The document outlines various aspects of software development, including use case diagrams, class types (Boundary, Controller, Entity), and MVC architecture. It discusses the role of Business Analysts in the Waterfall model and highlights conflict management techniques, particularly the Thomas-Kilmann model. Additionally, it lists reasons for project failure, challenges faced by Business Analysts, document naming standards, and essential do's and don'ts for effective business analysis.

Uploaded by

prathima.reddy.p
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views18 pages

Capstone Project3 Part1

The document outlines various aspects of software development, including use case diagrams, class types (Boundary, Controller, Entity), and MVC architecture. It discusses the role of Business Analysts in the Waterfall model and highlights conflict management techniques, particularly the Thomas-Kilmann model. Additionally, it lists reasons for project failure, challenges faced by Business Analysts, document naming standards, and essential do's and don'ts for effective business analysis.

Uploaded by

prathima.reddy.p
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Q1.

Draw a Use Case Diagram

Q2: Derive Boundary Classes, Controller classes, Entity Classes


Boundary class:
The Boundary class is a class that is the boundary of the system and other system or user (which
is actor in the use case diagram).
The following are the features of the Boundary class.
1. This class is easier to change to than the Entity and Controller class.
2. The attribute of this class and screen layout are defined at the basic design.
3. In a class diagram, there are cases where the stereotype (<<boundary>>) is added.
4. In a class diagram, there are cases that are shown by the following icon

Controller classes:
The followings are the feature of the Controller class.
This class has few attributes.
In a class diagram, there are cases that the stereotype (<<control>>) is added.
This class is a class to achieve use cases in the Use case diagram.
In a class diagram, there are cases that are shown by the following icon

Entity Classes:
The Entity class is a class that has data. The "E" of the ER diagram means "Entity".
The following are the features of the Entity class:
There are many cases that these objects of this class are perpetuated in DB.
The extraction of the class is like ER diagram2.
This class is related to the DOA (Data-oriented approach).
The module cohesion of this class is high and is not easy to be changed.
In a class diagram, there are cases that the stereotype (<<entity>>) is added.
In a class diagram, there are cases that are shown by the following icon
Q3. Place these classes on a three tier Architecture. -

Q4: Explain Domain Model for Customer making payment through Net Banking
A domain model is a conceptual model of the domain that incorporates both behavior and data.
It is a system of abstractions that describes selected aspects of a sphere of knowledge,
influence, or activity. The model then can be used to resolve problems related to that domain.
The domain model is represented of meaningful real-world concepts pertinent to the domain
that need to be modeled in software. The concepts include data involved in business and rules
the business uses in relation to that data.
A domain model leverages natural language of the domain. It generally uses the vocabulary of
the domain, thus allowing a representation of the model to be communicated to non-technical
stakeholders. It should not refer to any technical implementations such as database or software
components that are being designed
Q5: Draw a sequence diagram for payment done by Customer Net Banking

Q6: 6. Explain Conceptual Model for this Case


Conceptual modeling is a representation of the business model we have. There are entities, and
their relationships among them based on which this is created. This is a Representation of a
system which will be created, and this is not a language used to communicate with technical
team.
Entities
In our case study, since customer is initiating online payment through net banking
following entities will be there. Bank, Customer, Net banking system of a Bank, Final beneficiary
(Customer’s customer).
Relationships
Customer will be initiating payment with multiple beneficiaries, so it will be One to Many
Relationships. Bank System will interact with Customer, so it will be one to one relationship.
Bank will be facilitating payment for multiple customers; hence it will be One to May
Relationship. Based on above Entities and Relationships we will be creating a Entity Relationship
diagram, which will be used as a representation to take sign off from the client
Q7. What is MVC architecture? Explain MVC rules to derive classes from use case diagram and
guidelines to place classes in 3-tier architecture
The Model-View-Controller (MVC) is an architectural pattern that separates an application into
three main logical components: the model, the view, and the controller. Each of these
components are built to handle specific development aspects of an application. MVC is one of
the most frequently used industry-standard web development framework to create scalable and
extensible project

