The document outlines various repair and maintenance tasks across multiple branches, including tree cutting, cleaning, and furniture repairs. It also lists specific requirements for the Supa branch and mentions ongoing work and quotations pending for certain tasks. Additionally, it includes remarks and updates on the progress of various maintenance activities.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
96 views3 pages

Repairs & Maintenance Summary

The document outlines various repair and maintenance tasks across multiple branches, including tree cutting, cleaning, and furniture repairs. It also lists specific requirements for the Supa branch and mentions ongoing work and quotations pending for certain tasks. Additionally, it includes remarks and updates on the progress of various maintenance activities.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Repair & Maintance

Sr No Branch Name Name of Work


midc Tree cutting work
Main door lock

barshi Above water tank cleaning work

dharshiv navardev section sfiting above stage

Phaltan Staircase 5 steps repairing


rack for warehouse 13 racks
rack for ethanic section 10 rack

Shirur 25qtty Shevles

Lonand false ceiling work

Karjat rashin Furniture Fextures


light replacement

motibag Main Door Lock


extra shelves for path cosmatic

Bhosari internal lights 88 nos


internal wiring work
fan installation 10 nos
AC Servicing work done 4 nos
main sign board

Godown work Rack layout


wall breaking work
old furniture assmble and send to phaltan and rashin midc
entry work saree to ready made section
all old lights and furniture material require space
old storage unit installation

Pandharpur Genset servicing work


Maintance
Amount Remarks

spoken with nikhil to remove all material above stage

rack ready sagar shifting to phaltan

quotation coming next 2 days ( guljar POP)

WIP
wip

quotation coming evening

ashin midc
Sr No Branch Requirements
1 Supa branch lunch seating ….......
2
3
4
5
6
7
8
9
10
11
12
13
14