SYNGENTA INIDA LIMITED HYDERABAD FIELD CROP PROJECT
DAILY SITE MEETING REPORT
TECHNOLOGY CENTER, NUTANKAL Members Present Syngenta India Ltd. Pres JMSPL-PMC ent Mr Milind Sardesai Construction Manager Mr Raphael Mr Kiran Mr G.Nagaraj Mr S.Sangashetty Mr Mahinderkar Mr Vithal Mr.J.S.Nandi Mr.N.G.Vaidya Mr.V.V.Patel
DESCRIPTION
Pres ent
Contractors
Prese nt
Date: 26-12-09 Work
No of workers 5 26 15 2 9
Remarks
srinivasreddy Inspace Projects S.S.P.L. Blue star G.M Industries
Levelling work cold stoarage works S.W.D. works panal fixing of antichamber machine earecation
srinivasreddy Total No of workers 59
Today's work Review
Sl. No. Section
Tommorrow's Plan
working hours
1 L1
Ware House
panal fixing work;cealing work machinary works,
machinarywork and welding and cutting
2 L1 3 L1
Admin Building(Existing) Q.C LAB
dismatilling of internalwalls and c.rmasnory work in adjecentwall C.R masnory work is completed.
dismatling work Brick work
4 L1
REMNANT SEEDS ROOM
Earth work excation w/p
p.c.c work
5 L3
Storm water Drain
pipe jointing work w/p
Pipe laying
6 L2
Levelling work
boulder lifting w/p
boulder lifting w/p
7 P.D STATION
Earth work execavation
earth work excation for pipeline 80%completed
pipe laying and back fillingwork
SYNGENTA INIDA LIMITED HYDERABAD FIELD CROP PROJECT
DAILY SITE MEETING REPORT
TECHNOLOGY CENTER, NUTANKAL Members Present Syngenta India Ltd. Pres JMSPL-PMC ent Mr Milind Sardesai Construction Manager Mr Raphael Mr Kiran Mr G.Nagaraj Mr S.Sangashetty DATE:- 17.12.09 Work
Pres ent
Contractors
Prese nt
No of workers 8 4 5
Remarks
srinivasreddy Inspace Projects
Levelling work cold stoarage works
S.S.P.L. Mr Mahinderkar Mr Vithal Mr.J.S.Nandi Mr.N.G.Vaidya
S.W.D. works
Pipe line laying is delayed due to excavation not done
Total No of workers Sl. No. Section 1 L2
DESCRIPTION Today's work Review
17 Action
Tommorrow's Plan Levelling work & hard rock cutting
Levelling work @ 97.00 R.L.
Levelling work
2 L3 3 L1
storm water drain Ware House
Bricks shifting & piped shifted from factory Panels fixing in progress
Excavation & levelling Panel fixing Renovation work to be start(dismentaling GF interior)
Excavation work is not done due to non availability of drilling compressor
4 L1
Admin Building(Existing)
5 Chandi
Drilling of borewells
Drilling to start by evening
Drilling to be completed
6 Chandi-2
Survey of farmland
started survey
survey to be completed
SYNGENTA INIDA LIMITED HYDERABAD FIELD CROP PROJECT
DAILY SITE MEETING REPORT
TECHNOLOGY CENTER, NUTANKAL Members Present Syngenta India Ltd. Prese JMSPL-PMC Prese Contractors Prese nt nt nt Mr Milind Sardesai Construction srinivasreddy Manager Inspace Projects Mr Raphael Mr G.Nagaraj Mr Kiran Mr S.S.P.L. S.Sangashetty Mr Mahinderkar Mr Vithal Mr.J.S.Nandi Mr.N.G.Vaidya DATE:- 17.12.09 Work
Levelling work cold stoarage works S.W.D. works
Total No of Sl.No. Section
DESCRIPTION Today's work Review
1 L2
Levelling work @ 97.00 R.L.
