PROJECT CTRL# REMARKS:
SITE ADDRESS REFERENCE
OWNER DESIGNER
SUBJECT DATE
MATERIAL COST LABOR/EQUIPMENT COST
SCOPE OF WORK AND DESCRIPTION QTY UNIT COST/UNIT AMOUNT UNIT COST AMOUNT TOTAL
Annex A : Estimate / Quotation
1.00 GENERAL REQUIREMENTS
2.01.01 Dismantling of Unnecessary Structures 1.00 lot ₱ - ₱ - ₱ 5,000.00 ₱ 5,000.00 ₱ 5,000.00
2.01.02 Dismantling of Existing Floor Tiles 35.00 lot ₱ 150.00 ₱ 10,000.00 ₱ 450.00 ₱ 15,750.00 ₱ 25,750.00
SUBTOTAL OF SITE PREPARATION WORKS ₱ 10,000.00 ₱ 20,750.00 ₱ 30,750.00
3.00 CIVIL WORKS
3.03 CEILING FIINISH
CF1 - PVC Ceiling Panels - 200mm x 2900mm "White" (OSM) (Ceiling faming
3.03.01 30.00 sqm ₱ 1,100.00 ₱ 33,000.00 ₱ 1,200.00 ₱ 36,000.00 ₱ 69,000.00
included )
Page 1 of 2
SCOPE OF WORK AND DESCRIPTION QTY UNIT COST/UNIT AMOUNT UNIT COST AMOUNT TOTAL
CF2 - PVC Ceiling Panel Seamless - 200mm x 2900mm "Light wood texture" (OSM)
3.03.02 3.50 sqm ₱ 1,100.00 ₱ 3,850.00 ₱ 600.00 ₱ 2,100.00 ₱ 5,950.00
(Ceiling faming included )
3.04 STAIR WORKS - "Refurbishing Only" 2.00 lot ₱ 3,000.00 ₱ 6,000.00 ₱ 10,000.00 ₱ 20,000.00 ₱ 26,000.00
3.05 DRY WALL
6" Thk Drywall on 9mm thk fiber cement board partition by James Hardie w/
3.05.01 6.20 sqm ₱ 1,200.00 ₱ 7,440.00 ₱ 500.00 ₱ 3,100.00 ₱ 10,540.00
aluminum studs
3.06 MASONRY AND REPAIR WORKS - for uneven surfaces and Repair 1.00 lot ₱ 10,000.00 ₱ 10,000.00 ₱ 10,000.00 ₱ 10,000.00 ₱ 20,000.00
SUBTOTAL OF CIVIL WORKS ₱ 60,290.00 ₱ 71,200.00 ₱ 131,490.00
4.00 BUILT-IN WORKS
Information Desk (open leg space at the back of the counter
4.01 OSM OSM OSM OSM - OSM OSM
only)(OSM)
SUBTOTAL OF BUILT-IN WORKSKS ₱ - ₱ - ₱ -
5.05 MISCELLANEOUS ELECTRICAL WORKS/TESTING & COMMISSIONING 1.00 lot ₱ - ₱ - ₱ 15,000.00 ₱ 15,000.00 ₱ 15,000.00
SUBTOTAL OF ELECTRICAL WORKS ₱ - ₱ 15,000.00 ₱ 15,000.00
6.00 MECHANICAL WORKS
6.01 Installation of Split type AC (OSM) 2.00 set OSM OSM OSM OSM OSM
SUBTOTAL OF MECHANICAL WORKS ₱ - ₱ - ₱ -
7.00 PLUMBING WORKS
7.03 Others 1.00 set - - 5,000.00 ₱ 5,000.00 ₱ 5,000.00
SUBTOTAL OF PLUMBING WORKS ₱ - ₱ 5,000.00 ₱ 5,000.00
8.01 FIRE PROTECTION (OSM) OSM OSM OSM OSM OSM OSM OSM
SUBTOTAL OF FIRE PROTECTION ₱ - ₱ - ₱ -
9.01 TOTAL DIRERCT COST #REF!
GRAND TOTAL #REF!