Montana Misora Homes Project Estimate
Montana Misora Homes Project Estimate
N Plumbing works
Roughing ins system and fixtures instn. (for award) 1.00 lot -
Fixtures including accessories(shower, lavatory, 1.00 lot -
closet and sink and faucets)
Septic tank 1.00 lot - 466,100.00
O Electrical works
Rough-ins. [Link] Center and Feeder lines 1.00 lot - 699,150.00
P Others
CR partion 1.00 lot -
PWD Hand rail 1.00 lot -
Engress/Ingress Pergola 85sq.m. 1.00 lot -
Column, beam, ceiling, roofing, finishes
Landscaping 1.00 lot - -
18,750.00
28,125.00
11,250.00
6,000.00
28,050.00
29,592.00
29,700.00
9,000.00
78,750.00
7,500.00 246,717.00
46,750.00
27,500.00
###
51,734.37
12,000.00 271,304.38
###
60,000.00
###
90,000.00
26,520.00 426,770.00
12,100.00
46,200.00
###
###
###
###
25,000.00
15,000.00
4,800.00
34,000.00
12,000.00
2,600.00
8,500.00
200.00 977,588.48
###
17,920.00
###
###
75,000.00
75,000.00 866,290.00
42,940.00
14,040.00
22,000.00
6,000.00
4,000.00
4,500.00
13,340.00
1,500.00
### 287,168.00
20,000.00
17,000.00
19,000.00
45,000.00
22,000.00
6,000.00
6,000.00
4,000.00
4,400.00
### 684,441.60
40,040.00
### - 207,625.00
19,800.00
13,500.00
54,600.00
7,480.00
11,600.00
4,560.00
650.00
15,000.00 127,190.00
72,000.00
40,500.00
2,800.00
300.00
300.00
300.00
300.00
300.00
1,600.00
2,670.00
2,400.00
3,600.00
750.00
1,350.00
3,615.00
2,730.00
1,666.00
1,564.00
2,150.00
2,100.00
3,600.00
1,650.00 148,245.00
### 600,000.00
###
###
75,000.00 790,000.00
### 700,000.00
6,451,231.86
1,032,197.10
129,024.64
7,612,453.59
ive, 8 units 54.00
761,245.36
14,097.14
4,782,383.86
0.22
0.24
#REF!
#REF!
Project : MONTANA MISORA HOMES
Location : Maddarulug Norte, Enrile, Cagayan
Subject: Standard Rehash for Townhouse ;BASIC BARE FINISH
Model/ Type: 8 Units (Block 5 Lots 2,4,6,8,10,12,14,16)-CLUSTER B
A Earthworks
Gravel bedding 20.47 m3 1100 ### ###
Soil treatment 2.40 lit 2000 4,800.00 27,313.92
B Form works
2 x 3 x 10 good lumber 40.00 pcs 246 9,840.00 ###
1 1/2 G.I. Pipe 40.00 pcs 900 ### ###
swivel clamp 1 1/2 240.00 pcs 65 ### ###
1/2 formplywood 32.00 pcs 650 ### ###
CWN # 2 16.00 kgs 80 1,280.00 ###
CWN # 3 16.00 kgs 80 1,280.00 ###
CWN # 4 16.00 kgs 80 1,280.00 ###
Tie wire #16 24.00 kgs 65 1,560.00 87,640.00
C Rebar works
Footing Ø16mm x 6.0 44.00 pcs 400 ### ###
Column Ø16mm x 6m 52.80 pcs 400 ### ###
Ø10mm x 6.0 70.40 pcs 150 ### ###
Wall Ftg Ø10mm x 6.0 32.00 pcs 150 4,800.00 ###
SOF Ø10mm x 6.0 140.80 pcs 150 ### ###
Garage Ø10mm x 6.0 72.00 pcs 150 ### ###
