Project Info
January 2020
TM
CC8
2
1740m
Longitudinal Layer
Banihal, J&K
IRCON Banihal
Installation Completion Photo
In January 2020, we were allotted work of slope erosion protection & ground
covering of affected area from KM 150/330 to 150/370 at USBRL Project,
Banihal J & K. We started the work from preparation of slope to remove
boulders, pebbles, etc & evenness of slope and ground. All preparation work
was done by IRCON in supervision of our site supervisors to get aesthetic view
only. Unfortunately before starting of actual Concrete Canvas installation,
snowfall happened in site area. After continuous 3day snowfall, we had chance
of 3-4 days to work, so we decided to take the risk and removed all snow by
mechanical means and after that installed concrete canvas on slope.
After that we stopped work for some time as January month is pick point of
winter season & snowfall predictions were conformed. We resume the work at
start of February month and had 10 days clear gap before any other snowfalls
or rains. In that 10days we installed concrete canvas 8mm thick on slope area
to protect erosion of slope as well as ground area to channelize water in near
drain. Hydration is done using lukewarm water so that CC can gain its proper
strength in cold weather. Total 1740sqm of Concrete Canvas 8mm was installed
under supervision of 3 SSPL staff members & 15 skilled labour team.
+ 91-9766634090 sspl@[Link] [Link]
Site Before Preparation Making slope angle
Snowfall after preparation Removing snow by JCB
+ 91-9766634090 sspl@[Link] [Link]
Site preparation & cleaning Side drain of slope
Concrete Canvas cutting Laying of Concrete Canvas
+ 91-9766634090 sspl@[Link] [Link]
Pegging on overlaps Screwing of overlaps
CC8 125sqm installation complete Snowfall again after installation
+ 91-9766634090 sspl@[Link] [Link]
Site after snowfall ends Complete installation on Slope area
Laying on ground area Complete installation view from top of slope
Complete installation view from top of slope
+ 91-9766634090 sspl@[Link] [Link]