Objective: -To work in a dynamic growth-oriented environment with desire to add Continuous
value to growth and development of organization.
Skill in Electrical Project:- Project Management, Site execution & supervision, QA/QC Inspection,
AMI Smart metering projects, Exert in cable laying, erection and commissioning of electrical
equipment in substation, site survey, preparation of BOQ/DPR, MS Project report preparation, Business
development activities, vendor development, Drawing approval, BOM, coordination quality and safety,
Experience working with government officials knowledge in ROW, Land Clearances activities,
Liaising with government department
Skill in Solar Projects: - Hands-on experience in site survey, Pre-dispatch material inspection, solar
power plant Module Installation, inverter connection, and testing and commissioning. Create electrical
single line diagram, string diagram & plant layout for solar electric system.
Preferred Sector: - Power Distribution project, Erection & Commissioning,132/ 33/11 KV(AIS/GIS)
Power-Sub-Station (PSS), Li-Lo installation, Underground Cabling laying, SCADA System, Quality
Control & Assurance, Smart meter installation work Electrical Billing, Tendering, purchases, vendor
management and SAP in MM and PP module.
WORK EXPERIENCE
Total Experience :- 8 Yrs.
Current Designation: - Assistant Manager ( State Quality Head) April 2023 – Present
Current Employer: - Intellismart Infrastructure Ltd ( A JV of EESL & NIIF, It's a PSU
Company)
Location: -Patna, Bihar.
Detailed Tasks Assigned: -
Working as a state quality head for handling smart meter and ensure the full quality compliances
work at site during meter installation.
To lead regular review with AMI Implementing partners for projects priorities as per plan. And
exhibit zero tolerances.
Ensure the corporate guidelines, the implementation, updating, review and quality field auditing
and data quality.
Quality assurance and quality control (QA & QC) Objectives and operational status ensure high
quality process.
Day to day monitoring and coordination with system integrator for resolution of IT related SLA
gaps.
Coordination with DISCOM agencies for integration pf legacy system.
Ensuring quality standards CI and MI.
Developing quality process and procedures for smart meter survey and installation.
Conducting quality audits and inspections.
Implementing corrective and preventive actions.
Performance monitoring and reporting.
Ensuring daily talk regarding quality work at site.
Providing CI, MI and OCR training for installer and technician of partners.
Current Designation: - Assistant Manager (EB Restoration & Compliance) May 2023 – April 2024
Current Employer: -Indus Towers Limited
Location: -Patna, Bihar.
Detailed Tasks Assigned: -
To provide electricity to unelectrified legacy site.
Installation and commissioning of all electrical equipment like transformer, CT, PT, Isolator,
Circuit-breakers etc,
Underground cable laying in Urban and rural site up to 400Sqmm.
New 11kv line extension work, LT AB Cable stringing work.
Ensuring 100% Digital/Smart Mater installed in running site.
Survey, Estimating, proposal & procurement of material.
Project monitoring, Billing & Capitalization.
Review and verification of ongoing electrification work.
Liaoning with govt electricity Distribution including Bihar & Jharkhand
Ensuring 100% Compliance process of electrification as well as coordination among the inter
department.
Coordination with district administration all over Bihar and Jharkhand with compliance.
Rationalization for site load up to technical requirement.
Responsible for electricity restoration up to disconnection due to various reasons.
Reduction of electricity penalties (MDI, PF, Theft) by running project to reduce them.
Designation: -Project Officer June 2022 – May 2023
Current Employer: -TATA STEEL UISL (Utilities and Infrastructure Services Limited).
Location: -Jamshedpur, Jharkhand.
Detailed Tasks Assigned: -
132 KV bay extension and line charging work, 33kv outdoor s/s erection and commissioning job,
33kv UG Cable laying job (up to 400 sq.mm), 11kv RMU installation work.
Controlling at every stage to ensure high quality construction, erection, commissioning required
system performance is achieve with full compliance to engineering design, sanctioned DPRs. and
drawing, technical specification and other contract documents with use of proper quality materials
within the specified time schedule.
Erection and commissioning of 132/3311kv New Grid Sub-Station and Line.
Township Projects (UG) for better quality of power supply at end of the consumer.
Strengthening and Maintenance of old infrastructure (Line and Sub-Station/CPSS).
