0% found this document useful (0 votes)
46 views7 pages

B2 Sheets

Uploaded by

Roza Rai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views7 pages

B2 Sheets

Uploaded by

Roza Rai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

DASARATH COVERED HALL

B
SPECATTOR ENTRY

B
LOCATION: TRIPURESWHOR , KATHMANDU
FLOOR AREA: 23 M X 34 M. 3 6
PURPOSE: COMMUNITY SPORT COMPLEX 2
PLAYERS ENTRY
7
ARCHITECT: GANGHARDHAR BHATTA, 1 1
4 1 4
BHUBANESHWAR LAL SHRESTHA
BUILT ON: 2030 B.S. SPECATTOR ENTRY 9
CAPACITY: 1000 SPECTATORS + 1
AROUND 50 [Link] 2 5
PLAYERS ENTRY 1
KARATE, KABADDI, BADMINTON 4 4
1
3 3
4 4 3 2 2 4
3
8 7 10 8 1

B
2
1 6 3
2 7
VIP LOBBY 4
3 8
AND ENTRY FIRST FLOOR PLAN
4 9
5 10
GROUND FLOOR PLAN

SHORTCOMINGS
ENTRANCE NOT FOCUED
NO ARCHITECTURAL ACOUSTICS
NOT SUFFIENT PARKING SPACE
▪ SEPARATE ENTRANCES FOR PLAYERS, LACKS TRANSITION SPACES
SPECTATORS AND VIP LIGHTING AND VENTILATION PROBLEM
▪ CAPACITY : 1000 SPECTATORS+50 VIPS NOT UNIVERSAL- ABSENCE OF RAMPS
▪ AREA OF SEATING: 960SQ.M OUTSIDE THE BUILDING
▪ PER PERSON AREA:0.96SQ.M MATERIALS AND STRUCTURE
▪ HARDWOOD BASE FOORING - AS PER GAME
▪ FOUR CORNER STAIRCASES (1.4M WIDE)
FOR EG;VOLLEYBALL- USE OF RUBBER MATS
▪ FOR PLAYERS' ENTRY. HORIZONTAL TRUSS SYSTEM ▪ RCC FRAME WITH TRUSS SYSTEM- 34m SPAN,
▪ EFFICIENT EVACUATION TIME: ~2.4 MIN.
HORIZONTAL TRUSS
▪ -BELOW THE 7-MINUTE STANDARD
EVACUATION TIME (S)=N0. OF SPECTATORS/ RIBBON WINDOWS ▪ CGI SHEETS FOR ROOFING
(STAIRCASE WTH. (M) × 1.25) ▪ HDPE SEATING
LIGHTING AND VENTILATION
▪ POLYCARBONATE SHEETS AND RIBBON WINDOWS
▪ COMPROMISED LIGHTING AND VENTILATION
IN TEAM ROOMS AND CORRIDORS
▪ USE OF CEIING FANS IN VIP AND EXHAUST
FAN BELOW ROOFING
SEATING ARRANGEMENTS
▪ SPECTATOR SEATING ALIGNED ALONG
THE LONGITUDINAL AXIS FOR
>6ft AN OPTIMAL VIEW.
▪ PARAPET DEPTH: 0.8M.
SECTION AT A-A SECTION AT A-A

SURYA FUTSAL
LOCATION: DHUMBARAHI, KATHMANDU
SITE AREA: 1,750sq. m.
ZONE: RESIDENTIAL ZONE
PURPOSE: COMMERCIAL SPORT COMPLEX
90’
N
3
5ft

2
70’

4 10’ • PLAYER SEATING • BADMINTON


• BASKETABALL
1. )FRONT ENTRANCE
2. BACK ENTRANCE 5 10’
’’
15’-8

3. )BADMINTON 6 12 ROA
30 FT

D
4. )BASKETBALL
5. )STORE 11 1
6. )FEMALE CHANGING 7
52’

7. )MALE CHANCING • FUTSAL


8. )SPECTATOR SEATING
9. OFFICEv` 8 10
10. )COUNTER
9
11. )FUTSAL • STORAGE
12. )STAIRS SCHEMATIC PLAN
SECTION
GROUND FLOOR • CAFE

