BICOL RIVER BASIN
STRATEGIES TO REDUCE
FLOODING
DPWH REGIONAL OFFICE V
P RO P O S E D S H O RT - T E R M P L A N FO R B I CO L R I V E R BA S I N
Issues/Problems
P/A/P STATUS
to be addressed
Siltation A. Proposed Dredging/Desilting of Bicol River. • Submitted funding request to DPWH Central Office and
DENR Build Back Better Task Force for the procurement of
additional equipment to undertake the dredging
operations amounting to 3.136 Billion Pesos.
• Still not funded
Damaged Flood Control B. Rehabilitation/Replacement of Flood Gates along • Sent a letter of reiteration to DPWH Central Office for the
Structures the Naga-Calabanga Embankment. funding of the said project and subsequently furnished the
Build Back Better Task Force to fast track the funding
request amounting to 64.1 Million Pesos.
• Still not funded.
FUNDING REQUEST FOR
THE REPLACEMENT OF THE
FORTY (40) FLOOD GATES
FUNDING REQUEST FOR
THE PROCUREMENT OF
THE ADDITIONAL
EQUIPMENT
P RO P O S E D LO N G - T E R M P L A N FO R B I CO L R I V E R BA S I N
Issues/Problems
P/A/P STATUS Remarks
to be addressed
Perennial Flooding A. Proposed Construction of 7 Flood • Included in the FY 2022 Regional Budget Proposal of
Control Projects along Bicol River Basin Region V an initial funding requirement of 150
million each for the Phase I of the seven projects.
• Still not funded.
Siltation B. Proposed Dredging/Desilting of Lake • Required equipment is included in the funding
Bato request for the Bicol River Dredging Operations.
C. Initiatives of the Local Government of • Dredging plans already sent to the Local
Camarines Sur to Undertake Dredging Government of Camarines Sur.
and River Restoration Works near the
Vicinity of the Mouth of Bicol River Basin.
PROPOSED DREDGING
WORKS IN BICOL RIVER
LOCATION OF AREAS FOR DREDGING
CABUSAO CALABANGA
LIBMANAN
NAGA CITY
PAMPLONA
MILAOR
GAINZA MINALABAC Estimated Volume to be
Dredged = 2,131,605 cu.m.
CANAMAN
CAMALIGAN
LAKE BATO
MOUTH OF THE BICOL RIVER
C A B U S A O, L I B M A N A N , A N D C A L A B A N G A , C A M A R I N E S S U R
Photo from
[Link]
Department of Public Works and Highways
DR E DGI NG P L A N
Photo from
[Link]
Department of Public Works and Highways
DREDGING IN LAKE BATO
AREA TO BE
DREDGED
LAKE BATO
Photo from
[Link]
10
Department of Public Works and Highways
DREDGING PLAN FOR LAKE BATO
Photo from
[Link]
Estimated Volume to be
Dredged = 4,625,979.75 cu.m.
Estimated Area to be
Dredged = 4.4 sq. km.
11
Department of Public Works and Highways
REPLACEMENT AND
IMPROVEMENT OF THE
FORTY (40) FLOOD GATES
ALONG THE NAGA-
CALABANGA
EMBANKMENT
Municipality
of Cabusao
Municipality
FLOOD GATES ALONG THE of Libmanan
NAGA-CALABANGA
EMBANKMENT
To Legazpi
To Manila
Daang Maharlika
LOCATION OF FLOOD GATES
1. SABANG
ILAWOD FLOOD
GATES (Calabanga)
2. SABANG
IRAYA FLOOD
GATES
3. BALONGAY (Calabanga)
FLOOD GATES
(Calabanga)
4. PONONG FLOOD
GATES (Magarao)
5. CANAMAN FLOOD
GATES (Canaman)
6. CAMALIGAN
FLOOD GATES
(Camaligan)
P ROP OS E D R E P L AC E M E N T/ I M P ROV E M E N T OF F LOOD G ATES