Preparation of IMS documentation and master list of files/records.
Smart metering, RMU and CPSS installation.
EPC Costing, New vendor development, Engineering optimization and sourcing strategy.
Coordination with technical Advisors, Consultant’s, Owners and Engineers.
Shut down and GIS coordination and approval.
Material received notes preparation.
Preparation of contractor bills and report.
Knowledge of SAP under MM & PS Module.
Maintaining safety norms Positive isolation and LOTO.
Planning and execution of job for necessary modification of the work Raise DO and PR. Ensuring
the requirement of customers met. With respect to quality and timely response.
Indian Electricity-Rules and State Regulation.
*Implementation of QMS, TPM and others improvement initiatives in work.
Designation: - Project Engineer April 2021 - Mar 2022
Previous Employer: - Voyants Solutions pvt ltd
Client:- Jharkhand Bijli Vitran Nigam Ltd.
Location: - JBVNL HQ, Ranchi,Jharkhand
Project Completed: - JSBAY (Urban, Rural and Industrial) & Metering project
Detailed Tasks Assigned: -
Controlling on-site installation & commissioning activities to ensure completion of project
within the time & cost parameters and effective resource utilization to maximize the output.
Trouble shorting and rectification of work equipment's, modifications, and major repairs
improve equipment efficiency by fault finding.
Laying of underground Cabling of 33 kv, 11 kv and Lt- UG Cable with Pillar Box.
Erection and commissioning of New 33/11 kv Power Sub-Station and Augmentation work of
old 33/11 kv Power Sub-Station.
To Ensure and report about material being used and quality of work executed, conforming to
GTP, Technical specifications, drawing and general terms and condition.
MRHOV and inspection of electrical equipment's / materials at Store.
Identifying areas of bottlenecks /breakdowns and taking steps to rectify through application
of troubleshooting tools like root cause analysis.
* Frequent site visits to interact site representative to know the hurdles or any kind of ROW
problems.
Checking and approving layout and detail drawings.
Knowledge of BOQ Preparation and approval process as per LOA.
Preparation of Pole Schedules & Reconciliation for Sub-Contractors and BOM.
Meetings with clients for JMC Certifications and other relevant assignments.
Managing all project related data in digital and hardcopy.
Timely & Accurate report submission to Client and third-party team.
Proper Coordination to Sub contractors and assurance to work Quality.
Survey & BOQ.
Manpower Handling.
Project Closure.
Knowledge of SCADA System for feeder monitoring and load flow analysis.
Designation: - Assistant Electrical Engineer March 2018 - February 2021
Previous Employer: Jharkhand Bijli Vitran Nigam Ltd.
Location: - JBVNL Office, Dumka, Jharkhand
Project Completed: -DDUGJY-12th Plan, DDUGJY New, IPDS, RAPDRP, ATGJY, JSBAY (Urban,
Rural and Industrial), Saubhagya, Metering.
Detailed Tasks Assigned: -
Controlling on-site installation & commissioning activities to ensure completion of project
within the time & cost parameters and effective resource utilization to maximize the output.
Trouble shorting and rectification of work equipment's, modifications, and major repairs to
improve equipment efficiency by fault finding.
Laying of underground Cabling of 33 kv, 11 kv and Lt- UG Cable with Pillar Box.
Erection and commissioning of New 33/11 kv Power Sub-Station and Augmentation work of
old 33/11 kv Power Sub-Station.
To Ensure and report about material being used and quality of work executed, conforming to
GTP, Technical specifications, drawing and general terms and condition.
MRHOV and inspection of electrical equipment's / materials at Store.
Identifying areas of bottlenecks /breakdowns and taking steps to rectify through application
of troubleshooting tools like root cause analysis.
Frequent site visits to interact site representative to know the hurdles or any kind of ROW
problems.
Checking and approving layout and detail drawings.
Knowledge of BOQ Preparation and approval process as per LOA.
Preparation of Pole Schedules & Reconciliation for Sub-Contractors and BOM.
Meetings with clients for JMC Certifications and other relevant assignments.
Managing all project related data in digital and hardcopy.
Timely & Accurate report submission to Client and third-party team.
Proper Coordination to Sub contractors and assurance to work Quality.
Survey & BOQ.
Manpower Handling.
Project Closure.
