0% found this document useful (0 votes)
181 views23 pages

TS452 2020

The document contains a series of questions and answers related to SAP S/4HANA Sourcing and Procurement certification (C_TS452_2020). It covers various topics including stock transfers, purchasing info records, invoice processing, and procurement workflows. Each question is accompanied by multiple-choice answers, with some questions indicating the correct answers.

Uploaded by

Sai Katepalli
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
181 views23 pages

TS452 2020

The document contains a series of questions and answers related to SAP S/4HANA Sourcing and Procurement certification (C_TS452_2020). It covers various topics including stock transfers, purchasing info records, invoice processing, and procurement workflows. Each question is accompanied by multiple-choice answers, with some questions indicating the correct answers.

Uploaded by

Sai Katepalli
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.

Question. 1 (Correct)
You test the various options that SAP S/4HANA offers for stock transfers
between two different plants within the same company code. Which special
features do stock transport orders have? Note: There are 2 correct answers
to this question.

A. You can optionally post the goods issue from inspection stock in the supplying plant.
B. The material on the road is managed in the stock in transit of the
receiving plant.
C. If necessary, you can post the goods receipt to blocked stock in the
receiving plant.
D. The material on the road is part of the valuated stock of the shipping plant.
Answers B C

Question. 2 (Correct)
How do you proceed if you want to create purchasing info records for
consumable materials without material master records?

A. You specify a special info category.


B. You specify the relationship between a material type and a supplier.
C. You must first create material master records.
D. You specify the relationship between a material group and a supplier.
Answers D

Question. 3
Which of the following occurs when you park a supplier invoice related to a
purchase order? Note: There are 2 correct answers to this question.

A. The purchase order history is updated.


B. An MM invoice document is created.
C. G/L accounts are updated.
D. An FI invoice is posted and blocked for payment.
Answers A B

Question. 4 (Correct)
Which item category must you use for subcontracting?

A. Item Category K
B. Item Category L
C. Item Category D
D. Item Category W
Answers B
Question. 5
1|Page
SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.1

At which of the following organizational levels must you maintain a


business partner master record for a supplier? Note: There are 3 correct
answers to this question.

A. Client
B. Purchasing organization
C. Plant
D. Purchasing group
E. Company code
Answers A B E

Question. 6 (Correct)
You want to use automatic conversion of purchase requisitions into
purchase orders for some raw materials. What are the prerequisites? Note:
There are 3 correct answers to this question.

A. The Automatic Purchase Order indicator is set in the plant-specific


purchasing data of the material master record.
B. The Automatic Purchase Order indicator is set in the purchasing data of the business
partner master record.
C. A source of supply containing valid conditions is assigned to the
purchase requisition.
D. A contract with plant-specific conditions exists for the material and the vendor.
E. A plant-specific source list entry exists for the material.
Answers A C E

Question. 7
When using a classic release procedure, for which of the following
documents must you use classification? Note: There are 2 correct answers
to this question.
A. Outline agreements
B. Requests for quotation
C. JIT delivery schedules
D. Purchase requisitions
Answers B D

Question. 8 (Correct)
2|Page
SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.1

Your MRP run detects a shortage of 2000 pieces for a certain material for
which a quota arrangement is active. Each of your two suppliers can only
supply 1000 pieces at once. What must you maintain to have MRP generate
a procurement proposal for 1000 pieces for each supplier? Note: There are
2 correct answers to this question.

A. Assign the indicator for quota splitting to the used lot-sizing procedure.
B. Assign a rounding profile in the material master record of the planned
material.

C. Set a maximum quota quantity in the quota arrangement item for each
supplier.
D. Set a maximum lot size in the quota arrangement item and activate the
1x checkbox.
Answers C D

Question. 9
In your project, you need to make sure that consignment purchase orders
utilize a different number range than other purchase orders. What must
you do?

A. Customize a new document type, assign a new number range object, and
assign the item category for consignment to this type.
B. Customize a new document type, assign a new number range, and assign
the item category for consignment only to this type.
C. Customize a new item category for this purpose and assign a new number
range to it.
D. Customize a new item category for this purpose and deactivate the standard
one.
Answers B

Question. 10
Which SAP Fiori design principle has the goal of having one type of user,
one use case, and a maximum of three screens for each application?

