11.13 Supplying Sludge (Supplying sludge duly stacked at site/ store) cum 137.00 139.00 142.00
Half Brick Circular Tree Guard, in 2nd class Brick, internal diametre 1.25 metres, and height 1.2 metres,
above ground and 0.20 metre below ground (Half brick circular tree guard, in 2nd class brick, internal
11.14 diametre 1.25 metres, and height 1.2 metres, above ground and 0.20 metre below ground, bottom two each 2,201.00 2,242.00 2,282.00
courses laid dry, and top three courses in cement mortar 1:6 ( 1 cement 6 sand) and the intermediate
courses being in dry honey comb masonry, as per design complete)
Edging with 2nd class Bricks, laid dry lengthwise (Edging with 2nd class bricks, laid dry lengthwise,
11.15 including excavation, refilling, consolidation, with a hand packing and spreading nearly surplus earth metre 43.00 44.00 45.00
within a lead of 50 metres)
Wrought Iron and Mild Steel Welded Work (Wrought iron and mild steel welded work) (using angles,
square bars, tees and channel grills, grating frames, gates and tree guards of any size and design etc.
50.83 11.18 quintal 11,963.00 12,182.00 12,402.00
including cost of screens and welding rods or bolts and nuts complete fixed in position but without the cost of
excavation and concrete for fixing which will be paid separately)
Tree Guard with MS Iron (Providing and fixing MS iron tree guard 60 cm dia and 2 metre high above ground
level formed of 4 Nos (25 x 6 mm) and 8 Nos (25 x 3 mm) vertical MS riveted to 3 Nos (25 x 6 mm) iron rings in each tree
11.19 2,800.00 2,848.00 2,897.00
two halves, bolted together with 8 mm dia and 30 mm long bolts including painting two coats with paint of guard
approved brand over a coat of priming, complete in all respects.)
Compensatory Afforestation (Planting trees as compensatory afforestation at the rate of 290 trees per
hectare at a spacing of 6 m by grubbing and leveling the ground upto a depth of 150 mm, digging holes 0.9 m
11.21 hectare 157,045.00 159,953.00 162,861.00
dia, 1 m deep, mixing farm yard/sludge manure with soil, planting of sapling 2 m high with 25 cm dia stem,
backfilling the hole and watering)
CHAPTER-12
FOUNDATIONS
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical
12.1 specification, including setting out, construction of shoring and bracing, removal of stumps and other
deleterious matter, dressing of sides and bottom and backfilling with approved material.)
I Ordinary soil
A Manual Means
12.03a (i) upto 3 m depth cum 298.89 298.89 298.89
(ii) 3 m to 6 m depth cum 381.40 381.40 381.40
(iii) Above 6 m depth cum 508.53 508.53 508.53
B Mechanical Means
12.04 (i) Depth upto 3 m cum 79.01 79.26 92.18
(ii) Depth 3 m to 6 m cum 86.39 86.59 100.69
(iii) Depth above 6m cum 96.30 96.45 112.14
II Ordinary rock (not requiring blasting)
A Manual Means
(i) Depth upto 3 m cum 423.77 423.77 423.77
B Mechanical Means cum 462.76 475.30 482.59
III Hard rock ( requiring blasting )
A Manual Means cum 486.44 490.46 514.96
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
IV Hard rock ( blasting prohibited )
A Mechanical Means cum 604.13 605.09 619.59
V Marshy soil
(i) upto 3 m depth
A Manual means cum 1,079.80 1,079.80 1,079.80
B Mechanical Means cum 705.06 709.79 755.41
VI Back Filling in Marshy Foundation Pits cum 713.73 713.73 713.73
Filling Annular Space Around Footing in Rock (Lean cement concrete [Link] nominal mix. Rate may be
12.2
taken as per items 13.4.)
12.3 Sand Filling in Foundation Trenches as per Drawing & Technical Specification cum 2,774.30 2,775.70 2,782.37
PCC [Link] in Foundation (Plain cement concrete [Link] nominal mix in foundation with crushed stone
12.4 aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including cum 5,308.31 5,309.99 5,317.99
curing for 14 days.)
Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as
12.5 cum 7,967.87 7,971.47 7,989.33
per drawing and technical specifications
12.6 A Cement mortar1:3 (1cement :3 sand) cum 5,500.80 5,500.80 5,500.80
B Cement mortar1:2 (1cement :2 sand) cum 6,289.45 6,289.45 6,289.45
C Cement mortar1:4 (1cement :4 sand) cum 4,965.32 4,965.32 4,965.32
D Cement mortar1:6 (1cement :6 sand) cum 4,629.53 4,629.53 4,629.53
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical
12.8
specifications
A PCC Grade M15
12.25 Case I With Batching Plant, Transit Mixer and Concrete Pump cum 5,397.60 5,401.86 5,422.24
Case II With Batching Plant, Transit Mixer and Manual placing cum 5,813.51 5,817.75 5,837.97
B PCC Grade M20
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 5,970.48 5,974.73 5,994.95
Case II With Batching Plant, Transit Mixer and Manual placing cum 6,426.98 6,431.27 6,517.80
C RCC Grade M20
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,100.45 6,104.69 6,124.91
Case II With Batching Plant, Transit Mixer and Manual placing cum 6,586.32 6,590.61 6,610.79
D PCC Grade M25
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,434.81 6,439.06 6,459.28
Case II With Batching Plant, Transit Mixer and Manual placing cum 6,891.31 6,895.60 6,915.77
E RCC Grade M25
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,781.90 6,786.14 6,806.36
Case II With Batching Plant, Transit Mixer and Manual placing cum 7,267.77 7,272.06 7,292.24
F PCC Grade M30
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,480.06 6,484.31 6,504.53
Case II With Batching Plant, Transit Mixer and Manual placing cum 6,936.56 6,940.85 6,961.02
G RCC Grade M30
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,920.73 6,924.98 6,945.20
Case II With Batching Plant, Transit Mixer and Manual placing cum 7,406.61 7,410.90 7,431.08
H RCC Grade M35
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 7,172.82 7,177.07 7,197.29
Case II With Batching Plant, Transit Mixer and Manual placing cum 7,658.50 7,662.99 7,683.17
I RCC Grade M40
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 7,703.85 7,708.09 7,728.31
Case II With Batching Plant, Transit Mixer and Manual placing cum 8,189.72 8,194.01 8,214.19
J RCC Grade M45
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 7,931.70 7,935.95 7,956.17
Case II With Batching Plant, Transit Mixer and Manual placing cum 8,417.58 8,421.87 8,442.05
Providing and laying cutting edge of mild steel weighing 40 kg per metre for well foundation complete as
12.10 tonne 132,352.82 132,352.82 132,352.82
per drawing and technical specification.
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical
12.11
specification
A Well curb
(i) RCC M20 Grade
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,803.65 6,803.65 6,803.65
Case II With Batching Plant, Transit Mixer and Manual placing cum 7,278.74 7,278.74 7,278.74
(ii) RCC M25 Grade
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 7,589.94 7,589.94 7,589.94
Case II With Batching Plant, Transit Mixer and Manual placing cum 8,065.02 8,065.02 8,065.02
(iii) RCC M30Grade
17.34 Case I With Batching Plant, Transit Mixer and Concrete Pump cum 7,808.85 7,808.85 7,808.85
Case II With Batching Plant, Transit Mixer and Manual placing cum 8,225.22 8,225.22 8,225.22
(iv) RCC M35 Grade
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 8,041.01 8,041.01 8,041.01
Case II With Batching Plant, Transit Mixer and Manual placing cum 8,516.09 8,516.09 8,516.09
(v) RCC M40Grade
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 8,653.73 8,653.73 8,653.73
Case II With Batching Plant, Transit Mixer and Manual placing cum 9,128.81 9,128.81 9,128.81
B Well steining
(I) PCC M15 Grade
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 5,481.43 5,481.43 5,481.43
Case II With Batching Plant, Transit Mixer and Manual placing cum 5,916.92 5,916.92 5,916.92
(ii) PCC M20 Grade
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,130.29 6,130.29 6,130.29
Case II With Batching Plant, Transit Mixer and Manual placing cum 6,565.79 6,565.79 6,565.79
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
(iii) RCC M20 Grade
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,236.68 6,236.68 6,236.68
Case II With Batching Plant, Transit Mixer and Manual placing cum 6,672.18 6,672.18 6,672.18
(iv) PCC M25 Grade
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,621.41 6,621.41 6,621.41
Case II With Batching Plant, Transit Mixer and Manual placing cum 7,056.91 7,056.91 7,056.91
(v) RCC M25 Grade
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,957.44 6,957.44 6,957.44
Case II With Batching Plant, Transit Mixer and Manual placing cum 7,392.94 7,392.94 7,392.94
(vi) PCC M30 Grade
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,669.27 6,669.27 6,669.27
Case II With Batching Plant, Transit Mixer and Manual placing cum 7,104.77 7,104.77 7,104.77
(vii) RCC M30 Grade
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 7,104.29 7,104.29 7,104.29
Case II With Batching Plant, Transit Mixer and Manual placing cum 7,539.79 7,539.79 7,539.79
(viii) RCC M35 Grade
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 7,370.93 7,370.93 7,370.93
Case II With Batching Plant, Transit Mixer and Manual placing cum 7,806.42 7,806.42 7,806.42
(ix) RCC M40 Grade
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 7,932.58 7,932.58 7,932.58
Case II With Batching Plant, Transit Mixer and Manual placing cum 8,368.08 8,368.08 8,368.08
C Bottom Plug
(i) PCC Grade M20
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 5,875.46 5,875.46 5,875.46
Case II With Batching Plant, Transit Mixer and Manual placing cum 6,328.40 6,328.40 6,328.40
(ii) PCC Grade M25
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,344.25 6,344.25 6,344.25
Case II With Batching Plant, Transit Mixer and Manual placing cum 6,797.20 6,797.20 6,797.20
(iii) PCC Grade M30
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,389.94 6,389.94 6,389.94
Case II With Batching Plant, Transit Mixer and Manual placing cum 6,842.88 6,842.88 6,842.88
(iv) PCC Grade M35
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,968.17 6,968.17 6,968.17
Case II With Batching Plant, Transit Mixer and Manual placing cum 7,421.11 7,421.11 7,421.11
D Intermediate plug
(I) Grade M20 PCC
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 5,596.80 5,596.80 5,596.80
Case II With Batching Plant, Transit Mixer and Manual placing cum 6,027.12 6,027.12 6,027.12
(ii) Grade M25 PCC
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,042.96 6,042.96 6,042.96
Case II With Batching Plant, Transit Mixer and Manual placing cum 6,474.60 6,474.60 6,474.60
(iii) Grade M30 PCC
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,086.52 6,086.52 6,086.52
Case II With Batching Plant, Transit Mixer and Manual placing cum 6,518.16 6,518.16 6,518.16
E Top plug
(i) Grade M15 PCC
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 5,151.96 5,155.92 5,175.72
Case II With Batching Plant, Transit Mixer and Manual placing cum 5,590.20 5,594.16 5,613.96
(ii) Grade M20 PCC
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 5,742.00 5,745.96 5,764.44
Case II With Batching Plant, Transit Mixer and Manual placing 6,180.24 6,184.20 6,267.36
(iii) Grade M25 PCC
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,188.16 6,192.12 6,211.92
Case II With Batching Plant, Transit Mixer and Manual placing cum 6,626.40 6,631.68 6,650.16
(iv) Grade M30 PCC
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,231.72 6,235.68 6,235.68
Case II With Batching Plant, Transit Mixer and Manual placing cum 6,669.96 6,673.92 6,693.72
F Well cap
(i) RCC Grade M20
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,099.73 6,103.96 6,124.18
Case II With Batching Plant, Transit Mixer and Manual placing cum 6,527.57 6,531.81 6,552.03
(ii) RCC Grade M25
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,781.17 6,785.41 6,805.63
Case II With Batching Plant, Transit Mixer and Manual placing cum 7,209.02 7,213.26 7,233.48
(iii) RCC Grade M30
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 6,920.01 6,924.25 6,944.47
Case II With Batching Plant, Transit Mixer and Manual placing cum 7,347.86 7,352.10 7,372.32
(iv) RCC Grade M35
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 7,172.10 7,176.34 7,196.56
Case II With Batching Plant, Transit Mixer and Manual placing cum 7,599.95 7,604.18 7,624.40
(v) RCC M40 Grade cum
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 7,703.12 7,707.36 7,727.58
Case II With Batching Plant, Transit Mixer and Manual placing cum 8,130.97 8,135.21 8,155.43
(vi) RCC M40 Grade cum
Case I With Batching Plant, Transit Mixer and Concrete Pump cum 7,930.98 7,935.22 7,955.44
Case II With Batching Plant, Transit Mixer and Manual placing cum 8,358.83 8,363.07 8,383.29
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
Sinking of 6 m external diameter well ( other than pneumatic method of sinking ) through all types of strata
12.12 namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and
technical specifications. Depth of sinking is reckoned from bed level.
A Sandy soil
(i) Depth below bed level upto 3.0 M metre 5,002.32 5,002.32 5,002.32
(ii) Beyond 3m upto 10m depth metre 6,835.16 6,835.16 6,835.16
(iii) Beyond 10m upto 20m 9,027.40 9,027.40 9,027.40
Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 451.40 451.40 451.40
(iv) Beyond 20m upto 30 m
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 16,932.60 16,932.60 16,932.60
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . 20,319.00 20,319.00 20,319.00
(v) Beyond 30m upto 40 m metre
Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter
a 40,229.50 40,229.50 40,229.50
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . metre 48,275.40 48,275.40 48,275.40
B Clayey soil ( 6m dia. Well )
(i) Depth below bed level upto 3.0 M metre 6,835.16 6,835.16 6,835.16
(ii) Beyond 3m upto 10m depth metre 15,032.29 15,032.29 15,032.29
(iii) Beyond 10 m upto 20 m
Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 19,853.20 19,853.20 19,853.20
b Add for dewatering @ 5% of cost, if required. metre 20,845.90 20,845.90 20,845.90
(iv) Beyond 20m upto 30 m
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 37,240.70 37,240.70 37,240.70
b Add 5% of cost for dewatering of the cost, if required metre 46,550.90 46,550.90 46,550.90
c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). metre 44,688.90 44,688.90 44,688.90
(v) Beyond 30m upto 40 m
Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 88,479.20 88,479.20 88,479.20
b Add 5% of cost for dewatering, if required metre 110,599.20 110,599.00 110,599.00
c Add 20% of cost for Kentledge including supports, loading arrangement and Labour). metre 106,175.20 106,175.00 106,175.00
C Soft rock (6m dia well )
(i) Extra over item no. 12.12 (A) & (B) irrespective of depth for sinking in Soft Rock metre 29,458.22 29,458.22 29,458.22
D Hard rock (6m dia well )
(i) Extra over item no. 12.12 (A) & (B) irrespective of depth for sinking in Soft Rock metre 32,664.02 32,664.02 32,664.02
E Bouldery strata(6m dia well )
(i) Extra over item no. 12.12 (A) & (B) irrespective of depth for sinking in rock bouldery strata metre 24,624.61 24,624.61 24,624.61
Sinking of 7 m external diameter well ( other than pneumatic method of sinking ) through all types of strata
12.13 namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and
technical specifications. Depth of sinking is reckoned from bed level.
A Sandy soil
(i) Depth below bed level upto 3.0 M metre 14,036.62 14,036.62 14,036.62
(ii) Beyond 3m upto 10m depth metre 9,250.24 9,250.24 9,250.24
(iii) Beyond 10m upto 20m 12,216.80 12,216.80 12,216.80
Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 610.80 610.80 610.80
(iv) Beyond 20m upto 30 m
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 22,915.30 22,915.30 22,915.30
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour) . metre 4,583.30 4,583.30 4,583.30
(v) Beyond 30m upto 40 m
Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 54,444.90 54,444.90 54,444.90
b Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. metre 10,888.90 10,888.90 10,888.90
B Clayey soil ( 7m dia. Well )
(I) Depth below bed level upto 3.0 M metre 9,250.24 9,250.24 9,250.24
(ii) Beyond 3m upto 10m depth metre 14,564.74 14,564.74 14,564.74
(iii) Beyond 10 m upto 20 m
Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 19,235.60 19,235.60 19,235.60
b Add for dewatering @ 5% of cost, if required. metre 961.80 961.80 961.80
(iv) Beyond 20m upto 30 m
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 36,079.80 36,079.80 36,079.80
b Add 5% of cost for dewatering on the cost, if required metre 1,804.10 1,804.10 1,804.10
c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). metre 9,020.00 9,020.00 9,020.00
(v) Beyond 30m upto 40 m
Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 85,719.70 85,719.70 85,719.70
b Add 5% of cost for dewatering, if required metre 4,285.90 4,285.90 4,285.90
c Add 20% of cost for Kentledge including supports, loading arrangement and Labour). 97,485.10 97,485.10 97,485.10
C Soft rock (7 m dia well )
(i) Extra over item no. 12.13 (A) & (B) irrespective of depth for sinking in Soft Rock metre 37,656.79 37,656.79 37,656.79
D Hard rock (7 m dia well )
(i) Extra over item no. 12.13(A) & (B) irrespective of depth for sinking in Soft Rock metre 39,812.71 39,812.71 39,812.71
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
E Bouldery strata(7 m dia well )
(i) Extra over item no. 12.13 (A) & (B) irrespective of depth for sinking in rock bouldery strata metre 31,781.65 31,781.65 31,781.65
Sinking of 8 m external diameter well ( other than pneumatic method of sinking ) through all types of strata
12.14 namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and
technical specifications. Depth of sinking is reckoned from bed level.
A Sandy soil
(i) Depth below bed level upto 3.0 M metre 8,667.99 8,667.99 8,667.99
(ii) Beyond 3m upto 10m depth metre 10,536.57 10,536.57 10,537.00
(iii) Beyond 10m upto 20m
Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 13,914.50 13,914.50 13,914.50
(iv) Beyond 20m upto 30 m
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 26,098.60 26,098.60 26,098.60
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . metre 5,219.70 5,219.70 5,219.70
(v) Beyond 30m upto 40 m
Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 62,007.60 62,007.60 62,007.60
b Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. metre 74,409.10 74,409.10 74,409.10
B Clayey soil ( 8m dia. Well )
(i) Depth upto 3.0 M metre 11,305.85 11,305.85 11,305.85
(ii) Beyond 3m upto 10m depth metre 15,643.97 15,643.97 15,643.97
(iii) Beyond 10 m upto 20 m
Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 20,659.60 20,659.60 20,659.60
b Add for dewatering @ 5% of cost, if required. metre 1,032.90 1,032.90 1,032.90
(iv) Beyond 20m upto 30 m
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 38,750.60 38,750.60 38,750.60
b Add 5% of cost for dewatering on the cost, if required metre 1,937.60 1,937.60 1,937.60
c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). metre 9,687.80 9,687.80 9,687.80
(v) Beyond 30m upto 40 m
Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 92,066.40 92,066.40 92,066.40
b Add 5% of cost for dewatering, if required metre 4,603.40 4,603.40 4,603.40
c Add 20% of cost for Kentledge including supports, loading arrangement and Labour). metre 18,413.40 18,413.40 18,413.40
C Soft rock (8 m dia well )
(i) Extra over item no. 12.14 (A) & (B) irrespective of depth for sinking in Soft Rock metre 46,816.78 46,816.78 46,816.78
D Hard rock (8 m dia well )
(i) Extra over item no. 12.14 (A) & (B) irrespective of depth for sinking in Soft Rock metre 45,513.81 45,513.81 45,513.81
E Bouldery strata(8 m dia well )
(i) Extra over item no. 12.14 (A) & (B) irrespective of depth for sinking in rock bouldery strata metre 39,739.86 39,739.86 39,739.86
Sinking of 9 m external diameter well ( other than pneumatic method of sinking ) through all types of strata
12.15 namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and
technical specifications. Depth of sinking is reckoned from bed level.
A Sandy soil
(i) Depth below bed level upto 3.0 M metre 8,890.77 8,890.77 8,890.77
(ii) Beyond 3m upto 10m depth metre 11,564.37 11,564.37 11,564.37
(iii) Beyond 10m upto 20m
Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 15,273.50 15,273.50 15,273.50
(iv) Beyond 20m upto 30 m
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 28,649.29 28,649.29 28,649.29
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . metre 5,729.90 5,729.90 5,729.90
(v) Beyond 30m upto 40 m
Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 68,066.56 68,066.56 68,066.56
b Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. metre 13,613.30 13,613.30 13,613.30
B Clayey soil ( 9m dia. Well )
(i) Depth below bed level upto 3.0 M metre 12,042.53 12,042.53 12,042.53
(ii) Beyond 3m upto 10m depth metre 16,842.02 16,842.02 16,842.02
(iii) Beyond 10 m upto 20 m
Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 22,242.90 22,242.90 22,242.90
b Add for dewatering @ 5% of cost, if required. metre 1,112.20 1,112.20 1,112.20
(iv) Beyond 20m upto 30 m
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 41,723.30 41,723.30 41,723.30
b Add 5% of cost for dewatering on the cost, if required metre 2,086.20 2,086.20 2,086.20
c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). metre 49,205.10 49,205.10 49,205.10
(v) Beyond 30m upto 40 m
Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 99,130.70 99,130.70 99,130.70
b Add 5% of cost for dewatering, if required metre 4,956.60 4,956.60 4,956.60
c Add 20% of cost for Kentledge including supports, loading arrangement and Labour). metre 19,826.10 19,826.10 19,826.10
C Soft rock (9 m dia well )
(i) Extra over item no. 12.15 (A) & (B) irrespective of depth for sinking in Soft Rock metre 56,938.18 56,938.18 56,938.18
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
D Hard rock (9 m dia well )
(i) Extra over item no. 12.15(A) & (B) irrespective of depth for sinking in Soft Rock metre 56,645.47 56,645.47 56,645.47
E Bouldery strata (9 m dia well )
(i) Extra over item no. 12.15 (A) & (B) irrespective of depth for sinking in rock bouldery strata metre 48,499.26 48,499.26 48,499.26
Sinking of 10 m external diameter well ( other than pneumatic method of sinking ) through all types of
12.16 strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing
and technical specifications. Depth of sinking is reckoned from bed level.
A Sandy soil
(i) Depth below bed level upto 3.0 M metre 10,278.05 10,278.05 10,278.05
(ii) Beyond 3m upto 10m depth metre 12,318.93 12,318.93 12,318.93
(iii) Beyond 10m upto 20m
Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 16,269.70 16,269.70 16,269.70
(iv) Beyond 20m upto 30 m
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 30,518.60 30,518.60 30,518.60
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . metre 6,103.80 6,103.80 6,103.80
(v) Beyond 30m upto 40 m
Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 72,509.90 72,509.90 72,509.90
b Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. metre 14,501.90 14,501.90 14,501.90
B Clayey soil (10m dia. Well )
(i) Depth below bed level upto 3.0 M metre 14,053.31 14,053.31 14,053.31
(ii) Beyond 3m upto 10m depth metre 17,338.99 17,338.99 17,338.99
(iii) Beyond 10 m upto 20 m
Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 22,900.00 22,900.00 22,900.00
b Add for dewatering @ 5% of cost, if required. metre 1,145.10 1,145.10 1,145.10
(iv) Beyond 20m upto 30 m
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 42,954.50 42,954.50 42,954.50
'b Add 5% of cost for dewatering on the cost, if required metre 2,147.80 2,147.80 2,147.80
c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). metre 10,738.70 10,738.70 10,738.70
(v) Beyond 30m upto 40 m
Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 102,052.40 102,052.40 102,052.40
b Add 5% of cost for dewatering, if required metre 5,102.60 5,102.60 5,102.60
c Add 20% of cost for Kentledge including supports, loading arrangement and Labour). 20,410.50 20,410.50 20,410.50
C Soft rock (10 m dia well )
(i) Extra over item no. 12.16 (A) & (B) irrespective of depth for sinking in Soft Rock metre 68,021.01 68,021.01 68,021.01
D Hard rock (10 m dia well )
(i) Extra over item no. 12.16 (A) & (B) irrespective of depth for sinking in Soft Rock metre 66,264.80 66,264.80 66,264.80
E Bouldery strata (10 m dia well )
(i) Extra over item no. 12.16 (A) & (B) irrespective of depth for sinking in rock bouldery strata metre 58,059.84 58,059.84 58,059.84
Sinking of 11 m external diameter well ( other than pneumatic method of sinking ) through all types of
12.17 strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing
and technical specifications. Depth of sinking is reckoned from bed level.
A Sandy soil
(i) Depth from bed level upto 3.0 M metre 22,560.83 22,560.83 22,560.83
(ii) Beyond 3m upto 10m depth metre 21,007.64 21,007.64 21,007.64
(iii) Beyond 10m upto 20m
Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 27,745.00 27,745.00 27,745.00
(iv) Beyond 20m upto 30 m
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 52,044.10 52,044.10 52,044.10
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . metre 10,408.90 10,408.90 10,408.90
(v) Beyond 30m upto 40 m
Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 123,648.20 123,648.20 123,648.20
b Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. metre 24,729.70 24,729.70 24,729.70
B Clayey soil (11 m dia. Well )
(i) Depth from bed level upto 3.0 M metre 23,229.41 23,229.41 23,229.41
(ii) Beyond 3m upto 10m depth metre 36,355.14 36,355.14 36,355.14
(iii) Beyond 10 m upto 20 m
Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 48,014.10 48,014.10 48,014.10
b Add for dewatering @ 5% of cost, if required. metre 2,400.80 2,400.80 2,400.80
(iv) Beyond 20m upto 30 m
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 90,064.90 90,064.90 90,064.90
b Add 5% of cost for dewatering on the cost, if required metre 4,503.30 4,503.30 4,503.30
c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). metre 106,215.00 106,215.00 106,215.00
(v) Beyond 30m upto 40 m
Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 213,984.80 213,984.80 213,984.80
b Add 5% of cost for dewatering, if required metre 10,699.30 10,699.30 10,699.30
c Add 20% of cost for Kentledge including supports, loading arrangement and Labour). metre 42,796.80 42,796.80 42,796.80
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
C Soft rock (11 m dia well )
(i) Extra over item no. 12.17(A) & (B) irrespective of depth for sinking in Soft Rock metre 80,065.25 80,065.25 80,065.25
D Hard rock (11 m dia well )
(i) Extra over item no. 12.17 (A) & (B) irrespective of depth for sinking in Soft Rock metre 76,700.75 76,700.75 76,700.75
E Bouldery strata (11 m dia well )
(i) Extra over item no. 12.17 (A) & (B) irrespective of depth for sinking in rock bouldery strata metre 68,421.60 68,421.60 68,421.60
Sinking of 12 m external diameter well ( other than pneumatic method of sinking ) through all types of
12.18 strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing
and technical specifications. Depth of sinking is reckoned from bed level.
A Sandy soil
(i) I) Depth below bed level upto 3.0 M metre 48,407.78 48,407.78 48,407.78
(ii) Beyond 3m upto 10m depth metre 56,405.13 56,405.13 56,405.13
(iii) Beyond 10m upto 20m
Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 74,492.29 74,491.80 74,491.80
(iv) Beyond 20m upto 30 m
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 139,728.00 139,726.40 139,726.40
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . metre 27,945.60 27,945.40 27,945.40
(v) Beyond 30m upto 40 m
Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 331,974.30 331,970.00 331,970.00
b Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. metre 66,394.90 66,394.00 66,394.00
B Clayey soil (12 m dia. Well )
(i) Depth below bed level upto 3.0 M metre 55,845.77 55,845.77 55,845.77
(ii) Beyond 3m upto 10m depth metre 86,133.89 86,133.89 86,133.89
(iii) Beyond 10 m upto 20 m
Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 113,756.00 113,756.00 113,756.00
b Add for dewatering @ 5% of cost, if required. metre 5,687.80 5,687.80 5,687.80
(iv) Beyond 20m upto 30 m
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 213,375.80 213,375.80 213,375.80
b Add 5% of cost for dewatering on the cost, if required metre 10,668.90 10,668.90 10,668.90
c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). metre 53,344.10 53,344.10 53,344.10
(v) Beyond 30m upto 40 m
Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 506,951.50 506,951.50 506,951.50
b Add 5% of cost for dewatering, if required metre 25,347.60 25,347.60 25,347.60
c Add 20% of cost for Kentledge including supports, loading arrangement and Labour). metre 101,390.20 101,390.20 101,390.20
C Soft rock (12 m dia well )
(i) Extra over item no. 12.18 (A) & (B) irrespective of depth for sinking in Soft Rock metre 93,070.91 93,070.91 93,070.91
D Hard rock (12 m dia well )
(i) Extra over item no. 12.18 (A) & (B) irrespective of depth for sinking in Soft Rock metre 87,953.32 87,953.32 87,953.32
E Bouldery strata (12 m dia well )
(i) Extra over item no. 12.18 (A) & (B) irrespective of depth for sinking in rock bouldery strata metre 79,584.54 79,584.54 79,584.54
Sinking of Twin D Type well ( other than pneumatic method of sinking ) through all types of strata namely
12.19 sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical
specifications. Depth of sinking is reckoned from bed level.
A Sandy soil
(i) Depth from bed level upto 3.0 M metre 10,860.30 10,860.30 10,860.30
(ii) Beyond 3m upto 10m depth metre 11,819.86 11,819.86 11,819.86
(iii) Beyond 10m upto 20m
Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 15,610.80 15,610.80 15,610.80
(iv) Beyond 20m upto 30 m
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 29,281.40 29,281.40 29,281.40
b Add 20% of cost for Kentledge including supports, loading arrangement and Labour . metre 5,856.50 5,856.50 5,856.50
(v) Beyond 30m upto 40 m
Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 69,568.80 69,568.80 69,568.80
b Add 20% of cost for Kentledge including supports, loading arrangement, and Labour etc. metre 13,913.70 13,913.70 13,913.70
B Clayey soil (Twin D Type Well )
(i) Depth below bed level upto 3.0 M metre 13,070.34 13,070.34 13,070.34
(ii) Beyond 3m upto 10m depth metre 19,145.91 19,145.91 19,146.00
(iii) Beyond 10 m upto 20 m
Add 5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 25,285.10 25,285.10 25,285.10
b Add for dewatering @ 5% of cost, if required. metre 1,264.20 1,264.20 1,264.20
(iv) Beyond 20m upto 30 m
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 47,428.70 47,428.70 47,428.70
b Add 5% of cost for dewatering on the cost, if required metre 2,371.50 2,371.50 2,371.50
c Add 25% of cost for Kentledge including supports, loading arrangement and Labour ). metre 11,857.20 11,857.20 11,857.20
(v) Beyond 30m upto 40 m
Add 10% for every additional meter depth of sinking over the rate of sinking for the previous meter
a metre 112,686.40 112,686.40 112,686.40
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
b Add 5% of cost for dewatering, if required metre 5,634.30 5,634.30 5,634.30
c Add 20% of cost for Kentledge including supports, loading arrangement and Labour). metre 22,537.30 22,537.30 22,537.30
C Soft rock (Twin D Type well )
(i) Extra over item no. 12.19 (A) & (B) irrespective of depth for sinking in Soft Rock metre 57,340.36 57,340.36 57,340.36
D Hard rock (Twin D Type well )
(i) Extra over item no. 12.19(A) & (B) irrespective of depth for sinking in Soft Rock metre 57,406.91 57,406.91 57,406.91
E Bouldery strata (Twin D Type well )
(i) Extra over item no. 12.19 (A) & (B) irrespective of depth for sinking in rock bouldery strata metre 48,834.40 48,834.40 48,834.40
12.21 Sand filling in wells complete as per drawing and technical specifications cum 3,073.58 3,073.58 3,073.58
Providing steel liner 10 mm thick for curbs and 6mm thick for steining of wells including fabricating and
15.128 12.22 tonne 115,142.56 115,142.56 119,511.85
setting out as per detailed drawing
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical
12.23 specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-750 mm) metre 9,894.07 9,900.67 9,973.52

Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical
12.24 specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1000 metre 13,293.53 13,305.27 13,434.79
mm)
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical
12.25 specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200 metre 17,749.40 17,766.42 17,954.35
mm)
Driven cast-in-place vertical M35 grade R.C.C. pile excluding reinforcement complete as per drawing
12.26 metre 9,894.07 9,900.67 9,973.52
and & Technical Specification (Pile diameter - 750 mm)
Driven cast-in-place vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing
12.27 metre 13,293.53 13,305.27 13,434.79
and & Technical Specification (Pile diameter - 1000 mm)
Driven cast-in-place vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing
15.126 12.28 metre 17,749.40 17,766.42 17,954.35
and & Technical Specification (Pile diameter - 1200 mm)
Driven cast-in-place vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing
12.29 metre 24,772.60 24,799.00 25,090.43
and & Technical Specification (Pile diameter - 1500 mm)
Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and &
12.30 metre 5,950.13 5,950.13 5,950.13
Technical Specification (Pile Diameter=500 mm)
Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and &
12.31 metre 7,912.57 7,912.57 7,912.57
Technical Specification (Pile Diameter=750 mm)
Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and &
12.32 metre 12,417.75 12,417.75 12,417.75
Technical Specification (Pile Diameter=1000 mm)
Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and &
12.33 metre 5,141.92 5,141.92 5,141.92
Technical Specification (Size of pile - 300 mm x 300 mm)
Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and &
12.34 metre 6,342.65 6,342.65 6,342.65
Technical Specification (Size of pile - 500 mm x 500 mm)
Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per drawing and &
12.35 metre 9,755.70 9,755.70 9,755.70
Technical Specification (Size of pile - 750 mm x 750 mm)
Driven vertical steel piles complete as per drawing and & Technical Specification (Section of the pile - H
12.36 metre 9,206.89 9,206.89 9,206.89
Section steel column 400 x 250 mm (ISHB Series) )
Driven vertical steel piles complete as per drawing and & Technical Specification (Section of the pile - H
12.37 metre 10,309.22 10,309.22 10,309.22
Section steel column 450 x 250 mm (ISHB Series) )
12.38 Pile load test on single vertical pile in accordance with IS:2911(Part-IV) 500.00 500.00 500.00
Dismantling of Reinforced Concrete Pile head complete as per Drawing and Technical Specification
12.39 1,509.03 1,550.50 1,579.88
Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical
12.40
Specification
A RCC Grade M20
(i) With Batching Plant, Transit Mixer and Concrete Pump cum 5,865.70 5,865.70 5,865.70
(ii) With Batching Plant, Transit Mixer and Manual placing cum 5,907.33 5,907.33 5,907.33
B RCC Grade M25
(i) With Batching Plant, Transit Mixer and Concrete Pump cum 6,533.19 6,533.19 6,533.19
(ii) With Batching Plant, Transit Mixer and Manual placing cum 6,588.78 6,588.78 6,588.78
C RCC Grade M30
22.61 (i) With Batching Plant, Transit Mixer and Concrete Pump cum 6,672.03 6,672.03 6,672.03
(ii) With Batching Plant, Transit Mixer and Manual placing cum 6,727.62 6,727.62 6,727.62
D RCC Grade M35
(i) With Batching Plant, Transit Mixer and Concrete Pump cum 6,924.12 6,924.12 6,924.12
(ii) With Batching Plant, Transit Mixer and Manual placing cum 6,979.71 6,979.71 6,979.71
E RCC Grade M40
(i) With Batching Plant, Transit Mixer and Concrete Pump cum 7,455.14 7,455.14 7,455.14
(ii) With Batching Plant, Transit Mixer and Manual placing cum 7,510.73 7,510.73 7,510.73
F RCC Grade M45
(i) With Batching Plant, Transit Mixer and Concrete Pump cum 7,683.00 7,683.00 7,683.00
(ii) With Batching Plant, Transit Mixer and Manual placing cum 7,738.59 7,738.59 7,738.59
12.39 Levelling course for Pile cap
(i) With Batching Plant, Transit Mixer and Concrete Pump cum 5,189.99 5,194.10 5,213.69
15.13 (ii) With Batching Plant, Transit Mixer and Manual placing cum 5,632.25 5,636.41 5,655.96
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per
5.16 12.40 tonne 87,360.68 87,416.78 87,521.81
drawing and technical specifications
Supplying, fitting and placing un-coated Mild steel reinforcement complete in foundation as per drawing
12.41 tonne 87,360.68 87,416.78 87,521.81
and technical specification
CHAPTER-13
SUB-STRUCTURE
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing
13.1 cum 7,649.00 7,653.00 7,671.00
and technical specifications
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical specifications
13.2 sqm 110.63 110.63 110.63
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications
13.3 sqm 1,982.00 1,983.00 1,988.00
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical
13.5
specifications
A PCC Grade M15
17.38 (p) Height upto 5m cum 5,709.00 5,714.00 5,735.00
B PCC Grade M20
17.39 (p) Height upto 5m cum 5,827.00 5,832.00 5,853.00
C PCC Grade M25
(p) Height upto 5m
17.40 With Batching Plant, Transit Mixer and Concrete Pump cum 6,858.00 6,862.00 6,884.00
(q) Height 5m to 10m
11.31 With Batching Plant, Transit Mixer and Concrete Pump cum 7,107.00 7,112.00 7,134.00
(r) Height above 10m
With Batching Plant, Transit Mixer and Concrete Pump cum 7,419.00 7,424.00 7,447.00
D PCC Grade M30
(p) Height upto 5m
With Batching Plant, Transit Mixer and Concrete Pump cum 6,906.00 6,910.00 6,932.00
(q) Height 5m to 10m
With Batching Plant, Transit Mixer and Concrete Pump cum 7,157.00 7,162.00 7,184.00
(r) Height above 10m
17.45 With Batching Plant, Transit Mixer and Concrete Pump cum 7,471.00 7,476.00 7,499.00
E RCC Grade M20
(p) Height upto 5m
With Batching Plant, Transit Mixer and Concrete Pump cum 5,941.00 5,945.00 5,967.00
(q) Height 5m to 10m
With Batching Plant, Transit Mixer and Concrete Pump cum 5,953.00 5,958.00 5,980.00
(r) Height above 10m
With Batching Plant, Transit Mixer and Concrete Pump cum 7,033.00 7,038.00 7,061.00
F RCC Grade M25
(p) Height upto 5m
With Batching Plant, Transit Mixer and Concrete Pump cum 7,228.00 7,232.00 7,254.00
(q) Height 5m to 10m
With Batching Plant, Transit Mixer and Concrete Pump cum 7,464.00 7,469.00 7,491.00
(r) Height above 10m
With Batching Plant, Transit Mixer and Concrete Pump cum 6,629.00 6,634.00 6,657.00
G RCC Grade M30
(p) Height upto 5m
With Batching Plant, Transit Mixer and Concrete Pump cum 7,375.00 7,380.00 7,402.00
(q) Height 5m to 10m
With Batching Plant, Transit Mixer and Concrete Pump cum 7,583.00 7,588.00 7,610.00
(r) Height above 10m
With Batching Plant, Transit Mixer and Concrete Pump cum 7,878.00 7,883.00 7,906.00
H RCC Grade M35
(p) Height upto 5m
25.37 With Batching Plant, Transit Mixer and Concrete Pump cum 7,644.00 7,649.00 7,670.00
(q) Height 5m to 10m
17.55 With Batching Plant, Transit Mixer and Concrete Pump cum 7,811.00 7,816.00 7,838.00
(r) Height above 10m
17.42 With Batching Plant, Transit Mixer and Concrete Pump cum 8,061.00 8,066.00 8,089.00
I RCC Grade M40
(p) Height upto 5m
17.62 With Batching Plant, Transit Mixer and Concrete Pump cum 8,210.00 8,215.00 8,236.00
(q) Height 5m to 10m
With Batching Plant, Transit Mixer and Concrete Pump cum 8,389.00 8,394.00 8,416.00
(r) Height above 10m
With Batching Plant, Transit Mixer and Concrete Pump cum 8,658.00 8,663.00 8,685.00
J RCC Grade M45
(p) Height upto 5m
With Batching Plant, Transit Mixer and Concrete Pump cum 8,453.00 8,457.00 8,479.00
(q) Height 5m to 10m
With Batching Plant, Transit Mixer and Concrete Pump cum 8,637.00 8,642.00 8,664.00
(r) Height above 10m
With Batching Plant, Transit Mixer and Concrete Pump cum 8,914.00 8,919.00 8,941.00
K RCC Grade M50
(p) Height upto 5m
With Batching Plant, Transit Mixer and Concrete Pump cum 9,783.00 9,787.00 9,809.00
(q) Height 5m to 10m
With Batching Plant, Transit Mixer and Concrete Pump cum 9,996.00 10,001.00 10,023.00
(r) Height above 10m
With Batching Plant, Transit Mixer and Concrete Pump cum 10,316.00 10,321.00 10,344.00
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and
13.6 tonne 88,251.00 88,307.00 88,413.00
technical specifications
Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and
13.7 tonne 88,251.00 88,307.00 88,413.00
technical specification
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with
13.8 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards each 332.00 332.00 332.00
drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical
13.9
specification
12.70 A Granular material cum 2,589.74 2,589.74 2,589.74
B Sandy material cum 3,586.00 3,586.00 3,586.00
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the
requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600
13.10 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire cum 1,786.61 1,786.61 1,786.61
surface behind abutment, wing wall and return wall to the full height compacted to a firm condition
complete as per drawing and Technical Specification.