Service Area Ø10mm x 6.0 48.00 pcs 150 7,200.00 ###
Kit counter Ø10mm x 6.0 24.00 pcs 150 3,600.00 ###
Tie Beam Ø12mm x 6.0 67.20 pcs 400 ### ###
Ø10mm x 6.0 123.20 pcs 150 ### ###
Lintel Beams 48.00 pcs 150 7,200.00 ###
Masonry rebars 10 mmØ 392.80 pcs 150 ### ###
Sag rod 10mmx6m 16.00 pcs 150 2,400.00 ###
Tie wire #16 4.00 rolls 1,500 6,000.00 216,680
D Concrete works
Footing 3000psi G1 6.80 cu.m. 5,500 ### ###
Column 3000psi 3/4 4.08 cu.m. 5,500 ### ###
Wall footing 3000psi G1 3.84 cu.m. 5,300 ### ###
Slab on fill 2500psi G1 21.12 cu.m. 5,000 ### ###
Garage/service area 16.00 cu.m. 5,000 ### ###
Ftb 3000psi 3/4 6.50 cu.m. 4,200 ### ###
Gravel 3/4 bedding 9.60 cu.m. 1,000 9,600.00 302,675
E Second Floor
1.0 thk steel deck 208.00 sq.m. 600 ### ###
2x4x1/4 c-channel 16.00 pcs 3000 ###
Concrete 3000psi 3/4 15.60 sq.m. 5500 ### ###
6'x6"x 20ft. steel matting 24.00 pcs 3000 ### ###
Floor topping 12.48 cu.m. 2500 ### 361,800.00
F structural Steel works
Base Plate (250x350x13mm thk)-18pcs 858.00 kgs 43 ### ###
16mm x 500mm anchor bolt with nut and washe 72.00 pcs 350 ### ###
W6x25 (18pcsx6m)- columns 4,017.60 kgs 57 ### ###
W6x12 beams x 4m length 2,291.20 kgs 57 ### ###
W8x24, commom wall 2nd floor, 6m 1,928.34 kgs 57 ###
W8x18, 2nd flr commom wall extn. X 1m, 9 pcs 723.87 kgs 57 ###
W8x18, roof beam 9pcs x 9m 2,170.80 kgs 57 ###
Welding Rod 7018 40.00 kgs 500 ### ###
acetylene 8.00 tank 1900 ### ###
Oxygen 8.00 tank 550 4,400.00 ###
epoxy Primer w/ catalyst 32.00 gallons 850 ### ###
Lacquer thinner 16.00 gallons 600 9,600.00 ###
Paint Brush 32.00 pcs 65 2,080.00 ###
Grinding Disc 8.00 box 850 6,800.00 ###
Chalkstone 16.00 pcs 10 160.00 782,047.17
G Masonry works
CHB 5" 9,928.00 pcs 18 ### ###
CHB 4" 896.00 pcs 12 ### ###
Cement mortar 544.00 bags 235 ### ###
Cement Plaster 992.00 bags 235 ### ###
Sand for mortar 8.00 d/t 7500 ### ###
Sand for plaster 8.00 d/t 7500 ### 670,416.00
H Roofing works
2 x 3 x 1.45m C-purlins 44.00 pcs 520 ### ###
2 x 6 x 1.2mm C-purlins 14.40 pcs 780 ### ###
2 x 1/4 angle bar 16.00 pcs 1,350 ### ###
welding rod (2.5kgsper box) 16.00 boxes 200 3,200.00 ###
red oxide 8.00 gals 450 3,600.00 ###
8"x8 ft hardisenepa, 12mm 36.80 pcs 290 ### ###
hardiscrew 800.00 pcs 1.5 1,200.00 ###
prepainted longspan and accessories 264.00 m2 670 ### 251,264.00
I Doors and windows
2 x 6 x 0.9 door jamb 8.00 pcs 2,000 ### ###
2 x 4 x 0.8 door jamb 8.00 pcs 1,700 ### ###
PVC door .60 x2.1 8.00 pcs 1,900 ### ###
210 x 90 panel door 8.00 pc 4,500 ### ###
