PROJECT
PRESENTATION
TABLE OF CONTENT
01 INTRODUCTION
02 OBJECTIVES
03 METHODOLOGY
04 PROJECT TIMELINE
05 BILL OF MATERIALS
06 CONCLUSION
INTRODUCTION
Fused Deposition Modelling (FDM) 3D printing is a technology that has
revolutionized the way we create prototypes and produce small batches of
parts. This technology relies on a process of layer-by-layer deposition of
material, often using a thermoplastic filament, to build up a three-
dimensional object.
In recent years, 3D printing technology has evolved to include multiple
motor systems to increase the accuracy and precision of the final
product.
We focused on the implementation of a two extruder system. The extruder
is responsible for the deposition of the filament across the printing surface.
Utilizing two extruders can achieve greater accuracy and speed during the
printing process. This innovation helps produce complex geometries that
require high levels of precision.
PROJECT OBJECTIVES
Objective 3
Objective 1 Objective 2
To model and fabricate To achieve faster print times, this To produce complex
a 3D Printer having two reduces the overall printing duration, components which cannot
extruders where one is especially when producing multi- be printed using single
used for extruding build material parts. extrusion head and require
material and other for a support system.
support material
METHODOLOGY
Modelling Market Survey Assembly
Material
Testing
Project
Print Test Calibration
Submission
PROJECT TIMELINE
Modelling 01 WEEK 1
02
WEEK 2 WEEK 3
03
WEEK 4 WEEK 5
04
WEEK 6 WEEK 7 WEEK 8
Market Survey
Assembly
Material Testing
Calibrations
Print Test
Project Completion
BILL OF MATERIALS
[Link] DEALER ELECTRONIC COMPONENT QUANTITY COST
FLANGED BALL BEARING 2 178/-
BTT SKR V1.4 1 3135/-
TMC 2208 6 1266/-
RMC 2515 5 PIN 2 30/-
1 AGRAWAL ELECTRONICS RMC 2515 4 PIN 2 30/-
PTFE TUBE 1 80/-
T8 NUTS 4 280/-
T8 LEAD SCREW 2 700/-
NEMA 17 2 900/-
BTT TFT 35 DISPLAY 1 2587/-
CHIMERA HOT END 1 3000/-
HEAT SHRINK 2MM 1 30/-
2 REGAL 3D SYSTEMS COPPER NUT 3 240/-
0.4MM NOZZEL 1 100/-
RIGHT EXTRUDER 1 350/-
40 WATT HEATER 1 200/-
[Link] DEALER ELECTRONIC COMPONENT QUANTITY COST
ALUMINIUM COUPLING 1 194/-
TEMPERATURE SENSOR 1 70/-
3 [Link]
DC FAN 5010 2 300/-
SMPS 1 3700/-
[Link] DEALER HARDWARE COMPONENT QUANTITY COST
PVA FILAMENT (500 GRMS) 1 4200/-
1 WOL 3D ALUMINUM FRAME 1 13000/-
PLA FILAMENT (1 KG) 1 1600/-
SCREWS & NUTS 12 382/-
PVC PIPES 2 100/-
2 KOTHARI FASTNERES END CAP 4 20/-
TUBE (10 ML) 1 120/-
SPRAY PAINT 1 100/-
[Link] DEALER MISCELLANEOUS QUANTITY COST
USB 1 350/-
1 MOVIE PLANET SD CARD 1 450/-
CABLE TIES 1 170/-
1100/-
LASER CUTTING 4
2 MECH INDUSTRY 1100/-
BENDING 4
3 TSIG 3D PRINTS 4 2000/-
CHALLENGES
[Link] Management
2. Costing
3. Availability
4. Time Management
CONCLUSION
Based on the market survey and procurement of
materials for the project, I made sure that all
necessary components are sourced, considering
both cost-efficiency and quality. This approach
lead to smoother assembly, better performance,
and reduced delays during the build process
and successful implementation.