0% found this document useful (0 votes)
51 views9 pages

Signed Bill

Bill

Uploaded by

sumantasamal500
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views9 pages

Signed Bill

Bill

Uploaded by

sumantasamal500
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Bill No.

ECoR/KUR/Civil/2024/0071/B4/R1

Bill Basic Details:


Agreement No. ECoR/KUR/Civil/2024/0071 Agreement Date 17/05/2024 Bill Date 24/12/2024
Department Civil Unit Khurda Road Date of Completion (DoC) 28/02/2025
Name Of Work Extension of existing gate goomties in connection with Automatic block signalling system Name Of Contractor CHITTA RANJAN
in Cuttack-Paradeep section of East Coast Railway. SWAIN-JAJPUR
Divl. Railway Manager -
LOA No. 00875260093832 LOA Date 22/12/2023 Tender Calling Authority
Engg
Is it a Composite Is Measurement & Billing to
Contract ? No be done by Contractor ? No LOA MB Type e-MB
00875260093832/SSE-
Measurement No. Measurement Date From 23/12/2024 Measurement Date To 23/12/2024
WORKS-PRDP/OAM/FL2/04/R1
Bill Preparation Date of Commencement of
Department Civil Tender Accepting Authority CMM/ADRM/Infra Work 04/01/2024
Rate is inclusive of
GST Yes

Signature Not Verified Signature Not Verified


Digitally signed by Chitta Ranjan Digitally signed by SANTOSH
Swain KUMAR SAHOO
Date: 2024.12.24 16:41:50 IST Date: 2024.12.24 17:10:08 IST
Reason: Bill Signing by Contractor Reason: Bill Signing by ADEN-II-
CTC