SHORTCOMINGS MATERIALS AND STRUCTURE


▪ INSUFFICIENT WASHROOMS AND CHANGING ROOMS
▪ LIMITED SPECTATOR CAPACITY FLOORING
▪ BADMINTON COURT LACKS PROPER CLEARANCE ▪ USE OF ARTIFICIAL TURF-SILICA INFILL
▪ POTENTIAL CROSS-NOISE DURING SIMULTANEOUS ▪ POLISHED WOODEN FLOORING
USE ▪ POLYVINYL MAT
▪ POOR STORAGE MANAGEMENT ENCLOSURE
▪ INADEQUATE PARKING DRAINAGE ▪ CHAIN LINK FENCE MESH
SUGGESTIONS ▪ ROOF GUTTERS ▪ BRICK, CORRUGATED SHEETS
▪ CONVERT MIDDLE CAFÉ SPACE: UPPER LEVEL FOR ▪ PLINTH RAISED ABOVE INLET ▪ STEEL TRUSS SYSTEM
SPECTATOR SEATING, LOWER FOR CHANGING LIGHTING AND VENTILATION ROOFING
ROOMS ▪ FLOOD LIGHTING ▪ CORRUGATED SHEETS
▪ FOCUS ON TWO SPORTS TO REDUCE MISMANAGE- ▪ METAL MESH FOR LIGHT AND VENTILATION ▪ POLYCARBONATE SHEETS
▪ SUNLIGHT BLOCKED TOWARDS WEST -GOOD
MENT
RATO BANGALASCHOOL
PROJ
ECTI
NFORMATI
ON

LOCATION:PATAN,LALI
TPUR
YEAROFESTABLI SHMENT: 1992AD
TYPE:SPORTSCOMPLEXI NTEGRATEDWI THSCHOOL
CLIMATE:
TEMPERATECLI MATE(HotSumme r
sandMil
dWinte
rs)
;
SI
GNIFICANTMONSOON
ACTIVITIES
BADMINTON, FOOTBALL,BASKETBALL,VOLLEYBALL,
TABLETENNI S

ACCESSI
BILI
TY
-PATANGATE( 300m)
-PROVISI
ONFORPARKI NGAND
PEDESTRI ANMOVEMENT.
-ACCESSIBLEVIAMAI NROADS.
-SPORTSFACILITIESLOCATEDWI THI
N
THECAMPUS.
-SPORTSFACILITIESACCESSI
BLE
FROM ALLTHEACADEMI CBLOCKS.

STRUCTUREAND MATERI
ALS BUBBLEDI
AGRAM
INDOORSPORTSHALL:
SIMPLEHOWETRUSS,
LOADBEARI NGWALLS;
LIGHTWEIGHTCGISHEETSASROOFMATERI
AL,STEEL,
CONCRETE,
BRICKS,
ETC.
ASBUILDI
NGMATERI ALS;

COFFEREDCEI
LINGI
NGYMNASTI
CSHALL.

USEOFDURABLEMATERI ALSSUCHASCONCRETE,ARTI
FICI
ALTURFS, BUI
LDI
NG SERVI
CES
SYNTHETICFLOORINGFORLONGEVI TY.
USEOFSILICASANDI NFI
LLANDTPEI NFI
LLMAKINGFIRSTUSEOF LI
GHTING:HI
GHMOUNTEDLEDFI
XTURESALONG
THESEMATERI ALS. THETRUSS

WATERSUPPLYAND DRAI
NAGE:
COURTSWELLDESI
GNEDTOMANAGE
MONSOONRAIN.

VENTILATI
ON:NATURALVENTILATI
ON,
RIDGEVENTSANDSIDEOPENINGSFOR
FRESHAIR.

I
NFERENCES
SAFETY:FI
RESAFETYEQUI
PMENTS,
-THESTRATEGICUSEOFBUFFERZONESANDLANDSCAPI NGHAS
WELLFENCEDCOURTS.
MITIGATEDSPATI
ALCHALLENGESI NADDITIONTOCREATING
VISUALLYANDACOUSTICALLYSOUNDENVIRONMENT.
-THESPORTSFACI
LITIESRESPONDTOCLIMATICCONDITI
ONS
THROUGHTHEUSEOFSUI TABLEMATERIALS.
.
-THEDESIGNDOESN’TMEETTHESTANDARDSI NTERMSOFCAPACI
TY.
RAVELI
N SPORTSCENTRE
PROJ
ECTI
NFO
LOCATION:PORTSMOUTH,UK
STARTED :AUGUST2019
COMPLETED:SEPTEMBER2022
TOTALAREA:11,
300SQ.
M
ARCHI
TECT:F
AULKNERBROWNS
OWNER:PORTSMOUTH UNI
VERSI
Y