Levelling work in progress
2 3 4 5 6
L3 L1 L3(Elect) L3(Elect)
storm water drain Ware House Light pole erection work Borewell supply
Excavation & P.C.C. Cold stoarage Panels fixing in progress excavation & pole erection cable laying work
ECT
RT
DATE:- 17.12.09 Work No of workers 10 4 4 Remarks
KAL
Levelling work cold stoarage works S.W.D. works
Total No of workers Tommorrow's Plan Levelling work & hard rock cutting
18 Action
Pipe laying Panel fixing connections connections
Excavation work is not done due to non availability of drilling compressor
SYNGENTA INIDA LIMITED HYDERABAD FIELD CROP PROJECT
DAILY SITE MEETING REPORT
TECHNOLOGY CENTER, NUTANKAL Members Present Syngenta India Ltd. Pres JMSPL-PMC ent Mr Milind Sardesai Construction Manager Mr Raphael Mr Kiran Mr G.Nagaraj Mr S.Sangashetty Mr Mahinderkar Mr Vithal Mr.J.S.Nandi Mr.N.G.Vaidya Total No of workers Sl. No. Section 1 L2 2 L3 3 L1 4 L1(warehouse)
DESCRIPTION Today's work Review
Pres ent
Contractors
Prese nt
DATE:- 11.12.09 Work
No of workers 8 2 7
Remarks
Inspace Projects Srinivasreddy Inspace Projects(Blue Star)
Interior works Dismentaling Cold Storage Work
17 Action Srinivasreddy Srinivas
Tommorrow's Plan
Compound wall Storm water Drain Temprorary Lab Cold Storage works
Disconnection of Electrical cables Removing of Cable and of street light. Poles. Allignment marking and Shifting the pipes, markout gradient line marking flooring, painting works & electrical works completed Panel fixing and marking HSE been followed while Panel fixing and marking Panel fixing HSE been followed while Panel fixing particularly working on height.
Krishna Murthy.
5 L1(warehouse)
Cold Storage works
Krishna Murthy.
SYNGENTA INIDA LIMITED HYDERABAD FIELD CROP PROJECT
DAILY SITE MEETING REPORT
TECHNOLOGY CENTER, NUTANKAL Members Present Syngenta India Ltd. Present JMSPL-PMC Present Contractors Present
DATE:- 09.12.09
Mr Milind Sardesai Mr Raphael Mr Kiran
Construction Manager Mr G.Nagaraj Mr S.Sangashetty Mr Mahinderkar Mr Vithal Mr.J.S.Nandi Mr.N.G.Vaidya
Inspace Projects Srinivasreddy S.S.P.L.
Total
DESCRIPTION Today's work Review
Sl.No.
Section 1 L2 2 L3 Compound wall Storm water Drain Dismentaled bricks shifting alignment marking, levelling
3 L1 4 5
Temprorary Lab
Interior work,flooring & electrical works
ED ROJECT ANKAL No of Remarks worke rs Interior works, electrical works, vinyl 10 flooring Block shifting 9 Drain work(marking & levelling) 3 DATE:- 09.12.09 Work
EPORT
22 Total No of workers Tommorrow's Plan Levelling markout & levelling flooring, painting works & electrical worsks
oday's work Review
Action
ntaled bricks shifting
ent marking, levelling
k,flooring & electrical works
Cleaning to be done after the work everyday
SYNGENTA INIDA LIMITED HYDERABAD FIELD CROP PROJECT
DAILY SITE MEETING REPORT
TECHNOLOGY CENTER, NUTANKAL Members Present Syngenta India Ltd. Pres JMSPL-PMC ent Mr Milind Sardesai Construction Manager DATE:- 09.12.09 Work
Pres ent
Contractors
Prese nt
No of workers 9
Remarks
Inspace Projects Mr Raphael Mr Kiran Mr G.Nagaraj Srinivasreddy Mr S.Sangashetty Mr Mahinderkar Mr Vithal Mr.J.S.Nandi Mr.N.G.Vaidya S.S.P.L.
