0% found this document useful (0 votes)
110 views13 pages

Residential Commercial MSBS

The document outlines proposed fees for residential and commercial buildings, including development and processing charges based on site and built-up areas. Specific rates are provided for various categories, including amenities and external betterment charges, with different rates applicable for different site sizes and building heights. Additionally, it includes information on shelter fees and capitalization charges for larger developments.

Uploaded by

Bandari Ganesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
110 views13 pages

Residential Commercial MSBS

The document outlines proposed fees for residential and commercial buildings, including development and processing charges based on site and built-up areas. Specific rates are provided for various categories, including amenities and external betterment charges, with different rates applicable for different site sizes and building heights. Additionally, it includes information on shelter fees and capitalization charges for larger developments.

Uploaded by

Bandari Ganesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Fees for Residential & Commercial Buildings /Multi-storied Buildings (HMDA )

Proposed
Proposed Rates in
Rates in Rs.
Rs. Per [Link] For Government Order /
Sl. Checking Unit of Per [Link]
Budget Head Formula Commercial/Non- Internal Order /
No constraint Assessment For
Residential Memo
Residential
Projects
Projects
Development charges for NET SITE 1 [Link] of site Net site Area * [Link]. 223, dt.
1 80.00 100.00
site area: AREA area Rate 30.08.2016
Net site Area * Proc No.
Processing charges for Site NET SITE 1 [Link] of site
2 Rate 10.00 10.00 2419/P8/Plg/HMDA/201
area: AREA area
2, dt. 21.03.2012
Development charges for 1 [Link] of [Link]. 223, dt.
3 Built-up area Built-up area * Rate 100.00 120.00
Residential built up area: Built-up area 30.08.2016

Processing charges for Built Proc No.


1 [Link] of
4 up area including amenities Built-up area Built-up area * Rate 25.00 25.00 2419/P8/Plg/HMDA/201
Built-up area
built up area: 2, dt. 21.03.2012

Development charges for 1 [Link] of Amenties Built-up [Link]. 223, dt.


5 Built-up area 120.00 -
amenities built up area: Built-up area area * Rate 30.08.2016
[Link].
NET SITE
6 Publication charges FLAT FEE 5000 5000 11111/P8/HUDA/97,
AREA
dt.18.08.1999
Shelter fee for areas within
Municipalities and Gram
Panchayats & in case of
20% of Net site area
Site area more than 3000 400.00
x Rs.400/- per sq.m
Sqm:
(if EWS/LIG units are not
provided)
Shelter fee for areas within
Selection and special Grade
Muncipalities in case of Site NET SITE 1 [Link] of site 20% of Net site area [Link].7,
7 500.00 -
area more than 3000 Sqm: AREA area x Rs.500/- per sq.m dt.05.01.2016
(if EWS/LIG units are not
provided)