PHOTOVOLTAI
CARRAY
THAT GENERATED 224
MWH ENERGY
AIRSOURCEHEAT
PUMPS

ON TECHNOLOGY
CONSTRUCTI
THE CONSTRUCTI NSPORTS
ON OF THE RAVELI
CENTRE' NVOLVED ERECTI
S ROOFI NG A ROBUST CONCEPT
STEEL FRAMEWORKWI NG TO
TH STEEL DECKI THE RAVELI
N SPORTS CENTRE I
N PORTSMOUTH
ENSURE LOAD DI BUTI
STRI ON.A WATERPROOF IS DESI
GNED TO BEAN OPEN AND
MEMBRANEWAS APPLI ED FOR PROTECTION, TRANSPARENTBUILDING, I
NTEGRATI
NG
FOLLOWED BY THE I ON OF SOLARPANELS
NSTALLATI SEAMLESSLY WITH ITSSURROUNDI
[Link]
FOR ENERGY GENERATION AND A GREENROOF WI TH GROUND LEVEL FEATURES UNI
NTERRUPTED
VEGETATION AND BEEHIVESFORINSULATION. GLAZING,.PROVIDI
NG VIEWS

ARCHI
TECTURAL FEATURES

ROOFLI
GHTABOVE
SWI
MMI
NGPOOL

WARREN TRUSS
FORLOAD
DISTRI
BUTI
ON

BAGUETTESTOAVOI
D
PUBLI
C/PRI
MARY HEATLOSS
1.
ENTRANCE

2.
RECEPTI
ON

3.
PARKI
NG
SEMIPRI
VATE/SECONDARY

5.
SPORTSHALL

6.
SWI
MMI
NGPOOL

7.
GYM+FI
TNESS

8.
STUDI
O CLASS SECTI
ONB-
B
9.
CHANGI
NG+SHOWER

PRI
VATE/TERTI
ARY

9.
ADMI
NISTRATI
ON,
STAFFROOM

10.
TREATMENTROOM

11.
STORAGE

FLOOR PLANS
SECTI
ONA-
A
FI
GURED GROUND -
UNI
VERSI
TYSPORTSAREANA

LOCATION:KARNATAKA,INDI
A
ARCHITECT:THIRDSPACEARCHI
TECTURESTUDIO
FLOORAREA:4500SQ.M
SI
TECONTEXT:WI THINKLETECHNOLOGICAL
UNIVERSI
TYCAMPUS
CAPACITY:1,
300I
NDI
VIDUALS

STRUCTUREAND ROOFI
NG SYSTEM
•THEPYRAMI DALSTEELROOF,PAIREDWI THA
GREENROOFENVELOPI NG THEPERI PHERY,CREATESA
STRIKI
NG CONTRAST, SYMBOLIZING URBANCHAOSWHI LE
PROVIDING SPACEFORSPORTING ACTIVITIESWITHIN.
CONCEPT
•THEZINCCLADDI NG ANDGLASSFACADEOFTHEBUI LDI
NG, QUESTTORECONCILETHEDICHOTOMI
ESOF:
COMPLEMENTEDBYI TSINVI
TING INTERIOR, •ARCHI
TECTUREANDLANDSCAPE
•FIGUREANDGROUND
•CITYANDCAMPUS
UNI
VERSI
TYAREAS

NO.
1

PUBLI
LCENTARNCE

1.
EASTPLAZA 5.
GYM
2.
STORE 6.
WESTPL
AZA
3.
PI
NGPONGCOURT S 7.
WC
4.
BASKETBAL
LCOURT
NO.
4
LANDSCAPE
THEBUILDING'
SLAYOUTCAPI
TALIZESONTHENATURALSLOPEOFTHESI
TE,
INTEGRATI
NG WITHTHELANDSCAPETOCREATEASPACETHATFEELS
GROUNDEDANDI MMERSI
VE.
UNI
VERSI
TYCONNECTI
ON
•THEBUI LDING CONNECTSTOTHECAMPUSTHROUGHTHE
EASTANDWESTPLAZAS, WITHANADDI TIONALENTRANCE SECTI
ON ATAA
UNDERTHEROOFTRUSSTOTHENORTH.
•EXTERNALLY,I
TEXTENDSTHECAMPUS' SURBANSPACE,
INTEGRATI NG PLAZAS,
PATHWAYS, ANDGARDENSTOPROMOTE
COMMUNI TYENGAGEMENTTHECENTRALCOURTSACTASTHE
HEARTOFTHEARENA, HOSTING BOTHSPORTSAND
COMMUNI TYEVENTS. SECTI
ON ATCC
•INTERNALLY,ITFORMSANI NSULARANDFOCUSED
ENVI RONMENTTAI LOREDTOTHEDEMANDSOFCOMPETI TI
VE
SPORTS.
VIRGINIA [Link] SPORTS
CENTRE FOR DISABLED PEOPLE
PROJECT INFO:
GYMNASIUM,FITNESSCLUB,SWIMMING
POOL
LOCATION:`PHOENIX,UNITED STATES
ARCHITECTS:BALDINGER
ARCHITECTURALSTUDIO
AREA:45000FT²
CAPACITY:10,000

