PEMBINAAN KOLAM TAKUNGAN BANJIR DI TAMAN LINTANG NIBONG, DAERAH BARAT DAYA, PULAU PINANG
DI BAWAH PENANG NATURE-BASED CLIMATE ADAPTATION PROGRAMME (PNBCAP)
BILL NO.7 - HDPE MODULAR TANK WORKS
(All Provisional Quantities except Lump Sum items)
CODE RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
NO. (RM) (RM)
Q100 EXCAVATION
Drain excavation shall be deemed to include
preparation of surfaces, double handling,
disposal of surplus excavated material, upholding
side of excavation, allowance for joints, and
removal of dead services and reinstatement of
Original Surface unless covered by separate
items. All as per drawing no.
JPS/ZHL24/RTB/NIBONG/SK/URS/SP/09 of 23
JPS/ZHL24/RTB/NIBONG/SK/URS/LS/10 of 23
JPS/ZHL24/RTB/NIBONG/SK/URS/CS/11 of 23
JPS/ZHL24/RTB/NIBONG/SK/URS/CS/12 of 23
JPS/ZHL24/RTB/NIBONG/SK/URS/DET/13 of 23
A F121.1 Earth material commencing from original ground m3 3,001
level
Disposal site apporved by the S.O
B F132.1 Slope cutting and trimming to obtain formation level.
Load and transport unsuitable trimmed material to
Contractor's dumping sources m3 1,101
Cut and Disposal
Disposal site approved by the S.O
C F137 Dispose off site the surplus excavation material to m3 3,001
Contractor's own dump site. Contractor to get
approval from relevant authorities for dumps site
F300 FILLING
The following items for filling shall include
compaction, testing and confirmation material
and additional filling necessitated by settlement
or penetration into underlaying material as
applicable. As per drawings no.
JPS/ZHL24/RTB/NIBONG/SK/URS/SP/09 of 23
JPS/ZHL24/RTB/NIBONG/SK/URS/LS/10 of 23
JPS/ZHL24/RTB/NIBONG/SK/URS/CS/11 of 23
JPS/ZHL24/RTB/NIBONG/SK/URS/CS/12 of 23
JPS/ZHL24/RTB/NIBONG/SK/URS/DET/13 of 23
D F314 Other stated material; 300mm thick crusher run
material as Specification m3 450
E F315 300mm Thick aggregate to receive modular tank m3 450
F F324.2 100mm Top soil m3 150
Q200 SURFACE DRAIN
Grass swale as described. As per drawings no.
JPS/ZHL24/RTB/NIBONG/SK/URS/SP/09 of 23
JPS/ZHL24/RTB/NIBONG/SK/URS/LS/10 of 23
JPS/ZHL24/RTB/NIBONG/SK/URS/CS/11 of 23
JPS/ZHL24/RTB/NIBONG/SK/URS/CS/12 of 23
JPS/ZHL24/RTB/NIBONG/SK/URS/DET/13 of 23
G Q280 HDPE Module tank 500mm (W) x 500mm (H) x
500mm (L) with compressive strength 18.35T/m2 nr 11,640
Sand blanket
H Q330 300mm thick sand as drainage blanket as per m3 646
specification
TO COLLECTION
BILL NO.7 / Page 1
PEMBINAAN KOLAM TAKUNGAN BANJIR DI TAMAN LINTANG NIBONG, DAERAH BARAT DAYA, PULAU PINANG
DI BAWAH PENANG NATURE-BASED CLIMATE ADAPTATION PROGRAMME (PNBCAP)
BILL NO.7 - HDPE MODULAR TANK WORKS
(All Provisional Quantities except Lump Sum items)
CODE RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
NO. (RM) (RM)
G500 GROUND TREATMENT
Geotextile
Item for geotextile shall be deemed to include
cost of storage at site with necessary protection
against exposure to direct sun. As per drawings no.
JPS/ZHL24/RTB/NIBONG/SK/URS/DET/13 of 23
A G570.2 Woven geotextile TS20 as described m2 1,500
UV stabilised Non-woven geotextile TS50 nominal
mass 155g/m2 (Tensile Strength 11.5kN/m) strength
B G570.2 as soil reinforcement as per specified m2 1,957
F400 LANDSCAPING
C F410.2 Close turfing to slopes including pegging down with m2 1,727
stakes. All as per drawing no.
JPS/ZHL24/RTB/NIBONG/SK/URS/CS/11 of 23
JPS/ZHL24/RTB/NIBONG/SK/URS/CS/12 of 23
JPS/ZHL24/RTB/NIBONG/SK/URS/DET/13 of 23
NEIGHBOURHOOD PARK SIGNBOARD
50mm Thick lean concrete Grade 15 as bed
D I111.3 For concrete base m2 3
Gade 30
Reinforced concrete
E I142.2 Concrete base m3 0.87
F I142.2 Reinforced concrete Wall m3 2
I500 FORMWORKS
The rates for formwork shall be deemed to
include the projections and intrusion and any
temporary staging required. All as per drawing no.
JPS/ZHL24/RTB/NIBOMG/SK/FBF/07 of 23
G I513.1 F2 : Fair finish to concrete base m2 3
H I513.1 F2 : Fair finish to reinforced concerete wall m2 13
I600 REINFORCEMENT
Rate for reinforcement shall be deemed to
include labour for cutting, bending, and placing.
All as per drawing no.