Shelter fee for areas within


Municipal Corporations & in
20% of Net site area
case of Site area more than 600.00
x Rs.600/- per sq.m
3000 Sqm:
(if EWS/LIG units are not
provided)
Shelter fee for within
ORRGC & in case of Site
20% of Net site area
area more than 3000 Sqm: 750.00
x Rs.750/- per sq.m
(if EWS/LIG units are not
provided)
3% Capitalization Charges
applicable if the site area is
4000 Sqm and above (in [Link]. 526, dt.
case Group Housing 3% of Net Site area 31.07.2008
Market Value
Schemes which include NET SITE 1 [Link] of in [Link] x 1.5 x [Link]. 527, dt.
8 per [Link] as -
Appartment Block/Blocks, AREA site area Market Value per 31.07.2008
per SRO
Row Housing, Cluster [Link] [Link]. 528, dt.
Housing, Mixed Housing 31.07.2008
units, Gated developements
& Residential Enclaves).
External Betterment Charges 1 [Link] of site (Net site Area -
Plot area 50.00 50.00
for Group Housing schemes/ area Plinth area) * rate
cluster housing/ colony type
development/ enclaves, [Link]. 287, dt.
9
residential, commercial, 1 [Link] of 03.04.2008
Built-up area Built-up area * Rate 25.00 25.00
office use etc. Built-up area
(if site is falling under
HADA)
External Betterment Charges
for institutional ,
educatiional buildings,
recreational use/ buildings NET SITE 1 [Link] of site Net site Area * [Link]. 287, dt.
10 - 10.00
and other category of uses/ AREA area Rate 03.04.2008
buildings not covered above
(if site is falling under
HADA)
Memo No.
Value additional charges 1 [Link] of
11 Built-up area Built-up area * Rate 100.00 100.00 22897/M1/2011, dt.
(if site is falling under CDA) Built-up area
24.01.2013
1) Above 15m 1) Above 15m and
and upto 17 upto 17 floors - Rs.
floors - Rs. 175 250 (Gram Panchayat
[Link].168,
(Gram Area)
dt.07.04.2012 and
City Level Inrastructure Panchayat 2) Above 17 floors -
1 [Link] of amended [Link]. 7,
12 Impact fee (other than Built-up area Built-up area * Rate Area) Rs. 500 (Gram
Built-up area dt.05.01.2016,
ORRGC)) 2) Above 17 Panchayat Area)
[Link]. 278, dt.
floors - Rs. 350 3) Above 15m and
06.07.2020
(Gram upto 17 floors - Rs.
Panchayat 500 (Municipalities)
Area) 4) Above 17 floors -
3) Above 15m Rs. 1000
and upto 17 (Municipalities)
floors - Rs. 250
(Municipalities)
4) Above 17
floors - Rs. 500
(Municipalities)
Stretch of Stretch of ORRGC
ORRGC Zone-A(SDZ-1)
Zone-A(SDZ- (from Muttangi
1) Junction on NH9 to
(from Muttangi Bongulur Junction on
Junction on Nagarjuna
NH9 to Sagar Highway)
Bongulur 1) Building height upto
Junction on 10 mts Built up area
Nagarjuna (sq.m)xRs.150/-
Sagar Highway) 2) Building height 10
1) Building mts & upto 15 mtrs
height upto 10 Built up area
mts Built up sq.m)xRs.200/-
area 3) Above 15m and
(sq.m)xRs.75/- upto 17 floors - Rs.
2) Building 250 X 1.25 times
height 10 mts & (Gram Panchayat [Link]. 470, dt.
Special Impact Fee (For 1 [Link] of upto 15 mtrs Area) 09.07.2008 and
13 Built-up area Built-up area * Rate
sites falling under ORRGC): Built-up area Built up area 4) Above 15m and amended [Link]. 9,
sq.m)xRs.100/- upto 17 floors - Rs. dt. 05.01.2016
3) Above 15m 500 X 1.25 times
and upto 17 (Municipalities)
floors - Rs. 175 5) Above 17 floors -
X 1.25 times Rs. 500 X 1.25 times
(Gram (Gram Panchayat
Panchayat Area)
Area) 6) Above 17 floors -
4) Above 15m Rs. 1000 X 1.25 times
and upto 17 (Municipalities)
floors - Rs. 250 Zone-A(SDZ-2)
X 1.25 times 1) Building height upto
(Municipalities) 10 mts Built up area
5) Above 17 (sq.m)xRs.100/-
floors - Rs. 350 2) Building height 10
X 1.25 times mts & upto 15 mtrs
(Gram Built up area
Panchayat (sq.m)xRs.150/-
Area) 3) Above 15m and
6) Above 17 upto 17 floors - Rs.
floors - Rs. 500 250 X 1.20 times
X 1.25 times (Gram Panchayat
(Municipalities) Area)
Zone-A(SDZ- 4) Above 15m and
2) upto 17 floors - Rs.
1) Building 500 X 1.20 times
height upto 10 (Municipalities)
mts Built up 5) Above 17 floors -
area Rs. 500 X 1.20 times