A. Simple
B. Role-based
C. Responsive
D. Instant value
Answers A

3|Page
SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.1

Question. 11 (Correct)
You regularly purchase non-stock materials. What must you set up to allow
the system to automatically propose specific accounts for these materials?

A. Assign transaction keys to the material groups of these materials.


B. Assign transaction keys to the account assignment categories used.
C. Assign valuation classes to the material groups of these materials.
D. Assign valuation classes to the account assignment categories used.
Answers C

Question. 12 (Correct Answer is A,C & E)


Your purchasing department wants to monitor overdue purchase orders.
What are the prerequisites for issuing delivery reminders for a purchase
order? Note: There are 3 correct answers to this question.

A. Maintain reminder periods in the purchase order item.


B. Maintain a confirmation control key in the supplier master.
C. Maintain purchasing value keys in the purchase order item.
D. Output the purchase order.
E. Set message determination in Customizing and maintain message
records.
Answers A D E

Question. 13 (correct)
You want to manually post an initial entry of stock for a material in SAP
S/4HANA. You should be able to enter both a quantity and an amount.
How do you proceed? Note: There are 2 correct answers to this question.

A. On the SAP Fiori launchpad, use the Post Goods Movement app.
B. On the SAP Fiori launchpad, use the Manage Stock app.
C. On the SAP Fiori launchpad, use the Post Goods Receipt without
Reference app.
D. In the SAP GUI, use transaction MIGO.
Answers C D

Question. 14
Which of the following elements can be generated by material
requirements planning (MRP)? Note: There are 3 correct answers to this
question.
A. Production order
B. Delivery schedule line
C. Purchase order
D. Planned order

4|Page
SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.1

E. Purchase requisition
Answers B D E
Question. 15 (Correct)
An incoming invoice shows a variance when compared to the expected
quantity or amount. How can you record this invoice? Note: There are 2
correct answers to this question.

A. Enter the actual invoice values, use the reduction function, and post. The
system creates a credit memo in addition to the actual invoice.
B. Enter the actual invoice values, use the reduction function, and post. The
system creates an invoice with the reduced values.
C. Enter the actual invoice values and post. The system creates an invoice with
the actual values and might block it for payment.
D. Enter the actual invoice values. You must then park the invoice because
posting is NOT allowed.
Answers A D

Question. 16 (Correct)
Which of the following prerequisites must be met for the system to check
the shelf life of materials at goods receipt? Note: There are 3 correct
answers to this question.

A. The shelf life expiration date check is activated for the material type in
Customizing.
B. The shelf life expiration date check is activated for the plant in Customizing.
C. The shelf life expiration date check is activated for the movement type in
Customizing.
D. Batch management is active for the material in the plant.
E. The purchase order item contains the remaining shelf life.
Answers A C E

Question. 17 (Correct)
For which type of blocked invoices can you use the automatic release
function of the Release Blocked Invoices app?

A. Invoices blocked because of an excessive amount


B. Invoices blocked manually
C. Invoices blocked stochastically
D. Invoices blocked due to variances

Answers D

5|Page
SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.1

Question. 18
How can you personalize the Procurement Overview app? Note: There are
3 correct answers to this question.

A. Filter the content of a card.


B. Extend the set with a new card.
C. Change the position of the cards.
D. Change the set of cards.
E. Hide an existing card
Answers A C E

Question. 19 (Correct)
Which of the following tasks does the system perform during reorder point
planning? Note: There are 3 correct answers to this question.

A. Recalculate the replenishment lead time for materials with automatic


reorder point planning.
B. Check, in the planning file entries, whether a material must be included in
the planning run.
C. Perform backward scheduling to determine the availability dates of
purchase requisitions.
D. Carry out a lot-size calculation for every material with net
requirements.
E. Carry out a net requirement calculation for every material included in the
planning run.
Answers A C D

Question. 20 (Correct)
You want to set up account determination so that several material types are
grouped on the same accounts. What must you do?

A. Assign the same valuation grouping code to the material types.


B. Assign the same account modification to the material types.
C. Assign the same valuation class to the material types.
D. Assign the same account category reference to the material types.
Answers D

Question. 21(Correct)
When creating a scheduling agreement, which field controls the creation of
a scheduling agreement with release documentation?
A. JIT Indicator

6|Page
SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.1

B. Creation Profile
C. Agreement Type (Answers C)
D. Item Category
Question. 22
What are some key features of goods-receipt-based (GR-based) invoice
verification? Note: There are 3 correct answers to this question.