210 x 80 marine door 8.00 pc 2,200 ### ###
keyed lockset entrance 8.00 sets 600 4,800.00 ###
keyed lockset bedroom 8.00 sets 600 4,800.00 ###
keyless lockset 8.00 sets 400 3,200.00 ###
loosepin hinge 32.00 pairs 110 3,520.00 ###
Aluminum powdercoated casement windows with1,280.00 ft2 340 ### 549,920
J Moisture Protection
Elastomeric paint firewall 4.00 gals 750 3,000.00 3,000.00
K Ceiling works
Exterior ceiling-eaves 140.80 m2 550 ### ###
Interior ceiling 416.00 m3 550 ### - 306,240.00
L Tile works
Counter Tiles 60 x 60 72.00 pcs 320 ### ###
Floor tiles 30 x 30 280.00 pcs 45 ### ###
Wall tiles 30 x 30 840.00 pcs 45 ### ###
Tile Adhessives 24.00 bags 290 6,960.00 ###
Portland Cement 32.00 bags 235 7,520.00 ###
Tile Grout 1.60 pack 65 104.00 ###
Sand 0.80 d/t 7500 6,000.00 94,024.00
M Painting works
Flat Latex 28.00 tin 2,400 ### ###
Semi Gloss Latex 12.00 tin 2,700 ### ###
Concrete Neutralizer 8.00 gal 280 2,240.00 ###
raw sienna 2.00 lit 150 300.00 ###
hansa yellow 2.00 lit 150 300.00 ###
venetian red 2.00 lit 150 300.00 ###
toloudine red 2.00 lit 150 300.00 ###
lamp black 2.00 lit 150 300.00 ###
Quick dry Enamel 4.00 gal 580 2,320.00 ###
Paint Thinner 8.00 gal 320 2,560.00 ###
Patching Compound 4.00 sack 534 2,136.00 ###
Sanding paper #120 2.00 roll 1,200 2,400.00 ###
Sanding paper #100 2.00 roll 1,800 3,600.00 ###
rugs/basahan 16.00 kgs 75 1,200.00 ###
3/4 masking tape 24.00 pcs 45 1,080.00 ###
Sanding sealer 4.00 gals 723 2,892.00 ###
Wood stain mahogany 4.00 gals 546 2,184.00 ###
Lacquer primer surfacer 2.00 gals 833 1,666.00 ###
Lacquer flo 2.00 gals 782 1,564.00 ###
Automotive lacquer white 2.00 gals 1075 2,150.00 ###
Lacquer gloss enamel 2.00 gals 1050 2,100.00 ###
Laquer thinner 4.00 tins 728 2,912.00 ###
body filler with hardener 8.00 gals 210 1,680.00 ###
Paint Roller 40.00 pcs 90 3,600.00 ###
Paint brush 40.00 pcs 55 2,200.00 141,584
N Stairs
wooden Steps/railings 8.00 lot 60000 ### 480,000.00
O Plumbing works
Roughing ins system and fixtures instn. (for awar 8.00 lot 60000 ### ###
Fixtures including accessories(shower, lavatory, 8.00 lot 12500 ### ###
closet and sink and faucets)
Septic vault 8.00 lot 6500 ### 632,000.00
P Electrical works
Rough-ins. [Link] Center and Feeder line 8.00 lot 70000 ### 560,000.00
###
A Earthworks
Gravel bedding 20.47 m3 1100 ### ###
Soil treatment 2.40 lit 2000 4,800.00 27,313.92
B Form works
2 x 3 x 10 good lumber 40.00 pcs 246 9,840.00 ###
1 1/2 G.I. Pipe 40.00 pcs 900 ### ###
swivel clamp 1 1/2 240.00 pcs 65 ### ###