Page 1 of 9
Item wise Bill Details:
Account of work Executed
Payment on the basis of Actual
Qty. Amount
Qty.
Item Origin Curre execut Since last
Unit/D execut Qty
Sr. No. Base Agreement al nt ed Amount up Amount Bill Total Up to
escrip ed up Upto Remarks
No. (Item Rate(Rs.) Rate(Rs.) Agmt Agmt since to last Since last including Date
tion to last Date
Type) Qty Qty last Bill(Rs.) Bill(Rs.) special Amount(Rs.)
Bill Bill condition(Rs
.)
Schedule D-Execution of NS Item.Notes:-Unless otherwise
specified,the unit rates for the Items of Sch-D shall include the cost of
following. A) All labour and materials, tools and plants, equipments,
machinery etc. B) All lead, lift, ascent, descent etc. C) All handling, rehandling,
loading, unloading, freight, scaffolding, consumable stores
fuels, lubricants, transportation, vehicles, when & where required and
crossing one or more lines if necessary.D)All taxes including GST,
octroi on materials, royalty and all incidental charges complete.
Group Name:- Please see Item Breakup for
details.
468998.0 468998.0
cum 6025.24 6797.073244 69.0 69.0 69.0 0.0 69.0 0.0 0.0 Now to pay 100%
5 5
Brick work with non modular fly ash bricks
- 1 (G) conforming to IS:12894, class designation 10
average compressive strength in foundation
and plinth in: Cement mortar 1:6 (1 cement : 6
coarse sand.
128434.1 128434.1
cum 550.0 620.455 207.0 207.0 207.0 0.0 207.0 0.0 0.0 Now to pay 100%
9 9
- 2 (G) Supplying and filling in plinth with local sand
under floors, including watering, ramming,
consolidating and dressing complete.
Total (Schedule D-Execution of NS Item.Notes:-Unless otherwise
specified,the unit rates for the Items of Sch-D shall include the cost of
following. A) All labour and materials, tools and plants, equipments,
machinery etc. B) All lead, lift, ascent, descent etc. C) All handling, rehandling, 597432.24 0.0 0.0 597432.24
loading, unloading, freight, scaffolding, consumable stores
fuels, lubricants, transportation, vehicles, when & where required and
crossing one or more lines if necessary.D)All taxes including GST,
octroi on materials, royalty and all incidental charges complete.)
Schedule C-Execution of NS Item.Notes:-Unless otherwise
specified,the unit rates for the Items of Sch-C shall include the cost of
following. A) All labour and materials, tools and plants, equipments,
machinery etc. B) All lead, lift, ascent, descent etc. C) All handling, rehandling,
loading, unloading, freight, scaffolding, consumable stores
fuels, lubricants, transportation, vehicles, when & where required and
crossing one or more lines if necessary.D)All taxes including GST,
octroi on materials, royalty and all incidental charges complete.
1 1 (I) Sqm 1322.15 1189.935 667.0 667.0 188.4 269.7 458.2 224219.4 321032.5 321032.5 545252.0 Now to pay 100%
Page 2 of 9
3 9 2 5 6 7 2
Providing and laying Vitrified tiles in floor in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and
conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid on 20 mm thick cement mortar 1:4 (1 cement: 4 coarse
sand) jointing with grey cement slurry @ 3.3 kg/sqm including grouting the joints with white cement and matching pigments etc. The tiles must be cut
with the zero chipping diamond cutter only. Laying of tiles will be done with the notch trowel, plier, wedge, clips of required thickness, leveling system
and rubber mallet for placing the tiles gently and easily.
Double charge vitrified tile polished finish of size
Size of Tile 600mm x 600mm
Total (Schedule C-Execution of NS Item.Notes:-Unless otherwise
specified,the unit rates for the Items of Sch-C shall include the cost of
following. A) All labour and materials, tools and plants, equipments,
machinery etc. B) All lead, lift, ascent, descent etc. C) All handling, rehandling, 224219.45 321032.56 321032.57 545252.02
loading, unloading, freight, scaffolding, consumable stores
fuels, lubricants, transportation, vehicles, when & where required and
crossing one or more lines if necessary.D)All taxes including GST,
octroi on materials, royalty and all incidental charges complete.)
Schedule B-Execution of work covered under item no. 5.22.6, and 5.22A.6 of Chapter 5 of CPWD-2018 .
Chapter Name:- REINFORCED CEMENT CONCRETE
2732 2732 2265 4670. 2732 1659866. 342197.2 342197.2 2002063.
5.22. Kg 83.5 73.27125 Now to pay 100%
- 4.0 4.0 3.72 28 4.0 38 5 6 64
6 (G)
Thermo-Mechanically Treated bars of grade Fe-500D or more.
5.22 4857 4857 2243 2761. 2519 1643992. 202343.6 202343.6 1846335.
Kg 83.5 73.27125 Now to pay 100%
- A.6 6.0 6.0 7.07 57 8.64 17 9 8 85
(G) Thermo-Mechanically Treated bars of grade Fe-500D or more.
Total (Schedule B-Execution of work covered under item no. 5.22.6, and 5.22A.6 of Chapter 5 of CPWD-2018 .) 3303858.55 544540.94 544540.94 3848399.49
Schedule A-Execution of all works covered under Vol. I & Vol.II of
CPWD DSR 2018. except item No.2.27, 5.22.6, and 5.22A.6 .
Chapter Name:- STEEL WORK
2484. 2484.
Kg 106.45 92.6115 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10.13 0 0
- .1 (G)
Fixing with 15x3 mm lugs 10 cm long embedded in cement concrete block 15x10x10 cm of C.C. 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone
aggregate 20 mm nominal size).
Kg 575.45 500.6415 345.0 345.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and
10.28 making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary
- (G) accessories & stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with
suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered
excluding fixing accessories such as nuts, bolts, fasteners etc.).
10.5. Sqm 4278.15 3721.9905 161.0 161.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
- 2 (G) Using flats 30x6mm for diagonal braces and central cross piece
Chapter Name:- FLOORING
11.21 Sqm 1495.0 1300.65 368.0 368.0 6.6 9.78 16.38 8584.29 12720.36 12720.36 21304.65 Now to pay 100%
- .1.1
(G) Acid and alkali resistant tile
11.21 Sqm 1607.7 1398.699 184.0 184.0 7.84 1.43 9.27 10965.8 2000.14 2000.14 12965.94 Now to pay 100%
- .2.1
Acid and alkali resistant tile
Page 3 of 9
(G)
Chapter Name:- FINISHING
3450. 3450. 392.0 290.8 682.8
13.1. Sqm 254.25 221.1975 86711.63 64330.87 64330.87 151042.5 Now to pay 100%
- 0 0 1 3 4
2 (G)
1:6 (1 cement: 6 fine sand)
13.95 108.1 122.0
13.16 Sqm 227.35 197.7945 966.0 966.0 2759.23 21385.54 21385.54 24144.77 Now to pay 100%
- 2 7
.1 (G)
1:3 (1 cement : 3 fine sand)
3450. 3450. 1708. 1741. 3450. 435262.7 443726.5 443726.5 878989.2
13.2. Sqm 292.85 254.7795 Now to pay 100%
- 0 0 39 61 0 5 2 3 8
2 (G)
1:6 (1 cement: 6 fine sand)
4416. 4416. 792.1 792.1
13.26 Sqm 196.7 171.129 0.0 0.0 135554.7 135554.7 135554.7 Now to pay 100%
- 0 0 2 2
(G)
Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete.
133.5015 4416. 4416. 1119. 1618. 2737. 149482.9 216034.8 216034.8 365517.7
13.41 Sqm 153.45 0 0 71 22 93 6 6 Now to pay 100%
- .1 (G)
New work (two or more coats) over and including water thinnable priming coat with cement primer
140.2005 3450. 3450. 750.2 2192. 2942. 105178.4 307371.3 307371.3 412549.7
13.47 Sqm 161.15 0 0 37 57 2 7 7 9 Now to pay 100%
- .1 (G)
New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
201.5 350.4 552.0
13.61 Sqm 121.55 105.7485 552.0 552.0 7 3 21315.73 37057.45 37057.44 58373.17 Now to pay 100%
- .1 (G)
Two or more coats on new work
Chapter Name:- ROAD WORK
702.786 1380.
16.3. 1380.
cum 807.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0
- 10 0 0
(G) Moorum
Sqm 859.35 747.6345 138.0 138.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
16.68 Providing and laying 60mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong
- (G) vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of
coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge.
Chapter Name:- EARTH WORK
cum 219.65 191.0955 276.0 276.0 0.0 55.06 55.06 0.0 10521.72 10521.72 10521.72 Now to pay 100%
2.25
- Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating
(G)
each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
281.793 2760. 2760. 572.9 525.4 1098. 161442.0 148068.1 148068.1 309510.1
cum 323.9 Now to pay 100%
2.25 0 0 1 5 36 3 3 3 6
- A (G) Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of
the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
2.26. cum 90.4 78.648 276.0 276.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
- 1 (G) All kinds of soil