Model:
It represents the business layer of application. It is an object to carry the data that can also
contain the logic to update controller if data is changed. All Model Classes are represented as
Entity Classes.
View:
It represents the presentation layer of application. It is used to visualize the data that the
model contains. All View classes are represented as Boundary classes/Form Class. Actor Speaks
to the system via boundary class and vice versa.
Controller:
It works as a data transmitter between the model and view. It is used to manage the
flow of application, i.e., data flow in the model object and to update the view whenever data is
changed. Controller class is working based on the user’s command. Understands the
command/request given by the actor/user through boundary/form class
MVC Architecture Rules:
 Combination of One actor and a use case results in one boundary class.
 Combination of Two actors and a use case results in two boundary class.
 Combination of Three actors and a use case results in three boundary class.
Note: Only one primary actor is to be considered with a use case.
 Use case will result in a controller class.
 Each actor will result in one entity class.
Guidelines to place identified MVC classes in a 3 Tier Architecture:
 Place all entity classes in DB layer
 Place Primary actor associated Boundary class in Application Layer
 Place Controller class in application layer.
 If Governing body influence or reusability is there with any of the remaining Boundary
class place them in Business Logic layer or else place them in Application layer

Q8. Explain BA contributions in project (Waterfall Model – all Stages)


A waterfall model is very old and traditional model in IT industries. It is a progressive
implementation of the projects which is divided into different phrases of SDLC.
Business Analyst will verify if the product is delivered as per the requirements, and it is meeting
the business need. Maintenance: Once the implementation is done the team has to give
support by installing patches, handling change requests, etc
Stages in Waterfall Model are as follows:
 Requirement Gathering and Analysis
 Designing
 Coding
 Testing
 Deployment
 Maintenance
Requirement Gathering and Analysis:
This is the initial stage of the project where an involvement of the BA is. BA is
responsible for preparing BRD document (Business Requirement Document)
Artifacts: Functional Specification Document
Business Requirement Document

Designing:
In this phase the architect will start designing the system based on the
Business analyst inputs and requirement documents. The BA helps him to clear the doubts
about the requirements.
Artifacts: Design Documents
UML diagrams get ready in this phase
Coding:
This phase is quite lengthy as the core development starts in this phase. Developer
starts product development based on the requirement document prepared by the BA.
Developer may ask questions to BA regarding the requirement, and he needs to answer the
questions as and when required.
Artifacts: Code
Testing:
After coding, the testing phase will start, in this phase BA helps the testing team to
understand the requirements so that they will build proper functional test cases. BA has to
review whether the test cases covering the whole functionality.
Artifacts: Test Cases and test results
Deployment:
Once the code is developed and tested, it is ready to deploy in the production environment. The
BA will verify the product is delivered as per the requirements and it is meeting the business
needs.
Artifacts: Implementation Review document
Maintenance:
Once the implementation is done the team has to give support by installing patches, Handling
change requests etc.
A BA is the person who knows every nook and corner of the project. So, every change request
has to be reviewed by him and based on his inputs and reports the team will respond.
Artifacts: User Satisfaction review and change request review.