A. An invoice item is automatically generated for each goods receipt.


B. As a prerequisite, the indicator for GR-based invoice verification is set
in the purchase order item.
C. Each invoice item is assigned to a goods receipt item.
D. After posting, you can reassign invoices from one goods receipt to another.
E. A goods receipt must be posted prior to the invoice.
Answers B C E

Question. 23
Goods from a supplier arrive at your warehouse. However, you do NOT
want these goods to be part of your inventory yet. What is the procedure
for recording the conditional goods receipt (GR)?

A. Post a goods receipt to valuated GR blocked stock.


B. Post a goods receipt to non-valuated GR blocked stock.
C. Select the blocked stock type when posting the goods receipt.
D. Make a note in the purchase order and wait until the conditions for accepting
the delivery are met.
Answers A

Question. 24 (Correct)
Which of the following are characteristics of the Hold function for
purchase orders? Note: There are 2 correct answers to this question.

A. It triggers a workflow to request completion of the document.


B. It is supported for blanket purchase orders.
C. It disables follow-on activities.
D. It allows any kind of error in a document.
Answers A C

Question. 25(Correct)
Which field can you use to prevent a discontinued material from being
procured?

A. Special procurement type


B. Control code

7|Page
SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.1

C. Material status
D. Authorization group
Answers C
Question. 26 (Correct)
What is the effect of setting the Freeze Book Inventory indicator in a
physical inventory document header?

A. The book inventory is determined and fixed in the physical


inventory document at the beginning of the count.
B. The system blocks all inventory management units of the physical inventory
document for procurement.
C. The book inventory is determined and fixed in the physical inventory
document at the time of the difference posting.
D. The system blocks all inventory management units of the physical inventory
document for goods movements.
Answers A

Question. 27 (Correct)
Which of the following are possible personalization options of the SAP
Fiori launchpad? Note: There are 2 correct answers to this question.

A. Settings for language and region


B. Selection of the design theme
C. Selection of an SAP Fiori catalogue
D. Selection of tile size
Answers A B

Question. 28 (Correct answer- ADE)


You send newly created purchase orders to a supplier via EDI, whereas
quantity or price changes are to be transmitted by e-mail. What
prerequisites must be met if you are using the condition technique for
message determination? Note: There are 3 correct answers to this question.

A. The Price and Quantity fields are relevant for printout


changes.
B. The condition record contains the Price and Quantity fields.
C. The dispatch time related to the change message needs to be set to 1 (send with
periodically scheduled job).
D. The New Message Determination Process for Change Messages
indicator is flagged in Customizing.
E. You use different message types for the print operations New
and Change.
8|Page
SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.1

Answers E

Question. 29 (Correct)
What can you control with a document type in purchasing? Note: There
are 3 correct answers to this question.

A. Number range
B. Linkage to material groups
C. Allowed account assignment categories
D. Field selection
E. Allowed item categories
Answers A D E

Question. 30
You are receiving deliveries for a valuated material. Which documents are
created when you post a goods receipt? Note: There are 2 correct answers
to this question.

A. Physical inventory document


B. Material document
C. Accounting document
D. Invoice document
Answers B C

Question. 31 (correct)
Which options are available for the automatic posting of unplanned
delivery costs when creating an invoice with purchase order reference?
Note: There are 2 correct answers to this question.

A. The costs can be posted to a separate account.


B. The system determines a freight clearing account for posting the costs.
C. The costs are posted automatically in a separate invoice.
D. The costs can be distributed among the invoice items.
Answers A D

Question. 32
Which of the following actions can an end user perform with filtered report
results in an SAP Fiori app? Note: There are 3 correct answers to this
question.

A. Schedule as a background job.

9|Page
SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.1

B. Save as a new tile on the SAP Fiori launchpad.


C. Share on SAP Jam.
D. Send via e-mail.
E. Save as a CDS view.
Answers B C D
Question. 33 (Correct)
Which of the following are features of the Delivery Completed indicator in
a purchase order (PO) item? Note: There are 2 correct answers to this
question.

A. You can set the indicator manually when entering a goods receipt for
your PO item.
B. The indicator is always set automatically if the quantity received is within the underdeliver
tolerance.
C. If you set the indicator, the PO item is NO longer relevant for material
requirements planning.
D. If you set the indicator, NO further goods receipt may be posted for the PO item.
Answers A C

Question. 34 (Correct)
Which of the following can you control with the confirmation control key?
Note: There are 2 correct answers to this question.