(sq.m)xRs.50/- (Gram Panchayat
2) Building Area)
height 10 mts & 6) Above 17 floors -
upto 15 mtrs Rs. 1000 X 1.20 times
Built up area (Municipalities)
(sq.m)xRs.75/- Zone-B(SDZ-1)
3) Above 15m (from Bongulur
and upto 17 Junction on Nagarjuna
floors - Rs. 175 Sagar Highway to
X 1.20 times Shamirpet – Upparpalli
(Gram Junction, on
Panchayat Karimnagar Highway)
Area) 1) Building height upto
4) Above 15m 10 mts Built up area
and upto 17 (sq.m)xRs.100/-
floors - Rs. 250 2) Building height 10
X 1.20 times mts & upto 15 mtrs
(Municipalities) Built up area
5) Above 17 (sq.m)xRs.150/-
floors - Rs. 350 3) Above 15m and
X 1.20 times upto 17 floors - Rs.
(Gram 250 X 1.15 times
Panchayat (Gram Panchayat
Area) Area)
6) Above 17 4) Above 15m and
floors - Rs. 500 upto 17 floors - Rs.
X 1.20 times 500 X 1.15 times
(Municipalities) (Municipalities)
Zone-B(SDZ- 5) Above 17 floors -
1) Rs. 500 X 1.15 times
(from Bongulur (Gram Panchayat
Junction on Area)
Nagarjuna 6) Above 17 floors -
Sagar Highway Rs. 1000 X 1.15 times
to (Municipalities)
Shamirpet –
Upparpalli
Junction, on
Karimnagar
Highway)
1) Building
height upto 10
mts Built up
area
(sq.m)xRs.50/-
2) Building
height 10 mts &
upto 15 mtrs
Built up area
(sq.m)xRs.75/-
3) Above 15m
and upto 17
floors - Rs. 175
X 1.15 times
(Gram
Panchayat
Area)
4) Above 15m
and upto 17
floors - Rs. 250
X 1.15 times
(Municipalities)
5) Above 17
floors - Rs. 350
X 1.15 times
(Gram
Panchayat
Area)
6) Above 17
floors - Rs. 500
X 1.15 times
(Municipalities)
Zone-B(SDZ- Zone-B(SDZ-2)
2) 1) Building height upto
1) Building 10 mts Built up area
height upto 10 (sq.m)xRs.75/-
mts Built up 2) Building height 10
area mts & upto 15 mtrs
(sq.m)xRs.40/- Built up area
2) Building (sq.m)xRs.100/-
height 10 mts & 3) Above 15m and
upto 15 mtrs upto 17 floors - Rs.
Built up area 250 X 1.10 times
(sq.m)xRs.50/- (Gram Panchayat
3) Above 15m Area)
and upto 17 4) Above 15m and
floors - Rs. 175 upto 17 floors - Rs.
X 1.10 times 500 X 1.10 times
(Gram (Municipalities)
Panchayat 5) Above 17 floors -
Area) Rs. 500 X 1.10 times
4) Above 15m (Gram Panchayat
and upto 17 Area)
floors - Rs. 250 6) Above 17 floors -
X 1.10 times Rs. 1000 X 1.10 times
(Municipalities) (Municipalities)
5) Above 17 Zone-C(SDZ-1)
floors - Rs. 350 (from Shamirpet –
X 1.10 times Upparpalli Junction, on
(Gram Karimnagar Highway
Panchayat to Muttangi Junction
Area) on NH9)
6) Above 17 1) Building height upto
floors - Rs. 500 10 mts Built up area
X 1.10 times (sq.m)xRs.75/-
(Municipalities) 2) Building height 10
Zone-C(SDZ- mts & upto 15 mtrs
1) Built up area
(from (sq.m)xRs.100/-
Shamirpet – 3) Above 15m and
Upparpalli upto 17 floors - Rs.
Junction, on 250 X 1.05 times
Karimnagar (Gram Panchayat
Highway to Area)
Muttangi 4) Above 15m and
Junction on upto 17 floors - Rs.
NH9) 500 X 1.05 times
1) Building (Municipalities)
height upto 10 5) Above 17 floors -
mts Built up Rs. 500 X 1.05 times
area (Gram Panchayat
(sq.m)xRs.40/- Area)
2) Building 6) Above 17 floors -
height 10 mts & Rs. 1000 X 1.05 times
upto 15 mtrs (Municipalities)
Built up area Zone-C(SDZ-2)
(sq.m)xRs.50/- 1) Building height upto
3) Above 15m 10 mts Built up area
and upto 17 (sq.m)xRs.50/-
floors - Rs. 175 2) Building height 10
X 1.05 times mts & upto 15 mtrs
(Gram Built up area
Panchayat (sq.m)xRs.75/-
Area) 3) Above 15m and
4) Above 15m upto 17 floors - Rs.
and upto 17 250 (Gram Panchayat
floors - Rs. 250 Area)
X 1.05 times 4) Above 15m and
(Municipalities) upto 17 floors - Rs.
5) Above 17 500 (Municipalities)
floors - Rs. 350 5) Above 17 floors -
X 1.05 times Rs. 500 (Gram
(Gram Panchayat Area)
Panchayat 6) Above 17 floors -
Area) Rs. 1000
6) Above 17 (Municipalities)
floors - Rs. 500
X 1.05 times
(Municipalities)
Zone-C(SDZ-
2)
1) Building
height upto 10
mts Built up
area
(sq.m)xRs.30/-
2) Building
height 10 mts &
upto 15 mtrs
Built up area
(sq.m)xRs.40/-
3) Above 15m
and upto 17
floors - Rs. 175