Q9. What is conflict management? Explain using Thomas – Kilmann technique


Conflict management is the use of techniques to resolve disagreements or control the level of
discord. Conflict occurs whenever people disagree. The disagreement could be over their
perceptions, ideas, values, motivations, or desires. Researchers Kenneth Thomas and Ralph
Kilmann developed a model for resolving conflicts. This model is known as the Thomas-Kilmann
model.
This model is based on two dimensions of conflict management: Assertiveness and Empathy.
Based on these two dimensions, there are five conflict resolution strategies: Competing,
Avoiding, Accommodating, Collaborating and Compromising
Competing:
Competing, the first Thomas-Kilmann conflict mode is assertive and non-
cooperative. It refers to addressing only one’s own concerns at the cost of the concerns of the
other. It is a power-oriented mode—one uses whatever power dynamic seems appropriate to
get a favorable outcome for one self. An individual’s ability to debate, their position in the
hierarchy, or their financial power matters the most.
Competing is defensive—it strictly means standing up for your individual beliefs and simply
trying to win
Accommodating:
According to the Thomas-Kilmann model, the Accommodating mode is both
accepting and cooperative. It is the opposite of competing. While accommodating, the
individual in question neglects their own problems or beliefs to address the problems of the
other party. The element of self-sacrifice is highlighted in this mode. Accommodating typically
involves selfless understanding, generosity and or charity.
At times, accommodating would require you to follow the other person’s orders when you
would not like to do so, or submit to the other’s perspective or decisions
Avoiding:
In the Thomas-Kilmann model, avoiding is both unassertive and uncooperative. The
individual wants to address neither their own problems nor the problems of others. This
ultimately means that they do not want to engage in the conflict at all. Avoiding might be seen
at times as a diplomatic move involving bypassing or ignoring the issue. It could also involve
putting off the issue until the time is favorable, or simply stepping back from an uncomfortable
or hazardous situation
Collaborating:
Collaborating is the most beneficial outcome in the Thomas-Kilmann conflict
model is both assertive and cooperative. This mode is the opposite of avoiding. Collaborating
includes a voluntary effort to work alongside the opposition to find a perfect solution
that wholly addresses the collective problem. Collaborating involves deep-diving into an issue to
locate the critical demands of the concerned individuals or parties. Collaborating between
two or more people might take the form of a quest to understand the ‘why’ of the
disagreement. It involves striving to look for creative answers to interpersonal issues and
enriching yourself from the other person’s insights
Compromising:
The last outcome in the Thomas-Kilmann conflict model falls on the average point on
both the assertiveness and cooperativeness scales. The goal here is to find a mutually
acceptable and robust solution that, in some ways, satisfies both individuals. It comes midway
between competing and accommodating. It addresses an issue more directly than avoiding but
falls short of investigating it with as much depth and rigor as collaborating. In certain situations,
compromising might involve seeking middle- ground solutions, providing concessions, or
looking for a quick solution that provides some way forward from the impasse.

Q10. List down the reasons for project failure


1. Poor planning
 Although sometimes overlooked in importance, lack of planning can make a project
fail.
 Having a successful project depends on properly defining in detail the scope, the
time frame, and each member’s role. This way, you’ll have a route laid out to follow.
2. Inconsistently defined resources
 Let’s be clear: planning shouldn’t be limited to agendas, meetings, and
responsibilities. It should also include human, intellectual, financial, or structural
resources. If these are not consistently determined, deadlines can’t be met, which
can jeopardize the project’s conclusion.
3. Unclear objectives
 Project objectives should be clearly defined, so as time goes by, you’ll know if
you’re doing what’s right or not. Remember that choosing measurable
goals helps you better visualize your progress and helps you see how close
you are to achieving your results.
4. Lack of detail control
 Monitoring is essential for successful projects, even knowing the details of
many projects simultaneously can be very challenging.
 As a result, it’s important to know how your project is going, if it is on
schedule and if the budget is under control. This way, if there are any
divergences from the initial plan, you can still correct them.
5. Lack of transparency
 It’s essential that everyone involved in the projects have complete project
visibility so that it doesn’t fail – not only the project manager, but other team
members too.
 This includes clear communication, good document management, and
transparency about tasks’ status, all of which can be achieved with
centralized, all-digital files.

