Construction Estimation for Residential Building

The document provides an abstract estimation for the construction of a residential building with stilt and three floors in Hyderabad, Telangana. It details the quantities, rates, and amounts for various construction activities including earthwork, masonry, and concrete work. The purchasers of the property are identified as members of the Mondreti family.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views1 page

Construction Estimation for Residential Building

The document provides an abstract estimation for the construction of a residential building with stilt and three floors in Hyderabad, Telangana. It details the quantities, rates, and amounts for various construction activities including earthwork, masonry, and concrete work. The purchasers of the property are identified as members of the Mondreti family.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

ABSTRACT ESTIMATION FOR PROPOSED CONSTRUCTION OF STILT,FIRST, SECOND & THIRD FLOOR OF

RESIDENTIAL BUILDINGING IN PART OF HOUSE BEARING NO.8-2-293/82/A/768 WITH PTIN : 1100857451 ON


PLOT NO.768, IN OLD SURVEY NO.403/1 AND NEW SURVEY NO. 120 OF SHAIKPET VILLAGE AND SURVEY
NO. 102/1 OF HAKIMPET VILLAGE, HYDERABAD,TELANGANA.
PRO. PURCHASER : [Link]. SANTHI ROKKAM, W/O. RAVI KRISHNA MONDRETI,
[Link]. SISIRA MODRETI, D/O. RAVI KRISHNA MONDRETI,
[Link]. VEDANG MONDRETI, D/O. RAVI KRISHNA MONDRETI,

Stilt Floor
SNO DESCRIPTION QTY Rate/ Unit Amount
1 Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not
exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed
….. [Link] ….. Rs.200000.00
2 Earth work in excavation : including back filling by mechanic al means over the area and
disposal of surplus excavated earth, lead upto 50m and lift upto1.5m, disposed earth to be
levelled and neatly dressed shall be measured according to neat line for measurement
Foundation works 10800.00 15.00 Cft Rs.162000.00
3 Earth work in excavation : Extra for depth exceeding from1.5m to 3.0 m Rate is over
corresponding basic item for depth upto 1.5 m .
Foundation works 13440.00 15.00 Cft Rs.201600.00
4 Earth work in excavation : For Basement trenches for crs masonary of width 2'0" Height 3'0"
inclu ding back filling by mechanic al means Hydraulic excavator or manual, disposed earth to
be leve lled and neatly dressed up.
Foundation works 3240.00 15.00 Cft Rs.48600.00
5 Earth/sand filling : in plinth in layers not more than 60 cm thick including necessary carriage,
watering, ramming [Link] teas directed and specified including payment of land
compensation, forest royalty, sales tax and other duties and taxes as may be necessary.
Foundation works 15576.00 15.00 Cft Rs.233640.00
6 PCC : Plain cement concrete works with coarse aggr egate of sizes 25mm to 40mm in
foundation bed for footing works [Link] directed and specified including dewatering if necessary,
and curing complete. In prop 1cement: 4 sand :8 coarse aggregate by volume. PCC [Link] prop

Foundation works 816.00 100.00 Cft Rs.81600.00


7 UCRS : Providing and constructing RANDOM RUBBLE MASONRY using hard granite stones
obta ined from approved quarry with bond stones at every 0.50sqm of wall sur face in cement
mortar in mixes stipulated below without pinning on face, but including raking out joints and
pointing etc.
Foundation works 1296.00 85.00 Cft Rs.110160.00
8 COURSED RUBBLE STONE MASONRY : Providing and laying C.R.S Masonry 2nd sort as
specified in CM (1:8) including fair cutting, waste bonding, Plumb lining, level ing,scaffolding,
and curing below ground level and up to plinth, all materials and labour etc. complete.
Foundation works 1620.00 150.00 Sft Rs.243000.00
9 Ground Floor base : RCC work of M20 grade with 20mm and down grade hard granite chips
including hoisting and laying including cost of material, conveyence, labour,
T&P, royalty etc complete in all respect as per direction of Engineer- inCharge (Cement 53
Grade ACC/BIRLA GOLD/ ULTRATECH/ AMBUJA) (Below Parking & below Basement )

Foundation works 2596.00 200.00 Cft Rs.519200.00