1/2 formplywood 32.00 pcs 650 ### ###
CWN # 2 16.00 kgs 80 1,280.00 ###
CWN # 3 16.00 kgs 80 1,280.00 ###
CWN # 4 16.00 kgs 80 1,280.00 ###
Tie wire #16 24.00 kgs 65 1,560.00 87,640.00
C Rebar works
Footing Ø16mm x 6.0 44.00 pcs 400 ### ###
Column Ø16mm x 6m 52.80 pcs 400 ### ###
Ø10mm x 6.0 70.40 pcs 150 ### ###
Wall Ftg Ø10mm x 6.0 32.00 pcs 150 4,800.00 ###
SOF Ø10mm x 6.0 140.80 pcs 150 ### ###
Garage Ø10mm x 6.0 72.00 pcs 150 ### ###
Service Area Ø10mm x 6.0 48.00 pcs 150 7,200.00 ###
Kit counter Ø10mm x 6.0 24.00 pcs 150 3,600.00 ###
Tie Beam Ø12mm x 6.0 67.20 pcs 400 ### ###
Ø10mm x 6.0 123.20 pcs 150 ### ###
Lintel Beams 48.00 pcs 150 7,200.00 ###
Masonry rebars 10 mmØ 392.80 pcs 150 ### ###
Sag rod 10mmx6m 16.00 pcs 150 2,400.00 ###
Tie wire #16 4.00 rolls 1,500 6,000.00 216,680
D Concrete works
Footing 3000psi G1 6.80 cu.m. 5,500 ### ###
Column 3000psi 3/4 4.08 cu.m. 5,500 ### ###
Wall footing 3000psi G1 3.84 cu.m. 5,300 ### ###
Slab on fill 2500psi G1 21.12 cu.m. 5,000 ### ###
Garage/service area 16.00 cu.m. 5,000 ### ###
Ftb 3000psi 3/4 6.50 cu.m. 4,200 ### ###
Gravel 3/4 bedding 9.60 cu.m. 1,000 9,600.00 302,675
E Second Floor
1.0 thk steel deck 208.00 sq.m. 600 ### ###
2x4x1/4 c-channel 16.00 pcs 3000 ###
Concrete 3000psi 3/4 15.60 sq.m. 5500 ### ###
6'x6"x 20ft. steel matting 24.00 pcs 3000 ### ###
Floor topping 12.48 cu.m. 2500 ### 361,800.00
F structural Steel works
Base Plate (250x350x13mm thk)-18pcs 858.00 kgs 43 ### ###
16mm x 500mm anchor bolt with nut and washe 72.00 pcs 350 ### ###
I Beams ### kgs 57 ###
Welding Rod 7018 40.00 kgs 500 ### ###
acetylene 8.00 tank 1900 ### ###
Oxygen 8.00 tank 550 4,400.00 ###
epoxy Primer w/ catalyst 32.00 gallons 850 ### ###
Lacquer thinner 16.00 gallons 600 9,600.00 ###
Paint Brush 32.00 pcs 65 2,080.00 ###
Grinding Disc 8.00 box 850 6,800.00 ###
Chalkstone 16.00 pcs 10 160.00 754,869.90
G Masonry works
CHB 5" 9,928.00 pcs 18 ### ###
CHB 4" 896.00 pcs 12 ### ###
Cement mortar 544.00 bags 235 ### ###
Cement Plaster 992.00 bags 235 ### ###
Sand for mortar 8.00 d/t 7500 ### ###
Sand for plaster 8.00 d/t 7500 ### 670,416.00
H Roofing works
2 x 3 x 1.45m C-purlins 44.00 pcs 520 ### ###
2 x 6 x 1.2mm C-purlins 14.40 pcs 780 ### ###
2 x 1/4 angle bar 16.00 pcs 1,350 ### ###
welding rod (2.5kgsper box) 16.00 boxes 200 3,200.00 ###
red oxide 8.00 gals 450 3,600.00 ###
8"x8 ft hardisenepa, 12mm 36.80 pcs 290 ### ###
hardiscrew 800.00 pcs 1.5 1,200.00 ###