Page 4 of 9
128.0 143.6 271.7
2.6.1 cum 181.85 158.2095 897.0 897.0 20265.05 22728.38 22728.38 42993.43 Now to pay 100%
- 9 6 5
(G)
All kinds of soil
Chapter Name:- PILE WORK
1150. 1150. 1150. 1150. 2388593. 2388593.
20.3. Metre 2387.4 2077.038 0.0 0.0 0.0 Now to pay 100%
- 0 0 0 0 7 7
1 (G)
300 mm dia piles
Chapter Name:- CONCRETE WORK
407519.6
4.1.3 cum 6788.6 5906.082 69.0 69.0 67.51 1.49 69.0 398719.6 8800.06 8800.06 Now to pay 100%
- 6
(G)
1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
56.0 48.84 104.8 298470.9 260309.2 260309.2 558780.1
4.1.6 cum 6126.25 5329.8375 138.0 138.0 Now to pay 100%
- 4 6 6 6
(G)
1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size)
210242.3 137307.3 137307.3 347549.6
4.1.8 cum 5789.6 5036.952 69.0 69.0 41.74 27.26 69.0 Now to pay 100%
- 8 1 1 9
(G)
1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
Chapter Name:- REINFORCED CEMENT CONCRETE
154.4 15.23 169.6 1074678. 105965.0 105965.0 1180643.
5.33. cum 7997.3 6957.651 253.0 253.0 Now to pay 100%
- 6 9 77 2 3 8
1 (G)
All works upto plinth level
129.9 22.59 152.5 1062827. 184757.7 184757.7 1247584.
5.33. cum 9400.85 8178.7395 437.0 437.0 Now to pay 100%
- 5 4 2 3 2 92
2 (G)
All works above plinth level upto floor V level
Quint
5.35 673.3 585.771 207.0 207.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
- al
(G)
Add for using extra cement in the items of design mix over and above the specified cement content therein.
386.3 12.24 398.5
5.9.1 Sqm 284.85 247.8195 529.0 529.0 95737.63 3033.31 3033.31 98770.94 Now to pay 100%
- 2 6
(G)
Foundations, footings, bases of columns, etc. for mass concrete
5.9.1 254.3 23.41 277.7
Metre 173.25 150.7275 506.0 506.0 38337.54 3528.53 3528.53 41866.07 Now to pay 100%
- 6.1 5 6
(G) Under 20 cm wide
5.9.1 Sqm 766.75 667.0725 46.0 46.0 46.0 0.0 46.0 30685.34 0.0 0.0 30685.34 Now to pay 100%
- 9 (G) Weather shade, Chajjas, corbels etc., including edges
507.1 111.0 618.2 305769.7 66976.07 66976.07 372745.8
5.9.3 Sqm 693.05 602.9535 943.0 943.0 Now to pay 100%
- 2 8 8 5
(G)
Suspended floors, roofs, landings, balconies and access platform
480.2835 1380. 1380. 664.5 106.4 770.9 319148.3 51126.18 51126.17 370274.5
5.9.5 Sqm 552.05 Now to pay 100%
- 0 0 5 5 9 6
(G)
Lintels, beams, plinth beams, girders, bressumers and cantilevers

