Clause# Checkpoint Status Description of Site
Provision/Comments
Is ducting within the compartment
having minimum fire rating of 30 min? If
[Link].4 such ducts crosses adjacent P Work is in progress.
compartment/floor and do not have fire
dampers, 120 min fire rating of ducting is
required?
Is the material used for insulation of duct
system (inside/outside) non- combustible? Non-combustible material used.
[Link].5 Is such insulating material not wrapped or C
secured by combustible material?
Are inspection panels provided in
[Link].6 ductwork? Is cleaning of accumulated C Yes
dust and maintenance of fire dampers
carried out?
Are fire dampers provided at following
locations? 1) Fire separation walls 2) where Fire damper Provided
ducts pass through vertical shafts 3) C
[Link].1 Where the ducts pass through floors 4) At
the inlet of supply air duct and the return air
duct of each compartment on every floor.
Are the dampers of motorized/fusible Motorized type damper
type? Are they accessible to test/maintain integration pending
[Link].2 and replace (if required)? Are they P
integrated with Fire Alarm
Panel?
Heating: Is installation of good practice
3.4.9 and chimney in accordance of with good NA
practice IS 1649:1962?
Is sufficient natural/mechanical
ventilation provided for boiler room? If
mechanical ventilation: Is it ensured that
120 min fire resistance rating ductwork NA
available if it has interface with other
mechanical areas? Is this not routed
through electrical room area or exit
[Link].2 corridor?
Pressure testing of refrigerant piping not NA
less than 450psi
VRF system charged with refrigerant NA
Is the floors of Equipment room finished
smooth. For floor loading, Airconditioning
4.3.2 Structure engineer/consultant should be NA
consulted (also Part-6 ' Structural Design,
Section-1:
Loads, Forces and Effects ' of the Code)
Is there PCC or RCC foundation for Pending
4.3.5 equipment and foundation protected with P
angle nosing
Page 5 of 25