A. The sequence of required confirmations


B. Default reminder levels for outstanding confirmations
C. The document type for the goods receipt
D. Whether a confirmation is a prerequisite for a goods receipt
Answers A D

Question. 35
Which of the following are prerequisites for flexible workflows for
purchase order approval? Note: There are 3 correct answers to this
question.

A. Deactivate the classic release procedure for purchase orders in customizing.


B. Activate the flexible workflow for purchase orders in customizing.
C. Define the recipients for the flexible workflow in the Manage Workflows
for Purchase Orders SAP Fiori app.
D. Set up the preconditions for the flexible workflow in the Manage
Workflows for Purchase Orders SAP Fiori app.
E. Create a class with flexible workflow characteristics for purchase orders.
Answers B C D

Question. 36 (Correct)

10 | P a g e
SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.1

For which type of contracts can you use item category Material Group
(W)?

A. Sales contracts
B. Service contracts
C. Quantity contracts
D. Value contracts
Answers D
Question. 37
What do you need to do if you want MRP Live to create planned orders for
externally procured materials?

A. Implement BAdI PPH_MRP_SOURCING_BADI =>


SOS_DET_ADJUST.
B. Change the procurement type of the material.
C. Set the MRP indicator in the source list of the material to "Not relevant for planning".
D. Set the appropriate plant-specific material status.
Answers A

Question. 38
For which of the following scenarios could you implement a stock
determination strategy for a material in inventory management? Note:
There are 3 correct answers to this question.

A. Your material is stored at various storage locations in your plant. You


want to withdraw from the storage location with the highest stock first.
B. Your material is stored in different plants. You want to withdraw from the plant with the
lowest stock first.
C. You use split valuation to separate internally produced and externally
procured quantities. Internally produced quantities should be withdrawn
first.
D. You have both vendor consignment stock and own stock for the
material. You want to withdraw your own stock first.
E. You have both quality inspection stock and unrestricted-use stock for the material. You
want to withdraw unrestricted-use stock first.
Answers A C D

Question. 39 (Correct)
What needs to be configured and assigned if pricing conditions in purchase
orders should only be visible to certain users?

A. User parameter EVO


B. User parameter EFB
C. Field selection key for the activity category
D. Field selection key for the transaction

11 | P a g e
SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.1

Answers B

Question. 40 (Correct)
Which of the following parameters should you consider when determining
the manual reorder point for a material? Note: There are 3 correct answers
to this question.

A. Safety stock
B. Checking group for availability check
C. Expected daily requirements
D. Lot-sizing procedure
E. Replenishment lead time
Answers A C E

Question. 41 (Correct)
Production planning and product costing are to be implemented in your
company. Which organizational level must you choose for stock valuation?

A. Company code
B. Business area
C. Plant
D. Controlling area
Answers C

Question. 42
You have ordered a stock material that is valuated with a standard price.
The price in the purchase order (PO) is higher than the standard price of
the material. Which accounts are updated at goods receipt? Note: There
are 3 correct answers to this question.

A. GR/IR
B. Stock
C. Price differences
D. Material consumption
E. Inventory differences
Answers A B C

Question. 43 (Correct Answer- C)

12 | P a g e
SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.1

In your company, invoice verification clerks post a cash discount amount


using the posting net method. How do they trigger the posting method?

A. By choosing an appropriate payment method


B. By changing the payment terms
C. By using an appropriate document type
D. By creating an extra invoice item for the cash discount amount
Answers B
Question. 44 (Correct Answer- A & B)
Your company uses the classic release procedure for purchase orders.
What are some characteristics of a release procedure for purchase orders?
Note: There are 2 correct answers to this question.

A. The release or rejection of a purchase order is only possible at header level.


B. The output of purchase orders is NOT possible before approval.
C. Release procedures for purchase orders are possible without classification.
D. The release or rejection of a purchase order is only possible at line item level.
Answers A C

Question. 45 (Correct)
You have several company codes and plants in your SAP S/4HANA system.
You set the valuation level to plant. How can you minimize the effort
involved in account determination?
A. You can group plants assigned to company codes that have the same chart of accounts by
using the account grouping code.
B. You can group plants assigned to company codes that have different charts of accounts by
using the account grouping code.
C. You can group plants assigned to company codes that have different charts of accounts by
using the valuation grouping code.
D. You can group plants assigned to company codes that have the same
chart of accounts by using the valuation grouping code.
Answers D

Question. 46 (Correct)
In which situation can you have open items in the GR/IR clearing account?