STRUCTURE AND ROOFING SYSTEM:

CONCEPT:
[Link]
CENTERISDESIGNEDASANINCLUSIVEFACILITY
PROMOTINGHEALTH,WELLNESS,AND
COMMUNITYENGAGEMENT,WITHASPECIAL
[Link] FOCUSON CCESSIBILITYFORINDIVIDUALSWITH
MODERNSTEEL-FRAMESTRUCTUREWITHEXPANSIVEOPENSPACES DISABILITIES.
[Link]
INCLUDESHIGH-PERFORMANCEMATERIALSWITHSKYLIGHTSFOR
NATURALLIGHTING,PROVIDINGENERGYEFFICIENCYANDA
WELCOMINGATMOSPHERE. BUILDING SERVICES:
EFFICIENTHVAC:ZONED
TEMPERATURE
CONTROL,AIR
PLANNING : FILTRATION,AND
ENERGYEFFICIENCY.
INCLUSIVEDESIGN:THECENTERIS SUSTAINABLEENERGY:
GY
PLANNEDWITHUNIVERSAL SOLARPANELS,LED
ACCESSIBILITY,ENSURINGSPACES
SITEPLAN AREFUNCTIONALANDWELCOMING LIGHTING,ANDENERGY
FORINDIVIDUALSWITHVARYING MANAGEMENT
ABILITIES.
ACCESSIBILITY
FLEXIBLELAYOUT:IT FEATURES:ELEVATORS,
INCORPORATESMULTIPURPOSE ASSISTIVE
ZONESFORFITNESS,SPORTS,AND TECHNOLOGIES,AND
COMMUNITYACTIVITIES, USER-FRIENDLY
FIRSTFLOORPLAN ALLOWINGFORADAPTABLEUSEOF FIXTURES.
SPACES.
INTEGRATIONOFWELLNESS:THE SAFETYSYSTEMS:
PLANNINGEMPHASIZESHEALTH ADVANCEDFIRE
ANDWELLNESSTHROUGHOPEN SAFETY,SECURITY,AND
AREAS,NATURALLIGHT,AND ACCESSIBLE
USER-FRIENDLYFACILITIESTHAT
ENCOURAGEACTIVELIFESTYLES.

SECONDFLOORPLAN
QINGDAO CONSON GYMNASIUM
PROJECT INFO
LOCATION QINGDAO, CHINA
OWNER : QINGDAO CONSON DEVELOPMENT
(GROUP) CO. LTD
CAPACITY :12,500
AREA - 50,000 SQ M (approx)

STRUCTURE AND ROOFING SYSTEM


CONCEPT
THE BUILDING'S DIAMOND-LIKE, FACETED ROOF
STRUCTURE REFLECTS THE DYNAMIC AND VIBRANT
ENERGY OF SPORTS, WHILE SYMBOLIZING MODERNI-
TY AND THE CITY'S COASTAL IDENTITY.

