CHECKLIST FOR QUALITY
ACTIVITY: EXCAVATION
Project: Date:
Location: [Link] FABS-CL-EE -04
[Link] R0
NOTE:- PleaseRappropriate box or enter readings as per requirements
Sl. No. To be checked YES NO NA Remarks/ Clarifications
Name,date and number of the
1
drawing
PRE-EXECUTION CHECKS
Are the latest "Good for
2 [ ] [ ] [ ]
Construction" drawings available?
Is the soil investigation report kept
3 [ ] [ ] [ ]
on-site?
4 Have TBMs been established? [ ] [ ] [ ]
Storage or intermediary storage
5 identified for superficial mass of [ ] [ ] [ ]
earth excavated?
6 Are access routes available? [ ] [ ] [ ]
7 Are trees present? [ ] [ ] [ ]
Is it possible to deploy larger
8 [ ] [ ] [ ]
excavation machinery?
Is a ramp for vehicular movement
9 [ ] [ ] [ ]
required?
Has a grid line marking been done
10 [ ] [ ] [ ]
at appropriate spacing?
Are safety measures required for
11 the neighbouring construction [ ] [ ] [ ]
activities?
Are all the requirements met for
12 [ ] [ ] [ ]
maintaining dewatering?
Does the depth to be excavated
13 included the depth of the [ ] [ ] [ ]
construction soling?
Has the consultant inspected the
14 site before commencement of [ ] [ ] [ ]
work?
15 Are the required tools available? [ ] [ ] [ ]
CHECKLIST FOR QUALITY
CHECKS DURING EXECUTION
Has the Block Level Register been
16 [ ] [ ] [ ]
maintained?
Are the layout & alignment as per
17 [ ] [ ] [ ]
drawings?
Has the required depth of cut been
18 [ ] [ ] [ ]
achieved?
If excavation is beyond 1.25m are
19 [ ] [ ] [ ]
there steps provided?
Has proper shoring and struting
20 [ ] [ ] [ ]
been done in loose soils?
Is the excavation barricaded at a
21 [ ] [ ] [ ]
distance of 1 meter?
Has the point of height indicator
22 [ ] [ ] [ ]
been installed?
Are the marking pillars safely
23 barricaded or protected to avoid [ ] [ ] [ ]
any disturbance of marking points?
If blasting is necessary, is it being
24 carried out by a certified, licenced [ ] [ ] [ ]
contractor?
Checked by: Approved by:
Sign Sign
Name Name
Date Date