A. When there is a price difference between purchase order and invoice receipt for a purchase
order item.
B. When there is a quantity difference between invoice and purchase order
item.
C. When there is a difference between the invoice price and the valuation price of the
material.
D. When there is a quantity difference between goods receipt and invoice receipt for a
purchase order item.
Answers B

13 | P a g e
SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.1

Question. 47 (Correct Answer- A & C)


You want to post scrap expenses to a special account. Which characteristics can you use
to influence the behavior of the account determination? Note: There are 2 correct
answers to this question.
A. Movement type
B. Stock type
C. Plant
D. Storage location (Answers A D)
Question. 48 (Correct)
You are interested in the percentage of shopping cart items that require
manual changes to either the purchase order or the purchase requisition
after initial creation and approval. What key performance indicator (KPI)
provides this information?

A. Purchase Requisition-to-Order Cycle Time


B. Purchase Requisition Item Changes
C. Purchase Requisition High Touch Rate
D. Purchase Requisition Low Touch Rate
Answers B

Question. 49 (Correct)
How does the system derive the company code when you post a goods
movement in a plant?

A. The system determines the company code from your default settings.
B. When you enter a plant, the system uniquely determines the company
code, since a plant can only belong to one company code.
C. When you enter a plant, the system uniquely finds a purchasing organization and then a
company code, since each purchasing organization is assigned to a single company code.
D. When you enter a movement type, the system uniquely finds a company code, since a
movement type is only valid for a single combination of plant and company code.
Answers B

Question. 50 (Correct)
What are some SAP Smart Business key performance indicators (KPIs)
available for contracts? Note: There are 3 correct answers to this question.

A. Value contract consumption


B. Conditions by contract
C. Unused contracts
D. Contract release orders
E. Contract leakage
Answers A C E

14 | P a g e
SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.1

Question. 51 (Correct)
You want to prevent a specific material from being ordered from a specific
supplier. What must you do?

A. Create an entry in the source list with a blocking indicator.


B. Create a blocking entry in the purchasing info record.
C. Create a quota arrangement entry with a quantity of zero.
D. Create a blocking entry in the supplier master record.
Answers A
Question. 52
Which of the following business partner roles are required to execute a
procurement process? Note: There are 2 correct answers to this question.

A. Contact Person on purchasing organization level


B. FI Vendor on company code level
C. Supplier on purchasing organization level
D. Supplier on purchasing group level
Answers B C

Question. 53 (Correct)
Supplier A should automatically be proposed as the primary source for a
specific material. What options do you have? Note: There are 2 correct
answers to this question.

A. Use the Regular Supplier indicator in the info record.


B. Use a source list and mark the supplier as fixed.
C. Set the Regular Supplier indicator in the business partner master record.
D. Enter the supplier as the primary source in the material master record.
Answers A B

Question. 54 (Correct)
Which of the following activities is a prerequisite to enable partner role
determination in purchasing documents?

A. Assign a partner role to relevant purchasing document types.


B. Assign a partner schema to relevant arrangement types.
C. Assign a partner schema to relevant account groups.
D. Assign a partner schema to relevant purchasing document types.
Answers D

Question. 55 (Correct)
Which of the following are features of a scheduling agreement? Note:
There are 3 correct answers to this question.

15 | P a g e
SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.1

A. A scheduling agreement can be used for a consignment process.


B. Item category M (Material Unknown) can be used in a scheduling agreement.
C. A material master record is optional in a scheduling agreement item.
D. Scheduling agreement delivery schedule lines can only be created manually.
E. A scheduling agreement item is always plant specific.
Answers A C E

Question. 56 (Correct)
In which of the following business transactions will you get an error
message if automatic account determination has been set up incorrectly?
Note: There are 3 correct answers to this question.

A. Posting of a material price change


B. Goods issue of a valuated material
C. Goods receipt of consignment stock
D. Goods receipt of a valuated material
E. Stock transfer from a storage location to another storage location
Answers A B D

Question. 57 (Correct)
You want to create a purchase order with reference to a purchase
requisition. What controls the linkage between the line item of your
purchase order and the purchase requisition?

