3000 TPD Project Machinery Usage Report

The document outlines various sheets related to the 3000 TPD Project, including hired machinery daily working hours, gas oil consumption, and daily attendance reports for construction workers. It includes sections for recording equipment usage, contractor details, and approvals from supervisors. Additionally, it contains templates for tracking daily operations and costs associated with machinery and labor on the project site.

Uploaded by

Haftamu Tekle
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
92 views9 pages

3000 TPD Project Machinery Usage Report

The document outlines various sheets related to the 3000 TPD Project, including hired machinery daily working hours, gas oil consumption, and daily attendance reports for construction workers. It includes sections for recording equipment usage, contractor details, and approvals from supervisors. Additionally, it contains templates for tracking daily operations and costs associated with machinery and labor on the project site.

Uploaded by

Haftamu Tekle
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

3000 TPD Project

Hired Machineries Daily Working Hours and Gas oil Consumption Sheet
Equipment Type: ______________Plate No. _____________ Month. ______________________
Name of contractor_____________________________________________

Mornging Afternoon Gas Oil Signiture


S/No Date Start Stop Start Stop Total Hrs Consumed Timekeeper Operator Engineer
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Prepared By Cheecked By Approved By
_____________________________ ___________________________________ ________________________________
5175

220,800.00
54,337.50
275,137.50

6075
73600 45.29
375,000.00
448,600.00 56,250.00
67,290.00 431,250.00
515,890.00
PPP (70/30) Project Leghare Site
Hired Machineries Daily Working Hours Sheet

Morning Afternoon Total Break Down Reason For Sgn.


S/No. Equipment Type Date Start time Stopped time Start time Stopped time hours hours Stopage Time Keeper Operator
1
2
3
4

Prepared By. Checked By. Approved By


Name. ________________________________ Name. ________________________________ Name. ____________________________
Signiture. _____________________________ Signiture. _____________________________
Signiture. __________________________
PPP (70/30) Project Leghare Site
Hired Machineries Daily Working Hours Sheet

Morning Afternoon Total Break Down Reason For Sgn.


S/No. Equipment Type Date Start time Stopped time Start time Stopped time hours hours Stopage Time Keeper Operator
1
2
3
4

Prepared By. Checked By. Approved By


Name. ________________________________ Name. ________________________________
Name. ____________________________
3000 TPD Project
Hired Machineries For Civil Con. Monthly Running Hr
Monthly Run Hr
Date

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Total hr
Rent /hr
Total Cost
National Cement Sc. 3000 TPD Project
Miscelanouse Constructions Daily Attendance Report.
Project Block: ________________________________________
Supervising Forman: _____________________________________ Engineer in Charge:____________________________________

Daily 5/11/2010 6/11/2010 7/11/2010 8/11/2010 9/11/2010 10/11/2010 11/11/2010


[Link]. Name Job
wage M AN M AN M AN M AN M AN M AN M AN
National Cement Sc. 3000 TPD Project
Miscelanouse Constructions Daily Attendance Report.
Project Block: ________________________________________
Supervising Forman: _____________________________________

Daily 12/11/2010 13/11/2010 14/11/2010 15/11/2010 16/11/2010 17/11/2010 18/11/2010


[Link]. Name Job
wage M AN M AN M AN M AN M AN M AN M AN
National Cement Sc. 3000 TPD Project
Miscelanouse Constructions Daily Attendance Report.
Project Block: ________________________________________
Supervising Forman: _____________________________________

Daily 19/11/2010 20/11/2010 21/11/2010 22/11/2010 23/11/2010 24/11/2010 25/11/2010


[Link]. Name Job
wage M AN M AN M AN M AN M AN M AN M AN