S A B A N G I L AW O D F LO O D G AT E S ( C a l a b a n g a )
P ROP OS E D R E P L AC E M E N T/ I M P ROV E M E N T OF F LOOD G ATES
S A B A N G I R AYA F LO O D G AT E S ( C a l a b a n ga )
P ROP OS E D R E P L AC E M E N T/ I M P ROV E M E N T OF F LOOD G ATES
B A LO N G AY F LO O D G AT E S ( C a l a b a n ga )
P ROP OS E D R E P L AC E M E N T/ I M P ROV E M E N T OF F LOOD G ATES
P O N O N G F LO O D G AT E S ( M a g a ra o )
P ROP OS E D R E P L AC E M E N T/ I M P ROV E M E N T OF F LOOD G ATES
C A N A M A N F LO O D G AT E S ( C a n a m a n )
P ROP OS E D R E P L AC E M E N T/ I M P ROV E M E N T OF F LOOD G ATES
C A M A L I G A N F LO O D G AT E S ( C a m a l i g a n )
THE SEVEN (7) MAJOR
FLOOD CONTROL
PROJECTS UNDER
FEASIBILITY STUDY AND
DETAILED ENGINEERING
DESIGN (LOCAL)
PROJECT LOCATION
MAP
LIBMANAN-CABUSAO
AREA
Project No. Component
Libmanan-Cabusao
1
Embankment
2 Balatas Retarding Basin
LIBMANAN-CABUSAO
EMBANKMENT
CABUSAO
LIBMANAN
BALATAS RETARDING
BASIN
NAGA RIVER
NAGA CITY
CABUSAO
LIBMANAN
NAGA CITY
100YR FLOOD SIMULATION-LIBMANAN-CABUSAO & NAGA
(PRESENT/EXISTING CONDITION)
CABUSAO
LIBMANAN
FLOOD REDUCTION NAGA CITY
(LIBMANAN-CABUSAO AREA)
ANNUAL CROPS=33.26%
PERRENIAL CROPS=50.42% FLOOD REDUCTION
BUILT-UP AREAS=45.20% (NAGA AREA)
ANNUAL CROPS=54.82%
PERRENIAL CROPS=92.23%
BUILT-UP AREAS=67.32%
100YR FLOOD SIMULATION-LIBMANAN-CABUSAO & NAGA
(WITH PROJECT SCENARIO)
NABUA AREA
Project No. Component
Nabua Ring Dike &
3 Detention Pond w/
Pumping Station
NABUA RING DIKE &
DETENTION BASIN w/
PUMPING STATION
NABUA
RIVER
NABUA
WARAS
RIVER
LAKE BAAO
NABUA
100YR FLOOD SIMULATION-NABUA
(PRESENT/EXISTING CONDITION)
LAKE BAAO
NABUA RING DIKE
FLOOD REDUCTION
ANNUAL CROPS= -1.60%
PERRENIAL CROPS=-21.80%
BUILT-UP AREAS=34.43%
NABUA
100YR FLOOD SIMULATION-NABUA
(WITH PROJECT SCENARIO)
QUINALI-TALISAY AREA
Project No. Component
Quinali Diversion Sediment
4
Basin
5 Quinali-Talisay Embankment
6 Nagasgasan Sediment Basin
San Francisco-Cabilogan
7
Retarding Basin
QUINALI-TALISAY-NAGASGASAN
EMBANKMENT, SEDIMENT BASIN &
RIVER IMPROVEMENT
SAN FRANCISCO-CABILOGAN
RETARDING BASIN
LAKE BATO
POLANGUI
LIBON
OAS
LIGAO CITY
100YR FLOOD SIMULATION
QUINALI-TALISAY-NAGASGASAN-CABILOGAN
(PRESENT/EXISTING CONDITION)
FLOOD REDUCTION
LAKE BATO ANNUAL CROPS=33.26%
PERRENIAL CROPS=50.42%
BUILT-UP AREAS=45.20%
LIBON
POLANGUI
OAS
LIGAO
100YR FLOOD SIMULATION
QUINALI-TALISAY-NAGASGASAN-CABILOGAN
(WITH PROJECT SCENARIO)
UPDATING OF MASTER
PLAN AND FEASIBILITY
STUDY OF FLOOD
CONTROL FOR BICOL
RIVER BASIN PACKAGE 1
(ODA)
SCHEME 1
DIKING
SYSTEM
DIKE
IMPROVEMENT
DREDGING
WORKS
SLUICE /
CULVERT WITH
FLOW
CONTROL
DEVICE FOR
LOCAL RUNOFF
DETENTION
BASINS
INTERCEPTOR
CHANNEL
SABO WORKS
REQUEST FOR FEASIBILITY
STUDY AND DETAILED
ENGINEERING DESIGN OF THE
DIVERSION CHANNELS FOR
THE THREE MAJOR LAKES OF
THE BICOL RIVER BASIN
SAN MIGUEL BAY
LAGONOY GULF
LAKE BAAO
LAKE BUHI
LAKE BATO
RAGAY GULF
LAKE BATO
RAGAY GULF
LAKE BAAO
RAGAY GULF
LAGONOY GULF
LAKE BUHI
End of Presentation.
Thank you for listening!