A. Document type
B. Document category
C. Account assignment category
D. Item category
Answers A

Question. 58 (Correct)
What are some key features of the SAP Smart Business key performance
indicator (KPI) tiles used for purchasing analytics? Note: There are 2
correct answers to this question.

A. Each tile represents a set of actionable cards.


B. Chart snippets on a tile are updated after each start of the evaluation.
C. The tiles show key information that is updated in real time.
D. Numbers on the tiles can have different colors for different alert
thresholds.
Answers C D

16 | P a g e
SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.1

Question. 59 (Correct)
What must you consider when defining purchasing organizations? Note:
There are 2 correct answers to this question.

A. Each purchasing organization has its own supplier master data.


B. Each purchasing organization has its own info records.
C. Each purchasing organization has its own material master data.
D. Each purchasing organization has its own purchasing groups.

Answers A B
Question. 60
You want to procure material from another plant. What purchasing
instrument would you use?

A. Warehouse transfer request


B. Warehouse transfer order
C. Standard purchase order
D. Stock transport order
Answers D

Question. 61 (Correct)
Which of the following are features of a subcontracting procurement
process? Note: There are 3 correct answers to this question.

A. You can assign a subcontracting order item to an account.


B. You must create a subcontracting info record before you can order a
material by subcontracting.
C. You can maintain components to be provided in a bill of material.
D. You can have subcontracting purchase requisitions created by MRP.
E. You can post a non-valuated goods receipt for a subcontracting order item.
Answers A B C

Question. 62
Which organizational assignment is mandatory for external procurement?

A. Plant - Purchasing Group


B. Company Code - Purchasing Organization
C. Plant - Purchasing Organization
D. Reference Purchasing Organization - Purchasing Organization
Answers C

Question. 63

17 | P a g e
SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.1

A supplier delivers material to your warehouse; however, you are only


obliged to pay the supplier once you have withdrawn the stock. Which
procurement process would you implement for this purpose?

A. Standard
B. Third-party
C. Consignment
D. Stock transfer

Answers C

Question. 64 (Correct)
You procure finished goods from a supplier. The supplier manufactures
the product using components shipped from your company. Which process
do you use for this scenario?

A. Subcontracting
B. External processing
C. Standard procurement
D. Third-party procurement
Answers A

Question. 65 (Correct)
At what level do you maintain the purchasing group in the material
master?

A. Purchasing organization
B. Plant
C. Company code
D. Client
Answers A C D

Question. 66 (Correct)
What logic does the system use during PO creation to propose a valid price
when using an info record? Note: There are 2 correct answers to this
question.

A. The system always proposes the price from the last purchase order whose number was
copied into the info record.
B. The system always proposes the price stored at purchasing organization level, if available.
C. If a valid plant-specific price exists, it is proposed when a purchase
order is created for the corresponding plant.

18 | P a g e
SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.1

D. If there are NO valid conditions maintained in the info record, the


system can propose the price from the last purchase order.
Answers C D

Question. 67
Your company uses the classic release procedure for purchasing
documents. For which configuration object must approvers have the
appropriate authorization?

A. Release indicator
B. Release group
C. Release strategy
D. Release code
Answers D

Question. 68 (Correct)
You procure some materials exclusively by consignment. You want
material requirements planning (MRP) to create consignment purchase
requisitions assigned to a supplier, instead of normal purchase requisitions
for these materials. What must you do for each of these materials? Note:
There are 2 correct answers to this question.

A. Maintain a default storage location for external procurement in the material master record.
B. Create at least one source of supply for consignment.
C. Set a special procurement type for consignment in the material master
record.
D. Set a special MRP group for consignment in the material master record.
Answers B C

Question. 69 (Correct)
How does SAP Fiori achieve the role-based design principle? Note: There
are 2 correct answers to this question.

A. Complex transactions are split into several apps that correspond to a


user's role.
B. End users get all the information and functions they need for their daily work.
C. Navigation, personalization, and application configuration are limited to
ensure consistency across user roles.
D. The application interface adapts to the size and device used by the user.
Answers A C

Question. 70

19 | P a g e
SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.1

You are entering a supplier invoice for a purchase order that has been
delivered. What information can you use as a reference to post the invoice?
Note: There are 3 correct answers to this question.

