Project Report On DI-CALCIUM PHOSPHATE (POWDER)
Project Report On DI-CALCIUM PHOSPHATE (POWDER)
www.eiriindia.org 1
CONTENTS
INTRODUCTION
USES/APPLICATIONS
MARKET OVERVIEW
GLOBAL DICALCIUM PHOSPHATE MARKET: REGIONAL OUTLOOK
GLOBAL DICALCIUM PHOSPHATE MARKET: KEY PLAYERS
PRODUCT SPECIFICATIONS
DICALCIUM PHOSPHATE
CALCIUM CHLORIDE
HYDROFLUORIC ACID
BIS SPECIFICATION
FORMULATION
REACTION – (A)
REACTION – (B)
RAW MATERIALS
ROCK PHOSPHATE
HYDROCHLORIC ACID (>30%)
SPECIFICATIONS
PHYSICAL PROPERTIES
CALCIUM HYDROXIDE
RAW MATERIAL/CHEMICALS SUPPLIERS
ROCK PHOSPHATE
ACID
HYDRATED LIME
LABORATORY CHEMICALS
MANUFACTURING PROCESS STEPS/PROCESS FLOW/QUALITY CONTROL
THE STEPS INVOLVE IN THE MANUFACTURE OF DI-CALCIUM PHOSPHATE IS
AS FOLLOWS.
PROCESS FLOW
QUALITY CONTROL
USE OF MACHINERY (CRITICAL)
GRINDING
BALL MILL
FEEDING SYSTEM
FILTRATION
ENGINEERING DESIGN CONSIDERATIONS
ETP FACILITY
ETP FLOW DIAGRAM (TYPICAL)
www.eiriindia.org 2
STP FLOW DIAGRAM (TYPICAL)
SEWAGE AND WASTE WATER EFFLUENT
UTILITIES REQUIREMENT (ESTIMATED - MONTH)
WASTE GENERATION & MANAGEMENT/GREEN BELT
GREEN BELT
WATER (ESTIMATED)
WASTE (ESTIMATED)
FLUE GAS (ESTIMATED)
PLANT & MACHINERY
SUPPLIERS OF PLANT & MACHINERY/TURNKEY SUPPLIERS
GRINDER
REACTORS
EVAPORATORS
MIXER
DRYER
STORAGE TANKS
CENTRIFUGE
PULVERIZERS
MATERIAL HANDLING EQUIPMENTS
LABORATORY EQUIPMENTS
BOILERS
INSTRUMENTATION AND PROCESS CONTROL EQUIPMENTS
D.G. SETS
EOT CRANES
POWER TRANSFORMERS
COOLING TOWER
ETP PLANTS
AIR POLLUTION CONTROL EQUIPMENTS
AIR CONDITIONING EQUIPMENTS
AIR COMPRESSOR
PLATEFORM WEIGHING MACHINE
ELECTRICAL MEASURING INSTRUMENTS
SUBMERSIBLE WATER PUMP
PRELIMINARY LAYOUT
PRINCIPLES OF PLANT LAYOUT
MAJOR PROVISIONS IN ROAD PLANNING FOR MULTIPURPOSE SERVICE ARE:
PLANT LOCATION FACTORS
PRIMARY FACTORS
www.eiriindia.org 3
RAW-MATERIAL SUPPLY:
MARKETS:
POWER AND FUEL SUPPLY:
WATER SUPPLY:
CLIMATE:
TRANSPORTATION:
WASTE DISPOSAL:
LABOR:
REGULATORY LAWS:
TAXES:
SITE CHARACTERISTICS:
COMMUNITY FACTORS:
FLOOD AND FIRE CONTROL:
HEALTH SAFETY AND ENVIRONMENT
ANTICIPATED ENVIRONMENTAL IMPACTS
CONSTRUCTION PHASE
OPERATION PHASE
MITIGATION MEASURES (PROPOSED)
HSE REQUIREMENT
SAFETY & OCCUPATIONAL MEASURE (STORAGE/HANDLING OF RAW
MATERIAL & PRODUCT)
ENVIRONMENTAL/SAFETY LIABILITY AND ENVIRONMENT CLEARANCE
PROCESS
POTENTIAL RISKS
PROPOSED IMPLEMENTATION SCHEDULE
PROJECT FINANCIALS
BASIS & PRESUMPTIONS (FOR PROFITABILITY WORKINGS)
www.eiriindia.org 4
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)
COST ESTIMATION
www.eiriindia.org 5