Supplying & laying of drainage composite for use behind walls, between two different fills, alongside
drains of road, below concrete lining of canals etc. Geocomposite for planar drainage, realized by
thermobonding a draining core in extruded monofilaments with two filtering nonwoven geotextiles that
may also be working as separation or protecting layers. The draining three dimensional core will have a
“W” configuration as longitudinal parallel channels. Minimum thickness to be 7.2mm, with two filtering
13.11 UV stabilized polypropylene nonwoven geotextile of minimum thickness of 0.75 mm having pores of 150 677.00 677.00 677.00
micron and tensile strength of 8.0 kN/m that will be working as separation or protecting layer,
geocomposite having in plane flow capacity of 2.1 L / (m.s) at hydraulic gradient of 1.0 & 20 kpa
pressure and tensile strength of 18 kN/m , with mass per unit area of 740 gsm, supplied in the form of
roll for easy transportation to site of work as per detailed specification all complete as per directions of
Engineer in charge.
Supplying & laying of drainage composite for use behind walls, between two different fills, alongside
drains of road, below concrete lining of canals etc. having thermobonding a draining core - HDPE
geonet comprises of two sets of parallel overlayed ribs integrally connected to have a rhomboidal shape
with a polyethylene film and a nonwoven geotextile having mass per unit area 130 g/m2 and tensile
strength of 8.0 kN/m that will be working as separation or protecting layer, geocomposite having in
13.12 plane flow capacity of 0.7 L / (m.s) at hydraulic gradient of 1.0 & 20 kPa pressure and tensile strength of 803.76 803.76 803.76
13.5 kN/ m , with mass per unit area of 830 gsm, at easily accessible location including top and bottom,
with all leads and lifts, manpower and machinery, materials, labour etc. complete and as directed by
Engineer - In - Charge.

