Constro Skills Training Institute Pvt Ltd Pune
Project Management by using MS Project software (MSP)
Why MS Project?
MS Project is fundamental to ensure the success of project planning and execution. Through
its application, managers can manage resources, evaluate budgets, create schedules,
measure performance, analyze opportunities and assess risks.
What are the unique features of the training?
Hands-on training with real cases to develop the dynamic schedule model for effective project
decision making
Who can participate?
Under/post Graduate Students, Diploma, Execution Engineers, Planning Engineers, Project
Coordinators, Project Managers, Program Managers
What are the benefits?
After completion of this course, learners will able to define the scope of the project, define
the planning strategy, prepare the execution plan, define Work Breakdown Structure, Identify
the project activities, prepare the network diagram, Estimate resources to complete the
activities, estimate the duration of activities, develop the schedule, develop the project cash
flow, monitoring and controlling of the project, perform the delay analysis, perform the what
is analysis, generate the reports and dashboards of project by using MS Project tool.
How the evaluation done?
Before the course begins, the participants will evaluate himself/herself against the skills sets
required to become the planning engineer. There will be continuous assessment through
live case study and evaluation will be done to verify the development of skills.
MS Project Duration?
The average duration of MS Project training is 30 hours. Participants needs to practice on
software to become experts.
Course Contents of MS Project Training
Main Topic Sub Topic Duration
(Hrs)
1. Introduction to Project & 1.1 Project Management and Construction 1.5
Construction Management management basics
1.2 Project Management process Groups
1.3 Project Management knowledge areas
1.4 Strategy to develop schedule
1.5 Schedule Model and outputs
1.6 Project Constraints
1.7 Project Risks
Constro Skills Training Institute Pvt Ltd Pune
2. Develop Work 2.1 Define the scope of the project 1.5
Breakdown Structure 2.2 What is WBS and why it is required?
(WBS) in MS Project 2.3 Rules to define the WBS
application 2.4 MS project user interface, Set and assign
calendar, Define WBS code, outline number
2.5 Format WBS summary in activity table and
Gantt chart
3. Identify tasks and 3.1 Scheduling Manually or Automatically 5
develop network diagram 3.2 Define activities for each work package
3.3 Types of relationships and types of
dependencies
3.4 Create network diagram of the project
4. Estimate activity duration 4.1 Tools and techniques to estimate activity 6
and resources Duration
4.2 Add resources to resource sheet, define
types of resources
4.3 Assign resources to activities and summary
tasks
4.4 Task types
4.5 Use of resource usage and graphs
5. Develop Project 5.1 Network compression techniques by fast 7
Schedule tracking and crashing
5.2 Resource optimization by Resource
smoothing and resource levelling
5.3 Determine critical and near critical path
5.4 Perform What-if scenario analysis,
constraints
5.5 Display Schedule on Timelines.
5.6 Determine project estimate and cash flow
6. Monitoring and 6.1 Set project baseline/s 7
controlling 6.2 Setting Additional Baselines
6.3 Adding New Tasks to a Baseline
6.4 Viewing baseline and current values in a
Gantt Chart view
6.5 Update task
6.6 Updates resources
6.7 Percent complete, unit % complete &
Physical & complete
6.8 Earned value Analysis
6.9 Analyzing an Earned Value Graph
6.10 Controlling How Project Calculates Earned
Value
7. Customization and 7.1 Custom activity and resources 2
project Reports 7.2 Indicators
7.3 Generating Graphical Reports
7.4 Printing Views to Report Project Information
Constro Skills Training Institute Pvt Ltd Pune
7.5 Reporting Performance
After completion of the MS Project training, the participants will acquire following skills.
1) Define Project Scope
2) Create WBS
3) Identify Project Activities
4) Create Network Diagram
5) Estimate Resources for Activities
6) Estimate Activity Duration
7) Determine Critical Path
8) Develop Project Schedule
9) Estimate Activity Project Cost
10) Develop Project Cash Flow
11) Define Performance Measure Baseline
12) Monitoring and Controlling of Project Scope, Schedule, Cost
13) Delay Analysis
14) Project Risk Management
15) Resource Management
16) Project Dashboards and Reports
17) Proficiency in MS Project software