0% found this document useful (0 votes)
35 views28 pages

Wind Mill Blade Inspection Report 0127

wind mill cleaning

Uploaded by

sparshmachinery
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views28 pages

Wind Mill Blade Inspection Report 0127

wind mill cleaning

Uploaded by

sparshmachinery
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

INSPECTION REPORT

WIND MILL BLADE 0127

Date: 25-04-2024

Mission name: SPRNG

Flight name: 127 BLADE [1,2]

Flight time: 06:15, 03:26

Drone: Elios 2
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

This page is the cover page for all subsequent pages having the same document number. The revision index and a brief description of the
revision shall be entered on the cover page. The last revision index shall be added to the document number on the cover page and equally
applies to all pages having that document number. The new revision index is shown on all pages.

1 NANDHAKUMAR G 26/04/2024 KRISHNAN M MUTHUKUMAR U 26/04/2024 FIRST ISSUE


2 NANDHAKUMAR G 14/05/2024 KRISHNAN M MUTHUKUMAR U 14/05/2024 SECOND ISSUE

SI SECOND ISSUE
Rev. Name Date Name Name Date Status Kind of Revision
Prepared/Changed by Checked by Released by
Plant: Sprng Renewable Energy Copying of this
Private Limited, Moolanur, document, and
Edakkalpadi, Karur, Tamilnadu - disclosure of it to
users unauthorized
639202
by and the use or
communication of
Unit: Wind Mill the contents
thereof, are
Structures: Blade forbidden without
express written
Component: Internal conditions authority by and
Birds Eye Asset
Solutions Pvt Ltd.
Offenders are liable
to the payment of
Birdseye Asset Solutions (P) Ltd damages. All rights
are reserved in the
event of the grant of
a patent or the
registration of a
utility model or
design
pertaining to this
document
BD [Link]. – [Link]. – Title
No.
Internal
Inspection

Orig Scale
inal
Size N/A

A4
DCC Basis Document Internal Inspection of Blade

DT Work Order No.


/
/

Page 1
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

INDEX

S. No Description Page No
1 Introduction 3
2 Executive Summary 4
3 Observations 5
4 Recommendations 27
5 Summary 27

Page 2
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

1. Introduction

Birdseye Asset Solutions Pvt Ltd a company incorporated in August 2019,


provides drone-based Inspections for asset monitoring in large manufacturing
industries and for complex processes. The founders of the company have in depth
technical expertise in Non-Destructive Evaluation and the support team
comprises highly qualified industrial professionals to young motivated engineers
from premiere institutes.

Within a short span of time, Birdseye Asset Solutions Pvt Ltd has become a
pioneer in the field of confined space inspections. Birdseye Asset Solutions Pvt
Ltd has equipped itself with Elios – 2, the most advanced and technically superior
confined space drone for its air borne inspections.

Elios 2 is the most intuitive, reliable, and precise indoor inspection drone. The
Onsite advantage of the Elios – 2 Drone is that the work force on site is kept out
of harm’s way during operation. Elios 2 performs flawless inspections from its
first flight using its cutting-edge drone data capture technical superiority. Data is
of prime importance when it comes to visual inspections, where in Elios 2 has an
edge over any other inspection methodology. Elios 2 payload has a front cage
opening, equipped with a superior thermal 4k camera. The camera has a 12mp
still and video recording capabilities that produces sharp images to 0.18mm/pix
resolutions which helps in identifying the tiniest of cracks end to end. The perfect
lighting lumens which visualize the image to the needed perfection. Equipped
with dustproof lighting Elios 2 can traverse to dust filled areas to a manageable
extent without losing sight of the objective.

Page 3
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

2. Executive Summary

Sprng Renewable Energy Private Limited, contracted Birdseye Asset Solutions


Pvt Ltd for Drone based Inspection of Blades for the internal Condition Against
work order No. –. As part of the mentioned work order, the Blade was offered for
Visual inspection.

Based on the visual inspection of the Blade internal condition, no major physical
damages were observed on the internal portion.

In lieu of the above observation, detail recommendations have been provided


which can be found in the later sections of the report.

The time duration taken for the flight visual inspection was one day and handled
by four engineers from Birdseye Asset Solutions Pvt Ltd, with guidance from
Sprng Renewable Energy Engineers.

All site safety regulations were complied with, relevant SOP’s and checklist
were followed during the inspection.

Page 4
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

3. Observations
Center portion of the blade:

POI-03

Time of image: 01:42.001


Position (original): Z = 1.47 m, Heading = 4°
Position (local): Z = 1.47 m, Heading = 4°

Glass fibre filament was found.

Page 5
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

POI-04

Time of image: 01:57.716


Position (original): Z = 0.15 m, Heading = 4°
Position (local): Z = 0.15 m, Heading = 4°

Debris was found.

Page 6
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

POI-05

Time of image: 02:02.555


Position (original): Z = 0.62 m, Heading = 4°
Position (local): Z = 0.62 m, Heading = 4°

Glass fibre filament was found.