Supplying, fitting and fixing in position true to line and level cast steel rocker bearing conforming to
tonne
13.13 IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as 5.63 5.63 5.63
capacity
per drawing and Technical Specifications.
Supplying, fitting and fixing in position true to line and level forged steel roller bearing conforming to
tonne
13.14 IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as 5.75 5.75 5.75
capacity
per drawing and Technical Specifications.
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal
piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings,
dust seals, PTFE surface sliding against stainless steel mating surface, completre assembly to be of tonne
13.09 13.18 cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II 274.40 274.40 274.40
capacity
respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH
Specifications complete asper drawing and approved technical specifications.

13.19 Providing structural steel for sub-structure complete as per drawing and technical specifications tonne 187,476.00 182,801.00 182,801.00
CHAPTER-14
SUPER-STRUCTURE
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and
14.1
Technical Specification
A RCC Grade M20
Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure, 20-30% of (a+b+c)
(p) Height upto 5m cum 6,999.00 7,004.00 7,027.00
(q) Height 5m to 10m cum 7,291.00 7,296.00 7,320.00
(r) Height above 10m cum 7,582.00 7,588.00 7,613.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 7,291.00 7,296.00 7,320.00
(q) Height 5m to 10m cum 7,582.00 7,588.00 7,613.00
(r) Height above 10m cum 7,874.00 7,879.00 7,906.00
B RCC Grade M25
Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure, 20-30% of (a+b+c)
14.89 (p) Height upto 5m cum 7,791.00 7,796.00 7,820.00
(q) Height 5m to 10m cum 8,116.00 8,121.00 8,145.00
14.15 (r) Height above 10m cum 8,440.00 8,446.00 8,471.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 8,116.00 8,121.00 8,145.00
(q) Height 5m to 10m cum 8,440.00 8,446.00 8,471.00
(r) Height above 10m cum 8,765.00 8,771.00 8,797.00
C RCC Grade M 30
Using Batching Plant, Transit Mixer and Concrete Pump.
(i) For solid slab super-structure, 20-30% of (a+b+c)
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
(p) Height upto 5m cum 66.00 66.00 67.00
(q) Height 5m to 10m cum 8,284.00 8,289.00 8,314.00
(r) Height above 10m cum 17,179.00 17,190.00 17,241.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 16,568.00 16,578.00 16,628.00
(q) Height 5m to 10m cum 17,231.00 17,242.00 17,293.00
(r) Height above 10m cum 8,947.00 8,952.00 8,979.00
D RCC/PSC Grade M35
Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure, 18-28% of (a+b+c)
17.46 (p) Height upto 5m cum 8,109.00 8,113.00 8,136.00
17.46b (q) Height 5m to 10m cum 8,452.00 8,457.00 8,481.00
17.46d (r) Height above 10m cum 8,796.00 8,801.00 8,826.00
(ii) For T-beam & slab, 23-33% of (a+b+c)
(p) Height upto 5m cum 8,796.00 8,801.00 8,826.00
(q) Height 5m to 10m cum 9,139.00 9,145.00 9,171.00
(r) Height above 10m cum 9,412.00 9,417.00 9,444.00
(iii) For box girder and balanced cantilever, 38-58% of cost of concrete.
(p) Height upto 5m cum 9,412.00 9,417.00 9,444.00
(q) Height 5m to 10m cum 10,094.00 10,100.00 10,128.00
(r) Height above 10m cum 10,776.00 10,782.00 10,813.00
E RCC/PSC Grade M-40
Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure, 18-28% of (a+b+c)
14.90a (p) Height upto 5m cum 8,716.00 8,720.00 8,744.00
14.90b (q) Height 5m to 10m cum 9,085.00 9,090.00 9,114.00
14.90c (r) Height above 10m cum 9,454.00 9,459.00 9,485.00
(ii) For T-beam & slab, 23-33% of (a+b+c) - Cross Girder
14.92a (p) Height upto 5m cum 9,085.00 9,090.00 9,114.00
14.92b (q) Height 5m to 10m cum 9,454.00 9,459.00 9,485.00
1492c (r) Height above 10m cum 9,823.00 9,829.00 9,855.00
(iii) For box girder and balanced cantilever, 38-58% of cost of concrete.
(p) Height upto 5m cum 10,116.00 10,122.00 10,149.00
(q) Height 5m to 10m cum 10,849.00 10,855.00 10,884.00
(r) Height above 10m cum 11,582.00 11,589.00 11,619.00
F RCC/PSC Grade M-45
(i) For solid slab/voided slab super-structure, 16-26% of cost of concrete (a+b+c)
(p) Height upto 5m cum 8,757.00 8,762.00 8,785.00
(q) Height 5m to 10m cum 9,135.00 9,140.00 9,163.00
(r) Height above 10m cum 9,512.00 9,517.00 9,542.00
For I-beam & slab including launching of precast girders by launching truss upto 40 m span, 21-31% of
(ii)
cost of concrete.
(p) Height upto 5m cum 9,135.00 9,140.00 9,163.00
(q) Height 5m to 10m cum 9,512.00 9,517.00 9,542.00
(r) Height above 10m cum 9,890.00 9,895.00 9,921.00
For cast-in-situ box girder, segmental construction and balanced cantilever, 36-56% of cost of
(iii)
concrete.
(p) Height upto 5m cum 10,267.00 10,273.00 10,299.00
(q) Height 5m to 10m cum 11,022.00 11,028.00 11,056.00
(r) Height above 10m cum 11,777.00 11,783.00 11,814.00
G PSC Grade M-50
For cast-in-situ box girder, segmental construction and balanced cantilever, 35-55% of cost of
(i)
concrete
14.92d (p) Height upto 5m cum 11,901.00 11,907.00 11,933.00
14.92f (q) Height 5m to 10m cum 12,783.00 12,789.00 12,817.00
14.92g (r) Height above 10m cum 13,664.00 13,671.00 13,701.00
H PSC Grade M- 55
For cast-in-situ box girder, segmental construction and balanced cantilever, 35-55% of cost of
(i)
concrete
(p) Height upto 5m cum 11,992.00 11,998.00 12,024.00
(q) Height 5m to 10m cum 12,880.00 12,886.00 12,915.00
(r) Height above 10m cum 13,769.00 13,775.00 13,805.00
I PSC Grade M- 60
For cast-in-situ box girder, segmental construction and balanced cantilever, 35-55% of cost of
(i)
concrete
(p) Height upto 5m cum 11,992.00 11,998.00 12,024.00
(q) Height 5m to 10m cum 12,880.00 12,886.00 12,915.00
(r) Height above 10m cum 13,769.00 13,775.00 13,805.00
J PSC Grade M- 65
For cast-in-situ box girder, segmental construction and balanced cantilever, 35-55% of cost of
(i)
concrete
(p) Height upto 5m cum 11,992.00 11,998.00 12,024.00
(q) Height 5m to 10m cum 12,880.00 12,886.00 12,915.00
(r) Height above 10m cum 13,769.00 13,775.00 13,805.00
a) Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing
14.2 tonne 88,479.00 88,536.00 88,641.00
and technical specifications
High tensile steel wires/strands including all accessories for stressing, stressing operations and
14.06 14.3 tonne 241,815.00 241,815.00 241,815.00
grouting complete as per drawing and Technical Specifications
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as
14.4 cum 13,285.00 13,285.00 13,285.00
per drawing and Technical Specifications
Mastic Asphalt (Providing and laying 12 mm thick mastic asphalt wearing course on top of deck slab
excluding prime coat with paving grade bitumen meeting the requirements given in table 500-39, prepared by
using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid
14.5 surface with bitumen precoated fine grained hard stone chipping of 9.5 mm nominal size at the rate of sqm 590.00 590.00 590.00
0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into
surface when the temperature of surfaces not less than 100 deg. C, protruding 1 mm to 4 mm over mastic
surface, all complete as per clause 516.)
Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line
and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between
14.6 metre 2,297.00 2,297.00 2,297.00
vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion,
complete as per approved drawings and technical specifications.
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and
grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical
14.7 metre 2,211.00 2,211.00 2,211.00
post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as
per approved drawings and technical specifications.
Providing, fitting and fixing mild steel railing complete as per drawing and Technical Specification
14.8 metre 4,531.00 4,531.00 4,531.00
14.50 14.9 Drainage Spouts complete as per drawing and Technical specification each 1,631.00 1,631.00 1,631.00
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical
14.10 cum
specification
14.58 (i) With Batching Plant, Transit Mixer and Concrete Pump cum 5,452.00 5,456.00 5,476.00
(ii) With Batching Plant, Transit Mixer and Manual placing cum 5,872.00 5,876.00 5,896.00
Reinforced cement concrete approach slab including reinforcement and formwork complete as per
14.11 cum 11,748.00 11,748.00 11,748.00
drawing and Technical specification