JPS/ZHL24/RTB/NIBOMG/SK/FBF/07 of 23
Special joints
High tensile steel fabric - BRC A8
J I664 Concrete base m2 2
K I664 Reinforced concrete Wall m2 8
TO COLLECTION
BILL NO.7 / Page 2
PEMBINAAN KOLAM TAKUNGAN BANJIR DI TAMAN LINTANG NIBONG, DAERAH BARAT DAYA, PULAU PINANG
DI BAWAH PENANG NATURE-BASED CLIMATE ADAPTATION PROGRAMME (PNBCAP)
BILL NO.7 - HDPE MODULAR TANK WORKS
(All Provisional Quantities except Lump Sum items)
CODE RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
NO. (RM) (RM)
M700 FINISHES
Wall finishes. All as per drawing no.
JPS/ZHL24/RTB/NIBOMG/SK/FBF/07 of 23
A M732 20mm Thick cement and sand plasteriing to wall m2 16
N200 ALKYD GLOSS PAINT
Prepare and apply (two) coats of base primer and (two)
coats of alkyd gloss paint. All as per drawing no.
JPS/ZHL24/RTB/NIBOMG/SK/FBF/07 of 23
B N261 Surface of member exceeding 300mm grith wall m2 16
E400 STRUCTURES
Metal. All as per drawing no.
JPS/ZHL24/RTB/NIBOMG/SK/FBF/07 of 23
C F410 Existing signboard tp be dismantle properly and
reinstate to the new structure LS
NEW PARK INFORMATION SIGNBOARD
New park infornation signboard as described. All as per
drawing no. JPS/ZHL24/RTB/NIBONG/SK/FBF/07 of 23
I100 IN SITU CONCRETE DESIGN MIX
50mm Thick lean concrete Grade 15 as bed
D I111.3 For pad footing m2 2
Gade 25
Reinforced concrete
E I132.1 Pad footing for new signboard m3 0.30
I500 FORMWORKS
The rates for formwork shall be deemed to
include the projections and intrusion and any
temporary staging required.
Sides
F I511.1 F1 : rought finish to pad footing m2 1
I600 REINFORCEMENT
Rate for reinforcement shall be deemed to
include labour for cutting, bending, and placing.
High tensile bars
Pad footing
G I718 200mm x 200mm x 1550mm Mild steel T-bars m 2
Special joints
High tensile steel fabric - BRC A8
H I664 Pad footing m2 2
TO COLLECTION
BILL NO.7 / Page 3
PEMBINAAN KOLAM TAKUNGAN BANJIR DI TAMAN LINTANG NIBONG, DAERAH BARAT DAYA, PULAU PINANG
DI BAWAH PENANG NATURE-BASED CLIMATE ADAPTATION PROGRAMME (PNBCAP)
BILL NO.7 - HDPE MODULAR TANK WORKS
(All Provisional Quantities except Lump Sum items)
CODE RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
NO. (RM) (RM)
NEW PARK INFORMATION SIGNBOARD (Con't)
New park infornation signboard as described. All as per
drawing no. JPS/ZHL24/RTB/NIBONG/SK/FBF/07 of 23
M700 FINISHES
A M737 To construct, supply and install 1550mm (l) x set 1
670mm (w) x 1245mm (h) x 235mm thk. Park
Signage as described.
B M738 Celuka Lattice Composite (CLC) PVC Foam Board set 1
C M739 Clear Celuka Lattice Composite (CLC) Board set 1
1200mm (l) x 700mm (w) UV tolerence Printed
Artwork. (All artwork to SO. approval before
instalation)
PEDESTRIAN CROSSING
F300 FILLING
The following items for filling shall include
compaction, testing and confirmation material
and additional filling necessitated by settlement
or penetration into underlaying material as
applicable. As per drawings no.
JPS/ZHL24/RTB/NIBONG/SK/URS/SP/09 of 23
JPS/ZHL24/RTB/NIBONG/SK/URS/DET/17 of 23
D F312.4 Using suitable excavated material from stockpile m3 21
area to grading limit as per Specification
Q600 CULVERT
Precast Concrete Pipe Culvert
The rates for pipe culvert shall be deemed to
include pipe culvert Class 'Z', laying or install,
jointing, wrapping, lining, concrete surround and
other associated works up as specification and
S.O's approval. All as per drawing no.
JPS/ZHL24/RTB/NIBONG/SK/URS/SP/09 of 23
JPS/ZHL24/RTB/NIBONG/SK/URS/DET/17 of 23
E Q611 900mm diameter single culvert concrete pipe culvert, nr 48
in standard length
F400 LANDSCAPING
F F410.2 Close turfing to slopes including pegging down with m2 195
stakes. All as per drawing no.
JPS/ZHL24/RTB/NIBONG/SK/URS/DET/17 of 23
G F410.3 UV stablilised high performance turf reinforcement mat m2 146
including J pins as described. All as per drawing no.
JPS/ZHL24/RTB/NIBONG/SK/URS/DET/17 of 23
TO COLLECTION
BILL NO.7 / Page 4
PEMBINAAN KOLAM TAKUNGAN BANJIR DI TAMAN LINTANG NIBONG, DAERAH BARAT DAYA, PULAU PINANG
DI BAWAH PENANG NATURE-BASED CLIMATE ADAPTATION PROGRAMME (PNBCAP)
BILL NO.7 - HDPE MODULAR TANK WORKS
(All Provisional Quantities except Lump Sum items)
CODE RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
NO. (RM) (RM)
COLLECTION
BILL NO.7/1
BILL NO.7/2
BILL NO.7/3
BILL NO.7/4
TO GENERAL SUMMARY
BILL NO.7 / Page 5