Page 7
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

POI-06

Time of image: 02:23.976


Position (original): Z = 1.21 m, Heading = 3°
Position (local): Z = 1.21 m, Heading = 3°

Glass fibre filament was found.

Page 8
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

POI-07

Time of image: 02:27.413


Position (original): Z = 0.97 m, Heading = 3°
Position (local): Z = 0.97 m, Heading = 3°

Extra matrix was found in between the joint.

Page 9
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

POI-08

Time of image: 02:41.260


Position (original): Z = 1.52 m, Heading = 360°
Position (local): Z = 1.52 m, Heading = 360°

1 2

Debris was found (1).


Glass fibre filament was found (2).

Page 10
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

POI-11

Time of image: 02:54.135


Position (original): Z = 2.30 m, Heading = 355°
Position (local): Z = 2.30 m, Heading = 355°

Extra matrix was found in between the joint.

Page 11
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

POI-09

Time of image: 03:08.955


Position (original): Z = 1.07 m, Heading = 3°
Position (local): Z = 1.07 m, Heading = 3°

Glass fibre filament was found.

Page 12
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

POI-10

Time of image: 03:12.659


Position (original): Z = 1.80 m, Heading = 1°
Position (local): Z = 1.80 m, Heading = 1°

Debris were found.

Page 13
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

POI-12

Time of image: 03:32.026


Position (original): Z = 1.71 m, Heading = 311°
Position (local): Z = 1.71 m, Heading = 311°

Excess matrix was found in between the joint.

Page 14
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

POI-12

Time of image: 04:10.649


Position (original): Z = 0.28 m, Heading = 180°
Position (local): Z = 0.28 m, Heading = 180°

Glass fibre filament was found.

Page 15
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

Side portion (Trailing edge) of the blade:

POI-03

Time of image: 00:13.040


Position (original): Z = 2.43 m, Heading = 354°
Position (local): Z = 2.43 m, Heading = 354°

Foreign material was observed.

Page 16
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

POI-04

Time of image: 00:34.306


Position (original): Z = 1.94 m, Heading = 354°
Position (local): Z = 1.94 m, Heading = 354°

Foreign material was observed.

Page 17
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

POI-11

Time of image: 01:20.513


Position (original): Z = 2.48 m, Heading = 356°
Position (local): Z = 2.48 m, Heading = 356°

Debris was sticked on the surface.

Page 18
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

POI-12

Time of image: 01:28.922


Position (original): Z = 2.52 m, Heading = 357°
Position (local): Z = 2.52 m, Heading = 357°

Debris was sticked on the surface.

Page 19
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

POI-14

Time of image: 01:37.864


Position (original): Z = 3.44 m, Heading = 2°
Position (local): Z = 3.44 m, Heading = 2°

Debris was sticked on the surface.

Page 20
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

POI-15

Time of image: 01:45.737


Position (original): Z = 4.20 m, Heading = 355°
Position (local): Z = 4.20 m, Heading = 355°

Debris was found.

Page 21
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

POI-16

Time of image: 01:51.914


Position (original): Z = 4.09 m, Heading = 2°
Position (local): Z = 4.09 m, Heading = 2°

Debris was sticked on the surface.

Page 22
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

POI-07

Time of image: 02:02.421


Position (original): Z = 4.10 m, Heading = 4°
Position (local): Z = 4.10 m, Heading = 4°

Matrix was sticked on the surface.

Page 23
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

POI-17

Time of image: 02:05.357


Position (original): Z = 3.99 m, Heading = 358°
Position (local): Z = 3.99 m, Heading = 358°

Debris was sticked on the surface.


A hole was found in the matrix.

Page 24
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

POI-18

Time of image: 02:08.461


Position (original): Z = 3.95 m, Heading = 356°
Position (local): Z = 3.95 m, Heading = 356°

Debris was sticked on the surface.

Page 25
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

POI-08

Time of image: 02:27.915


Position (original): Z = 4.24 m, Heading = 350°
Position (local): Z = 4.24 m, Heading = 350°

Matrix was sticked on the surface.

Page 26
DATE: 25-04-2024 REPORT ID: SPRNG-01
CUSTOMER: SPRNG RENEWABLE ASSET: BLADE
ENERGY PRIVATE LIMITED
SITE: MOOLANUR, EDAKKALPADI, FLIGHT: 127 BLADE
KARUR, TAMILNADU – 639202. FLIGHT NO: 1, 2
OPERATOR: KRISHNAN M INSPECTOR: MUTHUKUMAR U

4. Recommendations
• No major abnormalities were observed in the 127 Blade. So, no
recommendations needed.

5. Summary
Based on the visual inspection carried out for the blade has,

• No major anomalies were found in the glass Fibre and its joints.
• The excess of matrix mixture was observed at 32m from the root.
• Matrix was sticked on the surface.
• Debris was sticked on the surface.
• A hole was found in the matrix.
• Glass fibre filament was found.
• Foreign material was observed.