prepainted longspan and accessories 264.00 m2 670 ### 251,264.00
I Doors and windows
2 x 6 x 0.9 door jamb 8.00 pcs 2,000 ### ###
2 x 4 x 0.8 door jamb 8.00 pcs 1,700 ### ###
PVC door .60 x2.1 8.00 pcs 1,900 ### ###
210 x 90 panel door 8.00 pc 4,500 ### ###
210 x 80 marine door 8.00 pc 2,200 ### ###
keyed lockset entrance 8.00 sets 600 4,800.00 ###
keyed lockset bedroom 8.00 sets 600 4,800.00 ###
keyless lockset 8.00 sets 400 3,200.00 ###
loosepin hinge 32.00 pairs 110 3,520.00 ###
Aluminum powdercoated casement windows with1,280.00 ft2 340 ### 549,920
J Moisture Protection
Elastomeric paint firewall 4.00 gals 750 3,000.00 3,000.00
K Ceiling works
Exterior ceiling-eaves 140.80 m2 550 ### ###
Interior ceiling 416.00 m3 550 ### - 306,240.00
L Tile works
Counter Tiles 60 x 60 72.00 pcs 320 ### ###
Floor tiles 30 x 30 280.00 pcs 45 ### ###
Wall tiles 30 x 30 840.00 pcs 45 ### ###
Tile Adhessives 24.00 bags 290 6,960.00 ###
Portland Cement 32.00 bags 235 7,520.00 ###
Tile Grout 1.60 pack 65 104.00 ###
Sand 0.80 d/t 7500 6,000.00 94,024.00
M Painting works
Flat Latex 28.00 tin 2,400 ### ###
Semi Gloss Latex 12.00 tin 2,700 ### ###
Concrete Neutralizer 8.00 gal 280 2,240.00 ###
raw sienna 2.00 lit 150 300.00 ###
hansa yellow 2.00 lit 150 300.00 ###
venetian red 2.00 lit 150 300.00 ###
toloudine red 2.00 lit 150 300.00 ###
lamp black 2.00 lit 150 300.00 ###
Quick dry Enamel 4.00 gal 580 2,320.00 ###
Paint Thinner 8.00 gal 320 2,560.00 ###
Patching Compound 4.00 sack 534 2,136.00 ###
Sanding paper #120 2.00 roll 1,200 2,400.00 ###
Sanding paper #100 2.00 roll 1,800 3,600.00 ###
rugs/basahan 16.00 kgs 75 1,200.00 ###
3/4 masking tape 24.00 pcs 45 1,080.00 ###
Sanding sealer 4.00 gals 723 2,892.00 ###
Wood stain mahogany 4.00 gals 546 2,184.00 ###
Lacquer primer surfacer 2.00 gals 833 1,666.00 ###
Lacquer flo 2.00 gals 782 1,564.00 ###
Automotive lacquer white 2.00 gals 1075 2,150.00 ###
Lacquer gloss enamel 2.00 gals 1050 2,100.00 ###
Laquer thinner 4.00 tins 728 2,912.00 ###
body filler with hardener 8.00 gals 210 1,680.00 ###
Paint Roller 40.00 pcs 90 3,600.00 ###
Paint brush 40.00 pcs 55 2,200.00 141,584
N Stairs
wooden Steps/railings 8.00 lot 60000 ### 480,000.00
O Plumbing works
Roughing ins system and fixtures instn. (for awar 8.00 lot 60000 ### ###
Fixtures including accessories(shower, lavatory, 8.00 lot 12500 ### ###
closet and sink and faucets)
Septic vault 8.00 lot 6500 ### 632,000.00
P Electrical works
Rough-ins. [Link] Center and Feeder line 8.00 lot 70000 ### 560,000.00
###