Knowledge of SCADA System for feeder monitoring and load flow analysis.
Also working for JBVNL Departmental work including Vigilance and Revenue
collection work.
Attained electricity power theft RAID activities.
Preparation of enquiry report, examining existing procedure and elimination of
malpractices to ensure integrity.
Provide field level smooth support to customer.
Attained revenue collection monthly camp.
Erection and commissioning of Lt-line using bear conductor, Arial bunch cable of 95
square mm and 55 square mm.
Erection and commissioning of Distribution Transformer of 25kva, 63kva, 100kva,
20 kva, 500kva in Rural and Urban Area.
Handling of normal and emergency conditions like major tripping of line, Power
Transformer etc. for efficient load transfer.
Power supply of Domestic consumer and its new connection at single phase ( 5-30
amps). Erection of 33/11kv Pss equipment's like Power Transformer, Vcb, Isolator,
Capacitor Bank, Control Panel etc.
Erection and commissioning of HT-Line up to 33kv.
Proper coordination with JEEs and TKCs for assurance to work quality on the Rural
Electrification works.
Responsible for reducing the AT&C Losses.
Responsible for 100%-meter installation in Rural Area and replace the defective meter
in both Rural and Urban Area (1.23 Lac).
Monitoring and Improving performance in the field of Revenue as well as Billing
Efficiency.
Responsible for spot Billing.
Responsible for Improving Billing & Collection Efficiency in Rural Areas.
In above all work extensive electrification work done in Un-electrified village and
maintenance of Rural & Urban area for better and quality power supply.
Designation: -Site Engineer October 2016 to February 2018
Previous Employer: - MTCPL
Location: - Deoghar, Jharkhand.
Client:- Jharkhand Bijli Vitran Nigam Limited
Name of Project:- AGJY & TMGKY
JOB Profile: -
Installation and commissioning of meter (Household and Farming consumers)
Stringing of Lt AB Cable, HT- AB Cable,11 Kv Conductor.
Single phase meter installation under AGJY & TMGKY.
Pole erection 8- meter, 9- meter PSC, Rail-pole, H-beam pole.
Labor management work planning, scheduling.
JMC with client and PMA.
33/11kv Pss maintenance like replacement of Vcb, Isolator, LA, Earthling etc.
Documentation of materials.
Project Completed: -
SI.No. Company Name Project Name Project Cost
1 M/s Sterling & Wilson Pvt. Ltd JSBAY Industrial 180 Cr.
2 M/s Jakson Ltd. JSBAY Urban and Rural 120 Cr.
3 M/s NCC Limited DDUGJU 410 Cr.
4 M/s L&T Ltd. DDUGJY New 210 Cr.
5 M/s Pace Power Ltd DDUGJY 12th Plan 121 Cr.
6 M/s Offshore Infrastructure Ltd IPDS 150 Cr.
7 M/s NCC Limited Saubhagya (Metering) 41 Cr.
8 M/s Indo-nabin Project Ltd. AGJY & TMGKY (Metering) 38 Cr.
Total 1270 Cr.
Key Qualifications: -
Work as key-role as Project Management & Monitoring the field activities for the best way to work for
completion, Manage the Manpower in a planned way for the Site Work. A routine
works of doing meetings with the discom officials & with their top management for better
execution of plan.
Academic Information: -
Qualification Institute Year of Passing Board/University Marks
B.Tech. (E.E.) DAV INSTITUTE OF 2016 N.P.U 70.01%
ENGINEERING AND
TECHNOLOGY
12th A N COLLEGE 2012 B.S.E.B. 73.00%
10th R MITRA SCHOOL 2010 J. A. C 62.06%
Skills: -
Operating System: -Window-07 & Latter.
Language: -C, IMS, MIS and PMP Certification.
MS OFFICE.
Personal profile: -
Date of Birth : 10/05/1994
Father Name : Late.Ganesh Prasad Singh
Mother Name : Asha Devi
Gender : Male
Nationality : Indian
Language know : Hindi & English
Marital Status : Married
Permanent Address : Baidhnath Colony, Near- Hindividyapith, Deoghar
Dist- Deoghar (Jharkhand)
Pin-814112
Declaration: -
I, Deepak Kumar Singh, do solemnly affirm that the statements given above are true to the best of my
knowledge.
Date:- Deepak Kr Singh