Mod 05

Module 5 provides an overview of the Electronic Manufacturing Site Assessment (eMSA) and guides suppliers on accessing the system. Suppliers must complete the eMSA for parts shipping to FCSD, with periodic self-assessments required for Q1 certification. The module also outlines scoring criteria and resources for assistance.

Uploaded by

Pedro Guereque
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views11 pages

Mod 05

Module 5 provides an overview of the Electronic Manufacturing Site Assessment (eMSA) and guides suppliers on accessing the system. Suppliers must complete the eMSA for parts shipping to FCSD, with periodic self-assessments required for Q1 certification. The module also outlines scoring criteria and resources for assistance.

Uploaded by

Pedro Guereque
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Module 5 eMSA

Electronic Manufacturing
Site Assessment (eMSA)

Module 5

1
Module 5 eMSA

 The purpose of this module is to provide an


overview of the Electronic Q1 Manufacturing Site
Assessment (eMSA) and to teach suppliers how to
access the system.

2
Module 5 eMSA

 Understand the Electronic Manufacturing Site


Assessment (eMSA) functions
 Know how to access the eMSA
 Determine the update frequency of the eMSA
 Identify training and help resources

3
 Manufacturing Sites shipping parts to FCSD
are required to complete an eMSA

 Procurement / Packaging sites are still


required to complete the excel based
assessment
◦ Contact your FCSD STA for the appropriate form and
process

4
 Supplier conducts a self-assessment per the
specified cadence and then submits it to the
STA Site Engineer. The STA Site Engineer
validates the self-assessment and determines
further actions, if necessary.

Note: The minimum ongoing Q1MSA frequency for suppliers of service


parts is every 12 months regardless of Q1 status.

5
Module 5 eMSA

 eMSA is an electronic or web-enabled version of the Q1


Manufacturing Site Assessment
 eMSA replaced the Excel-based assessment in 2006

 Primary functions of the eMSA:


◦ The Supplier Technical Assistance Engineer may request
that a supplier complete the eMSA as a prerequisite to Q1
certification
◦ Once certified to Q1, each supplier is required to conduct
periodic self assessment of their site based on the Ford
designated expectations and guidelines as shown in SIM

6
Module 5 eMSA

 Log into the Ford Supplier Portal (Covisint)


 Select the “Applications” tab
 Click on “Q1 Manufacturing Site Assessment”

◦ If the homepage is not displayed, go to:


[Link]

7
Module 5 eMSA

 Scoring is based on the status of the Q1 Manufacturing Site


assessment or the Q1 Manufacturing Assessment action plan, if
required
 The initial Overdue assessment will result in a metric score of 10
 For Q1 achievement, a MSA score of 15 metric points is required
 When 0 points are applied, Q1 revocation will be recommended

8
Module 5 eMSA

 The due date for the next assessment can be found


in SIM by clicking on the Site Status and Profile or
Site Q1 performance (Q1 Scoring detail) and
scrolling down to “Q1 Mfg. Site Assessment”

9
Module 5 eMSA

◦ Log into Covisint and select the links below, or copy and paste into your
web browser

 Online Supplier Handbook


[Link]
nt_Handbook.pdf
 Online Supplier Reference Manual
[Link]
ring_Site_Assessment_Reference.pdf

10
Module 5 eMSA

Contact
• FCSD or Production STA Engineer
• Send an email to SIMINFO@[Link]
• Click the “Contact Us” link in the upper right corner of the eMSA
web-page.