THE QINGDAO CONSON


GYMNASIUM FEA-
TURES ENERGY-EFFI-
CIENT LED LIGHTING,
CUSTOMIZABLE FOR
EVENTS, WITH AD-
VANCED SYSTEMS EN-
SURING BRIGHT, UNI-
FORM ILLUMINATION.
THE QINGDAO CONSON GYMNASIUM'S EYE-CATCHING DIA-
MOND-SHAPED ROOF, WHICH IS COMPOSED OF INTERLOCKING
TRIANGULAR PANELS, REPRESENTS PRECISION AND MODERN-
ISM. THE DESIGN STRIKES A COMPROMISE BETWEEN STRUC- THE QINGDAO
TURAL STRENGTH AND VISUAL ATTRACTIVENESS, AND IT IS CONSON GYMNASIUM
SUPPORTED BY REINFORCED CONCRETE AND STEEL TRUSSES. . FEATURES AD-
VANCED DRAINAGE
SYSTEMS, EFFI-
CIENTLY MANAGING
RAINWATER AND
WASTEWATER, IN-
CORPORATING SUS-
TAINABLE PRACTICES
LIKE RAINWATER
HARVESTING, PRE-
VENTING POOLING,
AND SUPPORTING
ENVIRONMENTAL RE- THE QINGDAO
SPONSIBILITY. CONSON GYMNASIUM
UTILIZES NATURAL
AND MECHANICAL
VENTILATION SYS-
TEMS, ENSURING CON-
SISTENT AIRFLOW,
TEMPERATURE CON-
TROL, AND AIR QUALI-
THE QINGDAO CONSON GYMNASIUM’S ROOF INTEGRATES SMART TY, WITH ENERGY RE-
DRAINAGE SYSTEMS WITHIN ITS TRIANGULAR FACETS, ENSURING COVERY UNITS EN-
EFFICIENT RAINWATER MANAGEMENT. SOLAR-REFLECTIVE COAT- HANCING EFFICIENCY
INGS REDUCE HEAT GAIN, WHILE MODULAR STEEL TRUSSES SIM- AND SUSTAINABILITY.
PLIFY ASSEMBLY.
COMPARATIVE ANALYSIS
CASE CASE CASE CASE CASE CASE
LITERATURE
CONTENT STUDY - I STUDY - II STUDY - III STUDY - IV STUDY - V STUDY - VI INFERENCES
REVIEW (DASRATH COV- (RATO BANGLA (FIGURED GROUND) (QINGDAO SPORTS (VIRGINIA G. (RAVELIN
ERED HAHALL) SCHOOL) CENTRE) PIPER) SPORTS CENTRE)
FLAT LAND
PREFFERABLE, TRIPURESHWOR, PHOENIX, ARIZO- PORTSMOUTH, CASE II DOESN'T
PATAN , TEMPER- KARNATAKA,,25 QINGDAO, CHINA.
FULFILL THE
CONNECTION KATHMANDU, TO 40°C WITH TEMPERATE, SIG- NA, USA. CENTRAL ENGLAND. TEM-
LOCATION, CLIMATE ATE,SIGNIFICANT STANDARD CAPAC-
WITH URBAN HUMID SUBTROPI- SIGNIFICANT NIFICANT SUMMER LOCATION, EASILY PERATE CLIMATE
AND CAPACITY MONSOON ITY
FABRIC, DICTATES CAL ,1050 approx RAINFALL RAINFALL, ACCESSIBLE BY WITH A CAPACITY
OPENINGS AND APPROX 10,000 MAJOR ROADS. OF 5,000 TO 7,000
ORIENTATONS USERS

NORTH-SOUTH ORI- HOT DESERT CLI- SOUTH-EAST ORI- AFFECTED BY


FOCUSES ON
ENTATION, IDEAL NORTH SOUTH NW TO ROAD SE MATE-SUMMERS ENTATION TO OP- THE ROAD ACCESS
EAST WEST MAXIMIZING ABOVE 100°F (37.8°C),
ORIENTATION FOR MAXIMIZING TO CAMPUS TIMIZE SUNLIGHT AND NEIGHBOUR-
NATURAL LIGHT COOLING SYSTEMS
NATURAL LIGHT AND VENTILATION HOOD CONTEXT
AND SHADED AREAS
AND VENTILATION

