0% found this document useful (0 votes)
142 views2 pages

Risk Assessment for Waterproofing Activities

Uploaded by

hsem.asak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
142 views2 pages

Risk Assessment for Waterproofing Activities

Uploaded by

hsem.asak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

MAIN CONTRACTOR AL SERH AL KABEER CONSTRUCTION LLC.

FT-HSE-ASAK-006-REV-00
PROJECT NAME/TITLE 6B+G+105+RF Residential Clock Tower, Plot No. 392-198, Marsa, Dubai Date: 04 / 01 / 2025

RISK ASSESSMENT - WATER PROOFING ACTIVITIES


RSK RATING = RISK RATING
S. NO. HAZARD SEVERITY X CONTROL MEASURES TO BE USED AFTER
PROBABILITY CONTROL
 Refer scaffolding RA.
 Do not use make shift devices as access.
 Tie the scaffolding / ladder to the building.
1 Fall hazard while accessing the roof 5 X 2 = 10  Do not carry materials while ascending or descending through ladders. 5X1 = 5
 Inspect scaffolding/ ladder for defects before starting the job (use
checklist).

 Ventilation if it’s a confined space.


2 Inhalation of dust 2X4=8  Use dust masks 2X2=4
 Upwind side

 If the roof edges are open, provide temporary handrails before doing
the job
 If there are any manholes or other openings in the roof, cover them or
3 Falling out of the edges of the roof 5 X 4 = 20 barricade them. 5X1 = 5
 If the work is to be carried out on sloping roof, suitable fall protection
devices have to be designed based on the slope and other field
conditions.
 Use safety belts / harness

 Provide proper edge protection on sides


 Debris must be unloaded through chutes only
 Debris should be removed on daily basis.
 Debris should not be thrown from roof.
4 Injury to persons at ground level 5 X 3 = 15  Barricading / Caution Boards 5X1 = 5
 Use helmet
 Provide cordoning around the landing area.
 When the debris is being removed at the ground level, point of pouring
should be closed.
MAIN CONTRACTOR AL SERH AL KABEER CONSTRUCTION LLC. FT-HSE-ASAK-006-REV-00
PROJECT NAME/TITLE 6B+G+105+RF Residential Clock Tower, Plot No. 392-198, Marsa, Dubai Date: 04 / 01 / 2025

Eye / body injury while pouring  Use eye / face protection.


5 concrete/ breaking 4 X 4 = 16  Use glove, shoe and helmet 4X 1 = 4

 Keep combustible materials away


 Provide fire extinguisher
6 Fire hazard 4 X 4 = 16  Do not leave naked flame unattended 4X2=8
 Shifting of LPG Gas

 Use, PPE like hand gloves, safety shoes, safety goggles


 Use regulator in good condition.
7 Burn injuries due to hot application 4 X 3 = 12  Check condition and connection of hoses. 4X1=4
 Use spark lighter

Assessment carried out by: Severity Probability Risk rating


Negligible 1 Very rare 1 1 – 7 Low
Date: Minor 2 Remote 2 8 – 16 Medium
Reportable 3 Occasional 3 17- 36 High
Remarks, if any: Major 4 Regular 4
Fatality 5 Frequent 5
Multi-fatal 6 Almost certain 6

Legislation:
Risk Assessment completed by: This risk assessment is in compliance
with: Federal Law No8, Year 1980,
PREPARED BY REVIWED BY APPROVED BY and (Tick box):
Engr. Adel Essam Engr. Imran Alam Engr. Median Dubai Municipality Code of
Construction Safety Practices
HSE Engineer HSE Manager Project Director  DM Code of Constructions