Page 5 of 9
318.6 50.97 369.6 203406.7 32535.12 235941.8
5.9.6 Sqm 733.7 638.319 736.0 736.0 32535.12 Now to pay 100%
- 6 3 3 5
(G)
Columns, Pillars, Piers, Abutments, Posts and Struts
Chapter Name:- MASONRY WORK
216.7 119.6 336.4 1373193. 757761.4 757761.4 2130954.
6.34. cum 7280.7 6334.209 414.0 414.0 Now to pay 100%
- 9 3 2 17 2 2 59
2 (G)
Cement mortar 1:6 (1 cement : 6 Coarse sand)
Chapter Name:- CLADDING WORK
8.2.2. Sqm 4007.65 3486.6555 46.0 46.0 0.0 14.27 14.27 0.0 49754.57 49754.57 49754.57 Now to pay 100%
- 2 (G) Area of slab over 0.50 sqm
Chapter Name:- WOOD AND P.V.C. WORK
159.645 2231. 2231. 2231. 2231.
9.48. Kg 183.5 0.0 356168.0 0.0 0.0 356168.0 Now to pay 100%
- 0 0 0 0
2 (G)
Fixed to openings /wooden frames with rawl plugs screws etc.
Total (Schedule A-Execution of all works covered under Vol. I & Vol.II of 12241301.5
9157947.02 3083354.56 3083354.55
CPWD DSR 2018. except item No.2.27, 5.22.6, and 5.22A.6 .) 7

Page 6 of 9
Schedule Summary:
Cost Breakup(Rs.)
Schedule Amt including Special
Amt Upto last Bill Total upto date Amt
Condition
Schedule D-Execution
of NS Item.Notes:-
Unless otherwise
specified,the unit rates
for the Items of Sch-D
shall include the cost of
following. A) All labour
and materials, tools
and plants,
equipments,
machinery etc. B) All
lead, lift, ascent,
descent etc. C) All
handling, rehandling, 597432.24 0.0 597432.24
loading, unloading,
freight, scaffolding,
consumable stores
fuels, lubricants,
transportation, vehicles,
when & where
required and
crossing one or more
lines if necessary.D)All
taxes including GST,
octroi on materials,
royalty and all
incidental charges
complete.

Page 7 of 9
Schedule C-Execution
of NS Item.Notes:-
Unless otherwise
specified,the unit rates
for the Items of Sch-C
shall include the cost of
following. A) All labour
and materials, tools
and plants,
equipments,
machinery etc. B) All
lead, lift, ascent,
descent etc. C) All
handling, rehandling, 224219.45 321032.57 545252.02
loading, unloading,
freight, scaffolding,
consumable stores
fuels, lubricants,
transportation, vehicles,
when & where
required and
crossing one or more
lines if necessary.D)All
taxes including GST,
octroi on materials,
royalty and all
incidental charges
complete.
Schedule B-Execution
of work covered under
item no. 5.22.6, and 3303858.55 544540.94 3848399.49
5.22A.6 of Chapter 5 of
CPWD-2018 .
Schedule A-Execution
of all works covered
under Vol. I &
Vol.II of 9157947.02 3083354.55 12241301.57
CPWD DSR 2018.
except item No.2.27,
5.22.6, and 5.22A.6 .
Total Amount(Rs.) 13283457.26 3948928.0599999996 17232385.32
Rebate(0.0%) 0.0
Bill Amount (Rs.) (Including Tax (GST)) 3948928.0599999996
Previous Bill details Total
Amt Summary(Rs.) Bill
No.ECoR/KUR/Civil/2024/00 9983373.63 3300083.63 13283457.26
71/B3

Page 8 of 9
Unique Work Id(s) Details:
Work Type Work in IRPSM
Unique Work Id 04.01.16.18.3.007

Page 9 of 9