0% found this document useful (0 votes)
27 views2 pages

Construction Estimate and Quotation

The document outlines a project estimate and quotation for construction work, detailing various tasks such as dismantling structures, civil works, built-in works, electrical, mechanical, plumbing, and fire protection. It includes quantities, unit costs, and total amounts for each task, with a subtotal for site preparation and civil works. The grand total and direct costs are indicated as '#REF!', suggesting incomplete calculations.

Uploaded by

Oner Del Rosario
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views2 pages

Construction Estimate and Quotation

The document outlines a project estimate and quotation for construction work, detailing various tasks such as dismantling structures, civil works, built-in works, electrical, mechanical, plumbing, and fire protection. It includes quantities, unit costs, and total amounts for each task, with a subtotal for site preparation and civil works. The grand total and direct costs are indicated as '#REF!', suggesting incomplete calculations.

Uploaded by

Oner Del Rosario
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

PROJECT CTRL# REMARKS:

SITE ADDRESS REFERENCE


OWNER DESIGNER
SUBJECT DATE
MATERIAL COST LABOR/EQUIPMENT COST
SCOPE OF WORK AND DESCRIPTION QTY UNIT COST/UNIT AMOUNT UNIT COST AMOUNT TOTAL
Annex A : Estimate / Quotation
1.00 GENERAL REQUIREMENTS
2.01.01 Dismantling of Unnecessary Structures 1.00 lot ₱ - ₱ - ₱ 5,000.00 ₱ 5,000.00 ₱ 5,000.00
2.01.02 Dismantling of Existing Floor Tiles 35.00 lot ₱ 150.00 ₱ 10,000.00 ₱ 450.00 ₱ 15,750.00 ₱ 25,750.00
SUBTOTAL OF SITE PREPARATION WORKS ₱ 10,000.00 ₱ 20,750.00 ₱ 30,750.00

3.00 CIVIL WORKS

3.03 CEILING FIINISH

CF1 - PVC Ceiling Panels - 200mm x 2900mm "White" (OSM) (Ceiling faming
3.03.01 30.00 sqm ₱ 1,100.00 ₱ 33,000.00 ₱ 1,200.00 ₱ 36,000.00 ₱ 69,000.00
included )

Page 1 of 2
SCOPE OF WORK AND DESCRIPTION QTY UNIT COST/UNIT AMOUNT UNIT COST AMOUNT TOTAL

CF2 - PVC Ceiling Panel Seamless - 200mm x 2900mm "Light wood texture" (OSM)
3.03.02 3.50 sqm ₱ 1,100.00 ₱ 3,850.00 ₱ 600.00 ₱ 2,100.00 ₱ 5,950.00
(Ceiling faming included )

3.04 STAIR WORKS - "Refurbishing Only" 2.00 lot ₱ 3,000.00 ₱ 6,000.00 ₱ 10,000.00 ₱ 20,000.00 ₱ 26,000.00

3.05 DRY WALL

6" Thk Drywall on 9mm thk fiber cement board partition by James Hardie w/
3.05.01 6.20 sqm ₱ 1,200.00 ₱ 7,440.00 ₱ 500.00 ₱ 3,100.00 ₱ 10,540.00
aluminum studs
3.06 MASONRY AND REPAIR WORKS - for uneven surfaces and Repair 1.00 lot ₱ 10,000.00 ₱ 10,000.00 ₱ 10,000.00 ₱ 10,000.00 ₱ 20,000.00

SUBTOTAL OF CIVIL WORKS ₱ 60,290.00 ₱ 71,200.00 ₱ 131,490.00

4.00 BUILT-IN WORKS

Information Desk (open leg space at the back of the counter


4.01 OSM OSM OSM OSM - OSM OSM
only)(OSM)
SUBTOTAL OF BUILT-IN WORKSKS ₱ - ₱ - ₱ -

5.05 MISCELLANEOUS ELECTRICAL WORKS/TESTING & COMMISSIONING 1.00 lot ₱ - ₱ - ₱ 15,000.00 ₱ 15,000.00 ₱ 15,000.00

SUBTOTAL OF ELECTRICAL WORKS ₱ - ₱ 15,000.00 ₱ 15,000.00

6.00 MECHANICAL WORKS

6.01 Installation of Split type AC (OSM) 2.00 set OSM OSM OSM OSM OSM
SUBTOTAL OF MECHANICAL WORKS ₱ - ₱ - ₱ -

7.00 PLUMBING WORKS

7.03 Others 1.00 set - - 5,000.00 ₱ 5,000.00 ₱ 5,000.00

SUBTOTAL OF PLUMBING WORKS ₱ - ₱ 5,000.00 ₱ 5,000.00

8.01 FIRE PROTECTION (OSM) OSM OSM OSM OSM OSM OSM OSM

SUBTOTAL OF FIRE PROTECTION ₱ - ₱ - ₱ -

9.01 TOTAL DIRERCT COST #REF!

GRAND TOTAL #REF!