6. Lack of communication
 Communication is the key to good project management. Without the right
tools and processes to allow interaction among team members and the
project manager from the beginning, efficient communication can seldom be
achieved.
7. Change of direction
 Among the ways projects fail, a very common one is scope creep. This
concept refers to changes requested when the project has already started
which had not been planned before. This is very common when projects are
not appropriately documented and defined beforehand.
8. Unrealistic expectations
 When you want to do something fast, with a limited budget, and a reduced
team, it can really make your project fail. You should be realistic when it
comes to your teams’ capabilities, deadlines, and the resources available –
only then can you obtain the results you want.
9. Lack of monitoring
 Providing a schedule to the team is not enough for a project to be successful.
You should also make sure everything goes as planned. This means
having frequent progress checks or meetings, as well as making adaptations,
when necessary, is essential.
10. Unrealistic due dates
 Planning complex tasks for short due dates is definitely one of the causes for
project failure. It is vitally important to carefully consider how long each
project phase will take, in addition to extra time for unexpected events. This
is the only way to develop a quality project.
11. Poorly assigned roles
 When each team member receives their responsibilities clearly, they will
know what, when, and how to perform their activities without someone
needing to constantly ask for it.

Q11. List the Challenges faced in projects for BA


A BA is responsible for multiple tasks at the same time. From managing the projects,
maintaining client relationships, interacting with stakeholders, and managing project deadlines,
Business Analysts got a lot on their plate. Below are the challenges faced by business analyst.
 Lack of training
 Obtaining Sign-off on requirement
 Coordination between developers and testers
 Conducting meetings
 Preparing effective status reports which satisfies all the project stakeholders.
 Driving client for UAT completion
 People Management (Coordination between different people and different teams)
Business analysts (BAs) face many challenges in projects, including:
 Poor communication
Effective communication is essential for a project's success.
 Conflicts with stakeholders
Stakeholders may have conflicting expectations of what the project will deliver.
 Stakeholder design
Stakeholders may want to dictate how the system should work instead of providing details
about what it should do.
 Changing needs
Nonalignment of goals among stakeholders can lead to changing needs and priorities.
 Inadequate resources
A lack of resources can manifest as inadequate staffing, limited budget, insufficient equipment,
or a lack of required expertise.
 Insufficient knowledge of user needs
A BA may not understand user needs due to unavailability of key stakeholders or time or
resource constraints.
 No accountability
Failure to continuously monitor and communicate project milestones in real time, and budget
performance, dilutes project accountability and responsibility.
 Resistance to change
Staff members may oppose change due to fatigue.

Q12. Write about Document Naming Standards


File Naming Standards are used to save the file with particular name or format. This is important
in Sharing and keeping track of data files. Following are the best standards in Naming
Convention.
1. It should be Named Consistently.
2. File names should be short (<25 characters)
3. Avoid special characters or spaces in a file name.
4. Use Capital and Underscores instead of spaces or slashes.
5. Use date format as per ISO 8601: YYMMDD
6. Include a version number.
7. Write down naming convention.

We must consider following naming conventions:


 Date of Creation
 Short Description
 Work
 Location
 Project name or number
 Sample
 Analysis
 Version Number

Q13. What are the Do’s and Don’ts of a Business analyst


As a Business Analyst we have to follow certain Rules and Regulations, which help us in
improving our productivity as well as quality of work. Following are the Do’s and Don’ts of
Business Analyst.
 Never Say No to client: While client is saying something, we must never interrupt and
say NO to client. As client is expecting us to listen to him and provide the solution to his
problems.
When client is explaining his problem or giving requirements, listen carefully and try to
understand what he/ she is trying to explain, and never say “No” to client affront,
because here client is explaining his problem and he expects some solution from us.

 Never Imagine anything in terms of GUI: We must not imagine the requirements by just
seeing the graphical representation ask the right question to client and get clarity on the
requirements. I.E. As login page may appear the same for all the websites but
Functionality is different.
For example: If you want to login to any website we need to enter correct user id and
password to login the page. Here user id and password is common, but password length
and validations differ from website to website based on the client requirement.

 Question Everything: We must not feel bad to ask questions and should get clarity from
client. We can ask the questions till we get clarity from the client. Sometimes clients may
not tell us the entire requirement until we probe them.
Example: Client will say I need login page. But here you need to ask multiple questions to
client to get clarity. Let us see some sample questions here.
 What are the validations required,
 Terms and conditions are required or not.
 And when this button should be disabled or enabled.
 Which type of error message should be shown on the screen if user enters wrong
password or user id?
 Password length should be how much and all.