CHANGING CHANGING ROOMS, CHANGING ROOM, CHANGING ROOM, CHANGING ROOMS, 2,000 USERS DAILY CHANGING ROOMS, BASIC ANCILLARY
ROOMS, SHOWERS, SHOWERS, LOCKER SPORTS EQUIP- SPORTS EQUIP- EQUIPMENT STOR- ACCESSIBILITY SHOWERS, LOCKER FACILITIES WERE
ANCILIARY FACILITES LOCKER ROOMS, ROOMS, RE- MENT STORAGE, MENT STORAGE, AGE, FIRST AID, ROOMS, CAFE, AVAILABLE IN ALL
FOR DISABLED
RESTROOMS, AND STROOMS, AND OF- FIRST AID, ADMIN- GYM,FIRST AID, AD- ADMINISTRATIVE
EVENT SPACE, THE CASES.
OFFICES FICES AVAILABLE ISTRATIVE AND MINISTRATIVE AND OFFICES, MEDIA
LOUNGES.
RETAIL SHOP, AND
COACHES' OFFICE COACHES' OFFICE
CONFERENCE
PYRAMIDAL STEEL
STEEL TRUSS SYS- PREFABRICATED LOAD BEARING ROOF TRUSS STEEL TRUSSES, NORTH-SOUTH RCC, CLT, TRUSS STRUCTURE
TEMS FOR LONG STEEL TRUSS, TRUSS STRUCTURE, STRUCTURE, RCC FOUNDATION, AXIS TO MINIMIZE LONG-SPAN TRUSS
STRUCTURE MATE- FOR STABILITY AND
SPAN- PREFABRI- CONCRETE STEEL, RCC, SYN- STEEL, RCC, SYN- GLASS, SYNTHETIC HEAT GAIN AND AND BEAM SYS-
RIALS AND TECH- ACCOMMODATION
CATED, RCC AND FRAMEWORK, CGI THETIC FLOORING, THETIC FLOORING, FLOORING, AD- MAXIMIZE NATU- TEMS, BIO-SOLAR OF SPORTS FACILI-
NOLOGY STEEL HYBRID SHEETS, POLYCAR- ARTIFICIAL ARTIFICIAL VANCED STRUC- RAL LIGHT PHOTOVOLTAIC TIES
SYSTEMS INNOVA- BONATE SHEETS TURFS,CONCRETE, TURFS,CONCRETE, TURAL MODELING
ASPHALT BASES,Z-
ARRAYS, AND
TIVE MATERIALS ASPHALT BASES
INC CLADDING

SKYLIGHTS AND LIGHTING- POLYCAR- HVAC SYSTEMS, AV SERVICES MET


LIGHTING, VENTILA- LIGHTING, VENTI- LIGHTING, VENTI- LAP POOL, THERAPY
SYSTEMS, RIBBON THROUGH SECOND-
BUILDING TRANSLUCENT, BONATE SHEETS,
TION, WATER SUPPLY LATION, WATER LATION, WATER POOL, GYM, LOCK-
ARY INSTALLATION
RIBBON WINDOW, WINDOWS, ACOUSTICS,
SERVICES ANTURA AND ME- AND DRAINAGE, ELEC- SUPPLY AND SUPPLY, DRAIN- ERS, GROUP ROOMS,
AND LOW-ENERGY AS THE DESIGN FAILS
CHANICAL VENTILA- ACOUSTICS, VENTILA- DRAINAGE, ELEC- AND MULTIPUR-
TRICITY AGE, ELECTRICI- SYSTEMS, GREEN TO MEET THE RE-
TION SYSTEMS TION- EXHAUST FANS TRICITY POSE SPACES.
ROOF QUIREMENTS.

SPORT SPECIFIC/MUL- SPORTS COMPLEX SPORTS COMPLEX MULTI-FUNCTIONAL STEEL FRAME WITH MULTIPURPOSE DIFFERENT CASES
BUILDING TIPURPOSE, COMMU- MULTIPURPOSE
INTEGRATED INTEGRATED SPORTS ARENA\ REINFORCED CON- SPORTS AND REC- REPRESENT DIF-
SPORTS HALL
TYPE AND NITY. COMMERCIAL, WITHIN THE WITHIN THE MODERN, DIA- CRETE, BUILT FOR REATIONAL FERENT TYPES OF
INSTITUTIONAL CAMPUS MOND-SHAPED ARCHI- DURABILITY AND
STYLE SCHOOL
TECTURE
SPORTS COMPLEX.
SAFETY.

WC CAPACITY
RATIO OF 1:50 FOR 1:250- SPECTA- 8/8 FOR 1:10 WITH ADDITION- 1 WC PER 30-50
AL FAMILY-FRIENDLY USERS [Link]
WC RATIOS SPECTATORS AND TORS, 1:3-PLAY- - WOMEN MEN -
FACILITIES. UNKNOWN
1:3 FOR PLAYERS ERS,
DESIGNEDFOR LARGE INSUFFIECIENT, INTEGRATED AMPLE SPACES LIMITED PARKING
UNIVERSITY TO BE SEPARATE
CROWDS, DESIGNATED SPACE WITH DESIG-
INTEGRATED WITH THE WITH EV CHARGING PROVISION FOR ALL
PARKING SPACES FOR ALL,30-40%
WITH THE COM- SCHOOL PARKING PARKING -
AND ACCESSIBLE NATED DISABLED
USER, DEPENDS ON
OF SEATING CAPACITY PARKING AND NEARBY
DROP-OFF ZONES. CAPACITY
PLEX PARKING FACILITIES

You might also like