Interior works 9 Dismentaling Drain work 3
21 Total No of workers Sl. No. Section
DESCRIPTION Today's work Review
Tommorrow's Plan
Action
1 L2
Compound wall
Dismentaled bricks shifting
bricks shifting
2 L3
Storm water Drain
Shifting the pipes, markout
markout & levelling
3 L1
Temprorary Lab
Interior work, painting & electrical works
flooring, painting works & electrical worsks
Cleaning to be done after the work everyday
10
SYNGENTA INIDA LIMITED HYDERABAD FIELD CROP PROJECT
DAILY SITE MEETING REPORT
TECHNOLOGY CENTER, NUTANKAL Members Present Syngenta India Ltd. Pres JMSPL-PMC ent Mr Milind Sardesai Construction Manager DATE:- 08.12.09 Work
Pres ent
Contractors
Prese nt
No of workers 7
Remarks
SrinivasReddy Mr Raphael Mr Kiran Mr G.Nagaraj Ravindra Mr S.Sangashetty Mr Mahinderkar Mr Vithal Mr.J.S.Nandi Mr.N.G.Vaidya Inspace Projects
Compound wall dismentaling 8 Levelling work Interior works 12
27 Total No of workers Sl. No. Section
DESCRIPTION Today's work Review
Tommorrow's Plan
Action
1 L2
Compound wall
Dismentaled bricks shifting
bricks shifting
SrinivasReddy
2 L3
Levelling
Ground levelling & filling
3 L1
Temprorary Lab
Interior works, painting & electrical flooring, painting works & works electrical worsks
10
SYNGENTA INIDA LIMITED HYDERABAD FIELD CROP PROJECT
DAILY SITE MEETING REPORT
TECHNOLOGY CENTER, NUTANKAL Members Present Syngenta India Ltd. Pres JMSPL-PMC ent Mr Milind Sardesai Construction Manager DATE:- 07.12.09 Work
Pres ent
Contractors
Prese nt
SrinivasReddy Mr Raphael Mr Kiran Mr G.Nagaraj Ravindra Mr S.Sangashetty Mr Mahinderkar Mr Vithal Mr.J.S.Nandi Mr.N.G.Vaidya
Compound wall dismentaling Levelling work
No of Remarks workers 10 Inspace projects works not done due to JRS strike 8
18 Total No of workers Sl. No. Section
DESCRIPTION Today's work Review
Tommorrow's Plan
Action
1 L2
Compound wall
Dismentaling work in progress
Bricks to be shift
SrinivasReddy
2 L3
Levelling
Levelling work in progress
10
SYNGENTA INIDA LIMITED HYDERABAD FIELD CROP PROJECT
DAILY SITE MEETING REPORT
TECHNOLOGY CENTER, NUTANKAL Members Present Syngenta India Ltd. Pres JMSPL-PMC ent Mr Milind Sardesai Construction Manager DATE:- 06.12.09(Sunday) Prese Work nt
Pres ent
Contractors
No of workers 8
Remarks
Inspace Projects Mr Raphael Mr Kiran Mr G.Nagaraj SrinivasReddy Mr S.Sangashetty Mr Mahinderkar Mr Vithal Mr.J.S.Nandi Mr.N.G.Vaidya Ravindra
Temporary Lab interior works Compound wall dismentaling Levelling work 8 8
24 Total No of workers Sl. No. Section
DESCRIPTION Today's work Review
Tommorrow's Plan
Action
1 L1
Temporary Lab
Interiors works & Doors fixing in progress
1)Lunch room Interior works & mesh fixing
2 L2
Compound wall
Dismentaling work in progress
dismentaling
3 L3
Levelling
Levelling work in progress
Levelling
10
SYNGENTA INIDA LIMITED HYDERABAD FIELD CROP PROJECT
DAILY SITE MEETING REPORT
TECHNOLOGY CENTER, NUTANKAL Members Present Syngenta India Ltd. Pres JMSPL-PMC ent Mr Milind Sardesai Construction Manager DATE:- 05.12.09 Work
Pres ent
Contractors
Prese nt
Inspace Projects Mr Raphael Mr Kiran Mr G.Nagaraj SrinivasReddy Mr S.Sangashetty Mr Mahinderkar Mr Vithal Mr.J.S.Nandi Mr.N.G.Vaidya Ravindra
Temporary Lab interior works Compound wall dismentaling Levelling work
No of Remarks workers 8 Work stopped due to TRS strike @ 4.00 p.m 6 3
17 Total No of workers Sl. No. Section
DESCRIPTION Today's work Review
Tommorrow's Plan
Action
Temporary 1 Lab
Interior works in Lunch room
Interior work in progress
1)Lunch room Interior works.