 Consult an SME for clarifications in requirements: If the requirement is not clear and you
need more clarity on the requirement, then we can discuss with SME. And ensure to
document the requirements what you discussed with SME and get approval from
solution owner. And explain to him what you understand by discussing with the SME.

 Every problem of client is unique.


Every problem of Client is unique, so talk to the client with a open mind with no
assumptions from your previous experience.

 Do not interrupt the client, when he/she is giving you the problem.
Listen very carefully and completely to the client as well as to the end user and then ask
question, don’t interrupt them in between.

 Maximum try to extract the leads to solution from the client itself.

 Never try to give solutions to client straight away with your previous experience and
assumptions.

 Should not be hurry.


Should not gather the requirements in hurry, conduct a meeting in a convenient time
and take your own time to understand the requirement or gather the requirements.
Because if you are in a hurry to capture the requirement then there is a chance to
misunderstand the requirement, it may lead to project failure. As a Business Analyst you
should be have open mind when you are gathering requirements

 BA should focus on “what” and “when” to develop rather than focus on “how” to
develop.
As a Business Analyst our responsibility is to understand what to deliver and when to
deliver the project, how to develop is the responsibility of development team or
development manager. We need not to concentrate on this part and need not to worry.
Always have a prior discussion with your project manager and sponsor before
conducting a meeting

 Should not miss any requirement


Make sure that you have gathered all the requirements from the stakeholder for your
project, missing out any information can results to unwanted redo the work as well as
delay projects and increase cost.

 Should know what the Scope of the Project is.


Sometimes non functional requirements of client are not feasible because of budget or
time constraint, so it’s always better to liaison with your PM to find out what is out of
scope so that all will be in the same page and avoid misunderstanding.
There is no Word called as “By Default”: In every requirement we have some Unique
specifications, hence we cannot consider anything as By Default. Also, we should never Imagine
something as by default by listening to client’s requirements, we must either acknowledge it or
probe it further.

Q14. Write the difference between packages and sub-systems


A package is a collection of headers and source files that provide related functionality.
A subsystem is a collection of one or more packages. For example, the Foundation subsystem
contains packages such as Layout, MVC, Events, Properties, Image, and Print.
Package: In UML models and Object Oriented Analysis, A package is a organised group of
elements. It can be termed as the UML mechanism for grouping things. It may contain many
structural things like classes, components and other packages in it.
It can be used to:
Group semantically related elements.
Define a semantic boundary in the model.
Provide units for parallel working and configuration management.
It is used to provide encapsulated namespace within which all names must be unique.

Subsystem: In UML models, subsystems are a type of stereotyped components that represent
independent, behavioral units of a system. They are widely used in class, component, and use
case diagrams to represent large-scale components that are to be modelled.
An entire system can be modelled by a hierarchy of subsytems.the behavior of each subsystem
can be defined by specifying the interfaces and operations that support interfaces in accordance
with subsystems.
Key differences between Package and Subsystems:
Q15. What is camel-casing and explain where it will be used
Camel case is a writing style where each word in a phrase is capitalized except for the first word,
and there are no spaces or punctuation. It's used in many places, including:
 Programming and web development: Camel case is a common naming convention for
variables, functions, and other elements. It's popular because it's easy to read and
understand.
 Company names: Some companies use camel case in their names or for their products
and systems, such as FedEx, PlayStation, PayPal, MasterCard, and PowerPoint.
 Acronyms and abbreviations: Camel case is used in many acronyms and abbreviations,
such as PhD.
The formal name for camel case is “medial capitals”. It was first used in 1813 by Swedish
chemist Jacob Berzelius to make it easier to write and identify chemicals.
CamelCase is a way to separate the words in a phrase by making the first letter of each word
capitalized and not using spaces. It is commonly used in web URLs, programming and
computer naming conventions. It is named after camels because the capital letters resemble the
humps on a camel's back.
The “camel case” is the practice of writing sentences so that each word or abbreviation in the
middle of the sentence begins with a capital letter, without spaces or punctuation. For example:
“iPad” and “eBay” The camel case is normally used for variable names in computer
programming. Some programming styles prefer uppercase and lowercase letters with the first
letter capitalized, others do not. The Camel case is distinct from the Title Case (or Capitalized
Case), which capitalizes all words, but maintains the spaces between them.
The format indicates the first word starting with either case, then the following words having an
initial uppercase letter. Common examples include YouTube, PowerPoint, HarperCollins, FedEx,
iPhone, eBay, and LaGuardia. Camel case is often used as a naming convention in computer
programming.