A. Purchase order number


B. Purchase requisition number
C. Delivery note number
D. Material document number
E. Bill of lading number

Answers A C E

Question. 71 (Correct)
In the standard system, a controllable system message is shown when a
user creates a purchase order with a delivery date in the past. What must
you configure to allow such purchase orders to only be created by
authorized users?

A. Copy the system message to a new version, set it as a warning message, and assign the
version with user parameter MSV to the non-authorized users.
B. Copy the system message to a new version, set it as a warning message,
and assign the version with user parameter MSV to the authorized users.
C. Copy the system message to a new version, set it as an error message, and assign the
version with user parameter MSV to the authorized users.
D. Copy the system message to a new version, set it as an error message, and assign the
version with user parameter MSV to the non-authorized users.
Answers B

Question. 72 (Correct)
Which purchasing organization assignments can you make in Customizing
for the enterprise structure? Note: There are 3 correct answers to this
question.

A. One purchasing organization to one company code


B. Several purchasing organizations to one purchasing group
C. One purchasing organization to several company codes
D. Several purchasing organizations to one company code
E. One purchasing organization to several plants across company codes
Answers A D E

20 | P a g e
SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.1

Question. 73 (Correct)
Your purchasing department is working with scheduling agreements. What
can you do using release creation profiles? Note: There are 3 correct
answers to this question.

A. You can control the periodicity of release creation using release creation
profiles.
B. You can create plant-specific release creation profiles in Customizing.
C. You can enter a release creation profile in the material master data.
D. You can assign a specific confirmation control key to a release creation profile.
E. You can enter a release creation profile in the master data of a supplier.
Answers A B E

Question. 74 (Correct)
You are posting a goods receipt without a corresponding purchase order
(PO) in the system. Which of the following are prerequisites for automatic
generation of the PO at the time of goods receipt? Note: There are 3 correct
answers to this question.

A. Automatic purchase order generation is activated for the movement


type in Customizing.
B. The goods receipt to be posted is intended for consumption.
C. A valid purchasing info record must exist for the material and supplier combination.
D. A central purchasing organization is assigned to the plant in
Customizing.
E. The delivered material is a valuated stock material.
Answers A D

Question. 75 (Correct)
Which of the following options are available to block an invoice for
payment? Note: There are 3 correct answers to this question.

A. Set up automatic blocking based on user authorization.


B. Set plant-specific tolerance limits for automatic blocking.
C. Set up random automatic blocking.
D. Set a manual payment block at invoice header level.
E. Set up automatic blocking based on the amount.
Answers A D E

Question. 76

21 | P a g e
SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.1

You want to collectively convert assigned purchase requisitions into


purchase orders. How can you do this? Note: There are 3 correct answers
to this question.

A. Use the assignment list.


B. Use the source list.
C. Use the document overview in the Create Purchase Order app (ME21N).
D. Run material requirements planning (MRP).
E. Run the automatic generation of purchase orders.
Answers A C E

Question. 77
You have several valid purchasing info records for one specific material
available in your system. What is the system behavior when you manually
create a purchase requisition?

A. The system will choose the most recent info record.


B. The system will list all valid records and the user needs to select one.
C. The system will choose the info record with the lowest price.
D. The system will choose the info record from the last purchase order.
Answers B

Question. 78
Which lot-sizing procedures are suitable for reorder point planning? Note:
There are 3 correct answers to this question.

A. Monthly lot size


B. Daily lot size
C. Replenish to maximum stock level
D. Lot-for-lot order quantity
E. Fixed order quantity
Answers C D E

Question. 79 (Correct)
How can you prevent a release order from being created in excess of the
target quantity of a quantity contract?

22 | P a g e
SAP S4HANA Sourcing and Procurement (C_TS452_2020)-V1.1

A. You must implement a BAdI to check the target quantity in the contract release order and
prevent release if the quantity exceeds it.
B. If the order quantity exceeds the target quantity, a warning message is
issued. You can set this as an error message in Customizing to prevent
release.
C. If the order quantity exceeds the target quantity, a dialog box opens. You can use a special
authorization to control whether the user may order the excess quantity.
D. The system prevents exceeding the target quantity in a release order. NO additional action
is required from you.
Answers B

Question. 80
You want to implement split valuation functionality. What must you do?
Note: There are 2 correct answers to this question.
A. Customize valuation categories and valuation types.
B. Assign valuation types to stock types.
C. Add valuation types to all open purchase order items.
D. Create additional accounting data for the relevant materials.
Answers A D