The East Central Railway has issued a directive to develop a training module for TrD staff working as TPC due to recent OHE failures and improper operations during fault segregation. Ashida Electronics Pvt. Ltd. is requested to establish a dedicated training setup that will not interfere with the existing SCADA system. The Railway Board emphasizes the need for institutionalized training and refresher courses to address the observed issues with TPC operations.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0 ratings0% found this document useful (0 votes)
55 views2 pages
Training Module For TRD Staff Working As TPC
The East Central Railway has issued a directive to develop a training module for TrD staff working as TPC due to recent OHE failures and improper operations during fault segregation. Ashida Electronics Pvt. Ltd. is requested to establish a dedicated training setup that will not interfere with the existing SCADA system. The Railway Board emphasizes the need for institutionalized training and refresher courses to address the observed issues with TPC operations.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
East Central Railway —
SD. flee. Engineer (TRO),
DRM office, Dhanbad,
P.O. Dist-Dhanba. £26001,
No. ELD/378/18 Dhanbad, dtd: 14/02/2025
Ashida Electronics Pvt. Ltd.,
Ashida House, Plot No. 308,
Road No.-21, Wagle Industrial Estate,
Thane-400604, Mumbai
Sub.: Training module for TrD staff working as TPC.
Ref.- Railway Board letter No. 2024/EEM/TrD/148/1.
In view of the recent OHE failure, the Railway Board has noted multiple
unwanted operations by TPC during fault segregation, which is a serious concern.
hence, the Board has advised the development of a training moduie for TrD staff
working as TPC.
Accordingly, you are requested to set up a dedicated monitor/computer for
training and testing purposes. This setup should be independent and must not affect
the SCADA system in operation.
Encl- As above ie
ov
ay
Sr, Divl, Elect\ Engineer (TRD)
E.C. Railway, Dhanbad.
n
Myo
Sr. Div, Elect. Engineer (TRD)
E.C. Railway, Dhanbad.
fs
Copy to: -
PCEE/HIP: - for necessary information please.GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No. 2024/EEM/TrD/148/1 ‘New Dethi, Dated: 31.01.2025
DG, cipal Chief Electrical Engineers,
IRIEEN, All Zonal Rattways
Nasik
Sub: Training module for TrD staf working ax TPC,
Jn recent OHE failures over IR, it has been observed that TPC staff are not provided with
Institutionalized training covering initial training as well as refresher courses, Cases of false sequence
of operation and multiple unwarranted operations has been observed in TPC working in fault
segregation during breakdowns.
Therefore, it has been decided to build proper training framework for TPC officials. It is
Aivised to take following measures accordingly:
i IRIEEN is advised to make
system TPC
preioed
(Akash Sharma)
Director (TrD)
Phone: 011-47845421
: esta
Copy to: PED/TI, RDSO, Lucknow - for kind information and providing suitable inputs to IRIEEN
for TPC training module.
* oper
Room No.-154-B, Rail Bhawan. Raisina Road. New Delhi- 110001