Inspace Projects
2 Levelling(L3)
Levelling work
Levelling work in progress
Levelling
Ravindra
Compound 3 wall (L2)
Compound wal dismentaling work
Compound wal dismentaling work in progress
compound wall dismentaling
Srinivasreddy
10
SYNGENTA INIDA LIMITED HYDERABAD FIELD CROP PROJECT
DAILY SITE MEETING REPORT
TECHNOLOGY CENTER, NUTANKAL Members Present Syngenta India Ltd. Pres JMSPL-PMC ent Mr Milind Sardesai Construction Manager Mr Raphael Mr Kiran Mr G.Nagaraj Mr S.Sangashetty Mr Mahinderkar Mr Vithal Mr.J.S.Nandi Mr.N.G.Vaidya 8 Total No of workers Sl. No. Section
DESCRIPTION Today's work Review
Pres ent
Contractors
Prese nt
DATE:- 04.12.09 Work Temporary Lab interior works
No of workers 8
Remarks
Inspace Projects
Temporary 1 Lab
Interior works in Lunch room
Interior work in progress
Tommorrow's Plan 1)Lunch room Interior works. 2) Two doors can be removed from existing admin building and to be fix in Temp lab
Action
Inspace Projects
2 Levelling(L2)
Compound wall
Compound wall dismentaling in progress
Ground levelling & compound wall dismentaling
10
SYNGENTA INIDA LIMITED HYDERABAD FIELD CROP PROJECT
DAILY SITE MEETING REPORT
TECHNOLOGY CENTER, NUTANKAL Members Present Syngenta India Ltd. Pres JMSPL-PMC ent Mr Milind Sardesai Construction Manager Mr Raphael Mr Kiran Mr G.Nagaraj Mr S.Sangashetty Mr Mahinderkar Mr Vithal Mr.J.S.Nandi Mr.N.G.Vaidya 8 Total No of workers Sl. No. Section
DESCRIPTION Today's work Review
Pres ent
Contractors
Prese nt
DATE:- 03.12.09 Work Temporary Lab interior works
No of workers 8
Remarks
Inspace Projects
Tommorrow's Plan
Action
Temporary 1 Lab
Interior works in Lunch room
Interior work in progress
Lunch room Interior works
10
SYNGENTA INIDA LIMITED HYDERABAD FIELD CROP PROJECT
DAILY SITE MEETING REPORT
TECHNOLOGY CENTER, NUTANKAL Members Present Syngenta India Ltd. Pres JMSPL-PMC ent Mr Milind Sardesai Construction Manager Mr Raphael Mr Kiran Mr G.Nagaraj Mr S.Sangashetty Mr Mahinderkar Mr Vithal Mr.J.S.Nandi Mr.N.G.Vaidya 8 Total No of workers Sl. No. Section
DESCRIPTION Today's work Review
Pres ent
Contractors
Prese nt
DATE:- 02.12.09 Work Temporary Lab interior works
No of workers 8
Remarks
Inspace Projects
Tommorrow's Plan
Action
Temporary 1 Lab
Interior works in Lunch room
Contractor are following PPE
Lunch room Interior works
Inspace Projects- Mr. Suresh
10
SYNGENTA INIDA LIMITED HYDERABAD FIELD CROP PROJECT
DAILY SITE MEETING REPORT
TECHNOLOGY CENTER, NUTANKAL Members Present Syngenta India Ltd. Pres JMSPL-PMC ent Mr Milind Sardesai Construction Manager Mr Raphael Mr Kiran Mr G.Nagaraj Mr S.Sangashetty Mr Mahinderkar Mr Vithal Mr.J.S.Nandi Mr.N.G.Vaidya 8 Total No of workers Sl. No. Section
DESCRIPTION Today's work Review
Pres ent
Contractors
Prese nt
DATE:- 01.12.09 Work Temporary Lab interior works
No of workers 8
Remarks
Inspace Projects
Tommorrow's Plan
Action
Temporary 1 Lab
Interior works in Lunch room
Work delayed due to non availability to PPE
Contractor to get PPE for all
Inspace Projects- Mr. Suresh
10