Potential
Impact Mitigation Strategy
Issue
Delay in session delivery
Test all equipment one day before the event. Keep
Technical due to malfunctioning
backup equipment, such as spare laptops and projectors,
Issues equipment (e.g.,
available.
projectors, laptops).
Internet Difficulty in accessing
Arrange a backup internet connection (e.g., mobile
Connectivity online tools, resources,
hotspot). Download necessary materials for offline use.
Problems or demonstration sites.
Absence of Disruption in session
Prepare cross-training among team members to ensure
Team delivery due to
others can cover the missing session.
Member unforeseen absence of a
Reduced engagement
Participant Send reminders to participants a day prior to the event.
and difficulty in group
Absenteeism Allow late arrivals and provide materials for catch-up.
activities.
Sessions might exceed
Timing Allocate buffer times between sessions and enforce
the scheduled time,
Overruns strict time management during delivery.
affecting other activities.
Lack of Reduced learning
Include interactive activities, Q&A sessions, and group
Participant outcomes and
exercises to encourage participation.
Engagement satisfaction levels.
Total disruption of the
Power Arrange a generator or uninterruptible power supply
event due to lack of
Outages (UPS). Schedule critical sessions for peak power times.
electricity.
Resource Inadequate printed Prepare 20% extra copies of all materials. Confirm
Shortages materials or stationery. resource availability a day prior to the event.
Responsible Team
Member
Taha Lodhi (Tech Lead)
Iman Alam (Analytics
Expert)
Maroosha Sheraz (Team
Leader)
Minahil Hammad
(Participant Coordinator)
Maroosha Sheraz
All Team Members
Taha Lodhi (Tech Lead)
Iman Alam