Providing anti-corrosive treatment to HYSD reinforcement with Fusion Bonded Epoxy Coating (FBEC)
14.12 tonne 11,748.00 11,748.00 11,748.00
(To be taken as per the prevailing market rates.)
Precast - pretensioned Girders (Providing, precasting, transportation and placing in position precast
14.60 14.13 cum 36,365.00 41,534.00 46,720.00
pretensioned concrete girders as per drawing and technical specifications)
Crash Barriers (The rate analysis for rigid crash barrier in reinforced cement concrete, semi-rigid crash barrier
14.15 with metal beam and flexible crash barrier with wire ropes have been made and included in chapter-8 on Traffic
and Transportation.)
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered
14.61 14.16 concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 Sqm 87.00 87.00 87.00
litre for 2 Sq.m. )
14.17 Filler joint
Providing & fixing 2 mm thick corrugated copper plate in expansion joint complete as per drawing &
(i) metre 3,460.00 3,460.00 3,460.00
Technical Specification.
Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing &
14.63 (ii) metre 53.00 53.00 53.00
Technical Specification.
Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of
14.33 (iii) simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered metre 540.00 540.00 540.00
with sealant complete as per drawing and technical specifications.
Providing and filling joint sealing compound as per drawings and technical specifications with coarse
(iv) metre 51.00 51.00 51.00
sand and 6% bitumen by weight
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum
horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be
14.68 14.21 metre 12,775.00 12,775.00 12,775.00
installed by the manufacturer/supplier or their authorised representative ensuring compliance to the
manufacturer's instructions for installation.)
Modular Strip / Box Seal Joint (Providing and laying of a modular strip Box steel expansion joint including
anchorage catering to a horizontal movement beyond 70 mm and upto 140mm, complete as per approved
14.22 metre 153,716.00 153,716.00 153,716.00
drawings and standard specifications to be installed by the manufacturer/supplier or their authorised
representative ensuring compliance to the manufacturer's instructions for installation.)
Modular Strip / Box Seal Joint (Providing and laying of a modular strip box seal expansion joint catering to a
horizontal movement beyond 140mm and upto 210mm, complete as per approved drawings and standard
14.23 metre 309,152.00 309,152.00 309,152.00
specifications to be installed by the manufacturer/supplier or their authorised representative ensuring
compliance to the manufacturer's instructions for installation.)
Painting two coats after filling the surface with synthetic enamel paint bridge No. and span arrangements as
6.04g 14.24 per as directed by Engineer. Nos. 248.00 248.00 248.00