Q16. Illustrate Development server and what are the accesses does business analyst has?
A Development server is a type of server that is designed to facilitate the development and
testing of programs, websites, software, or applications for software programmers. It provides a
runtime environment, as well as all hardware/software utilities that are essential to program
debugging and development.
As a Business Analyst we have to access various Tools and Software’s.
 Tools We will be Accessing:
 Requirements management
 Project management
 Enterprise resource planning (ERP)
 Modeling / Diagramming
 Wireframing
 Collaboration / Communication
 Customer relationship management (CRM)
 Data visualization

 Business Analyst Software:


 Microsoft Office
 Wrike (Project Management Tool)
 Oracle NetSuite (Used for ERP)
 Pencil (Modeling & Diagramming Tool)
 Trello (Communication tool for stakeholders)
 Microsoft Visio, Tableau , Power BI

Q17. What is Data Mapping


Data mapping is the process of matching fields from one database to another. It's the first step
to facilitate data migration, data integration, and other data management tasks.
Data mapping bridges the differences between two systems, or data models, so that when data
is moved from a source, it is accurate and usable at the destination.
Following are the steps of Data mapping.
 Define: Defining the data to be moved, including tables, fields with each table, and the format
of the fields after it is moved. For integration Frequency is also defined.
 Map the Data: Matching Source fields to destination fields.
 Transformation: If Transformation is needed, formulas or rule is coded.
 Test: Using Test System, sample data is tested from Source data to run the transfer to see how
it works and adjust as necessary.
 Deploy: Once transfer of data is done, we can schedule a migration or integration to go live
Event.
 Maintain and Update: For ongoing integration, data mapping and updating is needed as
source data is always changed. Hence maintenance and updating is needed.
Here are some things to know about data mapping:
 Data mapping techniques: There are several techniques for data mapping, including
manual, spreadsheet-based, code-based, and automated:
o Manual data mapping: Involves connecting data sources and documenting the
process with code. This method is customized to specific needs, but it's labor-
intensive and error-prone.
o Automated data mapping: A tool that handles all aspects of the data mapping
process. This is a good option if you don't have access to a coder.
 Data transformation: The process of converting data into a more readable form. It's
often used in conjunction with data mapping.
 Data profiling tools: Used to discover and understand the data in its original format.

Q18. What is API. Explain how you would use API integration in the case of your application
Date format is dd-mm-yyyy and it is accepting some data from Other Application from US
whose Date Format is mm-dd-yyyy
API stands for Application Programming Interface, which is a set of rules and protocols that
allow different software applications to communicate with each other. APIs can be used to
integrate data, services, and capabilities from other applications.
Here are some steps you can take to integrate an API into an app:
1. Hire an API integration developer
2. Create a project within the API provider system
3. Receive the API key and authorization token
4. Integrate the API framework for the app
5. Use API request instances and methods

Application Programming Interface (API) is a software-to-software interface. APIs provide a


secure and standardized way for applications to work with each other and deliver the
information or functionality requested without user intervention.
An API, or application programming interface, is a set of defined rules that enable different
applications to communicate with each other. It acts as an intermediary layer that processes
data transfers between systems, letting companies open their application data and functionality
to external third-party developers, business partners, and internal departments within their
companies.