0% found this document useful (0 votes)
73 views1 page

Pages From Full BD Approval Drawing

The document outlines the proposed residential development project at Lohas Park Phase 11 in Tseung Kwan O, N.T. It includes details regarding the project management and design by AECOM Asia Company Ltd., along with the necessary building consent applications. The plans are submitted for fast track consent under the relevant building regulations.

Uploaded by

Haywood Cheung
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views1 page

Pages From Full BD Approval Drawing

The document outlines the proposed residential development project at Lohas Park Phase 11 in Tseung Kwan O, N.T. It includes details regarding the project management and design by AECOM Asia Company Ltd., along with the necessary building consent applications. The plans are submitted for fast track consent under the relevant building regulations.

Uploaded by

Haywood Cheung
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

ISO A1 594mm x 841mm

B.D. REFERENCE 3/7192/97/11 (C2)

PROJECT

PROPOSED RESIDENTIAL
DEVELOPMENT AT
H.L

LOHAS PARK PHASE 11


Approved:

TKOTL 70RP,
TSEUNG KWAN O,
C.L

N.T SITE C2
CLIENT
Checked:

SKY CASTLE LIMITED


C.L
Designer:
Project Management Initials:

AECOM Asia Company Ltd.


www.aecom.com

FOR INFORMATION ONLY


06/04/22 BD AMENDMENT OF B CL
B 06/04/22 GENERAL REVISION CL
PATH C:\Users\bryant.lee\OneDrive\OneDrive - AECOM\Lohas P11 Design Team\20220406 Tower 2nd Amendment\~Drawings (Bryant)\CAD\9120B.dwg

05/11/20 BD APPROVAL OF A CL
A 05/11/20 CORRECTION AT BD CL
- 31/08/20 BD SUBMISSION CL

BD SUBMISSION

A1 1 : 100 MILLIMETER

THE WORKS SHOWN ON THESE


PLANS ARE TYPE II WORKS
(SUPERSTRUCTURE TOWER 1 & 2)
IN RESPECT OF WHICH CONSENT
IS APPLIED FOR THE PURPOSE OF
FAST TRACK CONSENT
APPLICATION UNDER 60611001 -
06/04/2022

REGULATION33 OF THE BUILDING


(ADMINISTRATION) REGULATIONS.

AECOM Asia Company Limited


TYPICAL DETAILS FOR FLOORS
ABOVE 8/F
Plot File by: Bryant.lee

SHEET 4 OF 5
Wong Woon-ki
Registered Structural Engineer RSE 87/96

60611001 /9120B

You might also like