14.25 Providing structural steel for super-structure complete as per drawing and technical specifications tonne 185,928.00 185,928.00 185,928.00
CHAPTER-15
RIVER TRAINING AND PROTECTION WORKS
Providing and laying boulders apron on river bed for protection against scour with stone boulders
15.1 weighing not less than 40 kg each complete as per drawing and Technical specification.

14.69 A Boulder laid dry without wire crates. cum 2,257.00 2,257.00 2,257.00
Cement concrete blocks (size 0.5 x 0.5 x 0.5 m) (Providing and laying of apron with cement concrete blocks
14.71 15.3 of size 0.5x0.5x0.5 m cast in-situ and made with nominal mix of M-15 grade cement concrete with a minimum cum 4,024.00 4,024.00 4,024.00
cement content of 250 kg/cum as per IRC: 21-2000.)
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry
15.4 in front of toe of embankment complete as per drawing and Technical specifications

A Stone/Boulder cum 2,257.00 2,257.00 2,257.00


14.72 B Cement Concrete blocks of size 0.3x0.3 x0.3 m cast in cement concrete of Grade M15 cum 3,984.00 3,984.00 3,984.00
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
Providing and laying Filter material underneath pitching in slopes complete as per drawing and
14.74 15.5 cum 2,172.00 2,172.00 2,172.00
Technical specification
Geotextile Filter (Laying of a geotextile filter between pitching and embankment slopes on which pitching is
laid to prevent escape of the embankment material through the voids of the stone pitching/cement concrete
15.6 sqm 284.00 284.00 284.00
blocks as well as to allow free movement of water without creating any uplift head on the pitching.)

Toe protection (A toe wall for toe protection can either be in dry rubble masonry in case of dry rubble pitching
or pitching with stones in wire crates or it can be in PCC M15 nominal mix if cement concrete block have been
15.7 used for pitching . Rates for toe wall can be adopted from respective clauses depending upon approved design.
The rate for excavation for foundation, dry rubble masonry and PCC M15 have been analysed and given in
respective chapters.)
Providing and laying Flooring complete as per drawing and Technical specifications laid over cement
15.8
concrete bedding.
21.38 A Rubble stone laid in cement mortar 1:3 cum 5,353.00 5,353.00 5,353.00
B Cement Concrete blocks Grade M15 cum 5,247.00 5,247.00 5,247.00
15.9 Dry rubble Flooring cum 3,054.00 3,054.00 3,054.00
15.10 Curtain wall complete as per drawing and Technical specification
12.55 B Cement concrete Grade M15 cum 5,398.00 5,398.00 5,398.00
Flexible Apron :Construction of flexible apron 1 m thick comprising of loose stone boulders weighing
14.81 15.11 cum 2,405.00 2,405.00 2,405.00
not less than 40 kg beyond curtain wall.
Laying of a fine aggregate concrete grade M30 filled fabric form for erosion protection of embankments
15.16 (Embankment Erosion Protection using Fine Aggregate Concrete Filled Fabric Form Mattress system) cum 4,606.60 4,606.90 4,776.10

CHAPTER-16
REPAIR AND REHABILITATION
Removal of existing cement concrete wearing coat including its disposal complete as per Technical
specification without causing any detrimental effect to any part of the bridge structure and removal of
16.1 sqm 215.00 215.00 215.00
dismantled material with all lifts and lead upto 1000m (Thickness 75 mm)

Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12
16.2 sqm 157.00 157.00 157.00
mm thick mastic asphalt including disposal with all lift and lead upto 1000m.
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per
16.4 Technical specifications including subsequent cutting/removal and sealing of the hole as necessary of each 286.00 286.00 286.00
nipples after completion of grouting with Cement/Epoxy
Sealing of cracks/porous concrete by injection process through nipples/Grouting complete as per
16.5
Technical specification.
A Cement Grout kg 94.00 94.00 94.00
B Cement mortar (1:1) Grouting kg 277.00 277.00 277.00
Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and
16.6 promoter, available in present formulations, to be applied as per instructions of manufacturer and as sqm 18,312.00 18,312.00 18,312.00
approved by the Engineer.
Removal of defective concrete, cleaning the surface thoroughly, applying the shotcrete mixture
mechanically with compressed air under pressure, comprising of cement, sand, coarse aggregates,
16.9 water and quick setting compound in the proportion as per clause 2807.1., sand and coarse aggregates sqm 630.00 630.00 630.00
conforming to IS: 383 and table 1 of IS: 9012 respectively, water cement ratio ranging from 0.35 to 0.50,
density of gunite not less than 2000 kg/cum, strength not less than 25 Mpa and workmanship
conforming to clause 2807.6.
16.18 Replacement of damaged concrete railing. metre 557.00 557.00 557.00
16.19 Replacement of crash barrier. metre 1,019.00 1,019.00 1,019.00
16.20 Replacement of damaged mild steel railing metre 462.00 462.00 462.00
Repair of crash barrier (Repair of concrete crash barrier with cement concrete of M-30 grade by cutting and
16.21 trimming the damaged portion to a regular shape, cleaning the area to be repaired thoroughly, applying metre 271.00 271.00 271.00
cement concrete after erection of proper form work.)
16.22 Repair of RCC Railing (Carrying out repair of RCC M30 railing to bring it to the original shape.) metre 154.00 154.00 154.00
16.23 Repair of steel Railing (Repair of steel railing to bring it to the original shape) metre 421.00 421.00 421.00
Soil Nailing with fully threaded hot-dip galvanized solid g eotechnical bars as soil nails (galvanization
16.24 minimum 500 grams per sqm) of minimum 25 mm diameter, having yield strength > 670N/mm2 and tensile metre 3,595.00 3,595.00 3,595.00
strength > 800N/mm2
Precasting and Installation of precast concrete arch u nits followed by stage wise filling with selected fill
materials on both side of the arch units. This includes construction of reinforced earth head walls and wing walls
16.25 to provide confinement to the selected fill material, complete as per approved drawings and standard metre 1,059,375.00 1,059,375.00 1,059,375.00
specifications to be precasted, stacked, transported and installed as per the methodology, design and drawings
of system suppliers or their authorised representative ensuring compliance to the system supplier's instruction.

Supply and installation of In-Situ Soil reinforcement with fully threaded hot-dip galvanized solid
geotechnical bars as soil nails (galvanization minimum 500 grams per sqm) of minimum 25 mm diameter,
16.26 having yield strength > 670N/mm2 and tensile strength > 800N/mm2 as per technical specifications and metre 3,653.00 3,653.00 3,653.00
drawings etc. complete including drilling, flushing,grouting, and all Supply and installation of all components
listed as per technical specifications and drawings etc and considering all lead, lift and machinery .

CHAPTER-17
TUNNEL WORK
Excavation for Portal in Ordinary Rock with hydraulic excavator including cutting and loading in
17.1 tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, Cum 533.60
and disposal of excavated materials including all lifts and lead upto 1000 m
Summary of Rate Analysis
Note: This Summary of Rate Analysis is applicable for items available in MORT & H Standard Data Book 2019 as identify in Column A
Rate As Per Proposed Data Book
eSSR 2022-
23 Item Item No. Descriptions Unit for Large for Medium for Small
Reference No. Project Project Project
A B C D E F G
Excavation for Portal in Hard Rock (blasting prohibited) with hydraulic excavator including cutting and
loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross
17.2 Cum 690.80
sections, and and disposal of excavated materials including all lifts and lead upto 1000m

Excavation for portal in soil with hydraulic excavator including cutting and loading in tippers, trimming
17.3 bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and and disposal Cum 85.60
of excavated materials including all lifts and lead upto 1000m
Excavation for tunnel by using drilling & blasting methods in all types of rock including cost of all
materials,machinery, labour, scaling excavated surface, marking, ventilation, lighting, drainage, removing and
17.4 Cum 1,277.10
hauling the excavated muck outside tunnel upto specified dump area and all other ancillary operations etc.

Dewatering in tunnel by pumping out water collected by natural drainage inside tunnel i ncluding
17.5 providing sump wherever necessary, cost of all materials, machinery, labour, drainage and all other ancillary 436.70
operations etc., complete.
Providing , Fitting and Placing of Ribs including Fabrication, Erection, Temporary fixture, Handling of
17.6 material inside fabrication workshop, final matching, field welding and complete as per Drawing and Technical tonne 125,483.10
Specifications.
Shotcreting to upper bench / lower bench with steel fiber reinforced shotcrete (SFRS) , shotcrete
17.7 compressive strength shall be 25 N/mm2 and complete as per Drawing and Technical Specifications. cum 15,327.50

Shotcreting to upper bench / lower bench with welded wiremesh , shotcrete compressive strength shall
17.8 cum 11,766.00
be 25 N/mm2 and complete as per Drawing and Technical Specifications.
Providing and fixing 25 mm diameter 3 meter long steel rock bolts including drilling 45 mm dia holes,
17.9 plate, nuts, cement grout, cost of all materials, machinery, labour, ventilation, lighting, drainage and all other Nos. 2,486.50
ancillary operations etc. complete as per Drawing and Technical Specifications.
Providing and fixing 32 mm diameter 7 meter long steel rock bolts including drilling 51 mm dia holes,
17.10 plate, nuts, cement grout, cost of all materials, machinery, labour, ventilation, lighting, drainage and all other Nos. 6,542.70
ancillary operations etc. complete as per Drawing and Technical Specifications.
Grouting cement slurry in grout holes under specified pressure for consolidation / contact grouting
i ncluding cost of all materials, machinery, labour, redrilling wherever necessary, ventilation,lighting, drainage
17.11 tonne 16,493.80
and other ancillary operations etc. complete as per Drawing and Technical Specifications.

Mass Concrete for Tunnel ( Furnishing and Placing Reinforced cement concrete in Tunnel Work as per
17.12
drawing and Technical Specificatio.)
A RCC Grade M20
(i) With Batching Plant, Transit Mixer and Manual placing Cum 8,143.00
B RCC Grade M25
(i) With Batching Plant, Transit Mixer and Manual placing Cum 9,060.00
C RCC Grade M30
(i) With Batching Plant, Transit Mixer and Manual placing Cum 9,247.00
D RCC Grade M35
(i) With Batching Plant, Transit Mixer and Manual placing Cum 9,586.00
E RCC Grade M40
(i) With Batching Plant, Transit Mixer and Manual placing Cum 10,301.00
F RCC Grade M45
(i) With Batching Plant, Transit Mixer and Manual placing Cum 10,608.00
G RCC Grade M50
(i) With Batching Plant, Transit Mixer and Manual placing Cum 12,288.00
H RCC Grade M55
(i) With Batching Plant, Transit Mixer and Manual placing Cum 12,475.00
I RCC Grade M60
(i) With Batching Plant, Transit Mixer and Manual placing Cum 12,985.00
J RCC Grade M65
(i) With Batching Plant, Transit Mixer and Manual placing Cum 13,083.00
Supplying, fitting and placing HYSD bar reinforcement in Tunnel Work complete as per drawing and
17.13 tonne 88,107.00
technical specifications

CHAPTER-18
ENVIRONMENTAL MANAGEMENT & BIO ENGINEERING
18.1 Construction of bamboo crib wall complete as per drawing and Technical specification. Rm. 510.00

18.2 Construction of Fascines with a bundle of sticks complete as per drawing and Technical specification. Rm. 295.00
Contruction and laying of brush Layers across the slope complete as per drawing and Technical
18.3 Sqm. 220.00
specification.
Construction of vegetative Palisades in Rills using hard wood cutting complete as per drawing and
18.4 Rm. 873.00
Technical specification.
18.5 Laying of Palisades in Slopes complete as per drawing and Technical specification. Sqm. 220.00
Sprinkling of water in the sellement and working area as per instruction of CSC (May to Sept month of
18.6 each year is excluded for any claim by Contructor Sprinkling. Any isolated water sprinkling required shall be Rm. 505.00
carried by Contractor and shall be considered as incidental to the Cotract)