Definition of Ready (DoR)
Item Description
Clear migration requirements for the Master Table and Exception Table
User Story
to the new production account.
Priority is assigned (Highest), and the task is ready to be included in the
Prioritization
sprint.
Risk and Impact Assessment completed, identifying dependencies for
Automation Profile
automation scripts and connection strings.
Development
Size estimate for the migration work.
Estimate
Estimate of effort required to test the migration and update automation
Testing Estimate
scripts.
A high-level test plan is created, detailing how to verify data integrity
Testing Plan
post-migration and automation updates.
Metrics defined for measuring success, including post-migration system
Metric Plan
stability and automation performance.
Definition of Done (DoD)
Item Description
All acceptance criteria are met and documented, including successful
Acceptance Criteria
migration and automation updates.
Migration scripts and automation code are updated and fully
Code Completion
reviewed.
All testing is complete, with evidence of successful migration and
Testing Complete
correct configuration in production.
Sprint Review The story is reviewed in Sprint Review and approved by the Product
Approval Owner.
Documentation All documentation, including migration steps, testing results, and
Complete updates to automation, is complete and shared.
Git and Pull Request Code changes are versioned and pull requests are merged.
The cloud operation team needs a way to perform deployment of FOCUS powerbi wrt to
change request .Need to implement a way to Implement Powerbi as a code with Azure
devops pipeline to support this initiative
Acceptance criteria
Deployment should be linked with Azure Devops
Automation should support Deployment in all Environment of FOCUS