(Gram
Panchayat
Area)
4) Above 15m
and upto 17
floors - Rs. 250
(Municipalities)
5) Above 17
floors - Rs. 350
(Gram
Panchayat
Area)
6) Above 17
floors - Rs. 500
(Municipalities)
a) 1st
yearGrace
a) 1st yearGrace
period
period
b) 2nd year -
b) 2nd year - Rs.2/- [Link]. 470, dt.
Deferment charges(If the NET LAYOUT 1 [Link] of site Net site Area * Rs.2/-
14 c) 3rd year - Rs.5/- 09.07.2008 and Note of
site area covered in ORRGC) AREA area Rate c) 3rd year -
d) From date of HGCL dt. 23.11.2016
Rs.5/-
operation of traffic -
d) From date of
Rs.10/-
operation of
traffic - Rs.10/-
0-100 - 0-100 - Rs.5,00,000/-
Rs.5,00,000/- 101-200 - Rs.
101-200 - Rs. 10,00,000/-
10,00,000/- 201-300 - Rs.
201-300 - Rs. 15,00,000/-
15,00,000/- 301-400 - Rs.
Length of Grid 301-400 - Rs. 20,00,000/-
road aligned in 20,00,000/- 401-500 - Rs.
Grid Road Charges(If the
the 401-500 - Rs. 25,00,000/- Minutes of the meeting
15 site is affected by ORR Grid RMTS -
applicant/devel 25,00,000/- 501-600 - Rs. HGCL, dt. 28.09.2013
Road)
opers site in 501-600 - Rs. 30,00,000/-
mts 30,00,000/- 601-700 - Rs.
601-700 - Rs. 35,00,000/-
35,00,000/- 701-800 - Rs.
701-800 - Rs. 40,00,000/-
40,00,000/- 801-900 - Rs.
801-900 - Rs. 45,00,000/-
45,00,000/- 901-1000 - Rs.
901-1000 - Rs. 50,00,000/-
50,00,000/- 1000 & above - Rs.
1000 & above - 50,00,000/-
Rs. 50,00,000/- 75% of above charges
75% of above to be collected in case
charges to be if applicant getting
collected in access from one side
case if only/part of the grid
applicant road
getting access
from one side
only/part of the
grid road
Plot amalgamation/plot
Total Plot area x
subdivision charges ,(if the
Rs.10/- per sq.m or Rs.10/- per sq.m or
proposal is having more O.O.
NET SITE 1 [Link] of site minimum of minimum of
16 than one plot or if the plot is Rs. 10 2419/P8/HMDA/2012,
AREA area Rs.10,000/- Rs.10,000/-(whichever
subdivided ) dt. 04.08.2012
(whichever is is greater)
Consolidation charges
greater)
applicable :
If Plots fall under HADA
Area
Plot amalgamation/plot
Rs.50/- per sq.m or
subdivision charges ,(if the
NET SITE 1 [Link] of site Total Plot area x minimum of [Link].287, dt.
17 proposal is having more Rs. 50
AREA area Rs.50/- per sq.m Rs.10,000/-(whichever 03.04.2008
than one plot or if the plot is
is greater)
subdivided )
Consolidation charges
applicable :
Note 1:if the work Total applicable fees
AP Ordinance dt.
commenced on the Site: & Charges x 33%
18 - - - - 15.12.2007 section
Compounding fee
455A(c)
applicable:
Note 2 :If Not Paid within Total fees applicable
the stipulated period to levy x 10%/365=------- section 46(1) of HMDA
19 - - - -
10% interest per annum Rs/-Per day(For Act, 2008
shall be collected : delay period)
Total Built Up Area+ [Link].34, dt.
Environment Impact Fee: Site area + 17.06.2015 and Memo
20 - [Link] 3 per [Link]. 3 per [Link].
(If built up area is more Cellars/Stilt area in No. 106/MR/2015, dt.
than 10,000 sft) sft x Rate 23.06.2015
FSIDF (Fire Structure Built up area x Rate from 12m from 12m height to
Proc No.
Infrastructure Development 1 [Link] of height to 18m 15m - Rs.3.00/-
21 Built-up area 2297/Misc/CDA/2016,
Fund) If Height of the Built-up area - Rs.3.00/- 15m height to 30m -
dt. 30.04.2006
Building is above 12 Mtrs 18m height to Rs. 5.00/-
30m - Rs. Above 30m height -
5.00/- Rs. 10.00/-
Above 30m
height - Rs.
10.00/-
Proportionate Layout
Total Plot [Link].
charges if the site is a piece NET SITE 1 [Link] of
22 area(sq.m) x 1.67 x Rs. 90 110.00 5425//Policy/P8/Plg/HM
of land (Less than 4000 AREA Built-up area
Rate DA/2011, dt. 29.06.2012
Sqm)
Proportionate Layout
Total Plot [Link].
charges if the site is a piece NET SITE 1 [Link] of
area(sq.m) x 1.67 x Rs. 90 - 5425//Policy/P8/Plg/HM
of land and Residential AREA Built-up area
Rate DA/2011, dt. 29.06.2012
project
Shortfall of Openspace Total Plot
Charges if the site is apiece area([Link]) x Market Value [Link].
NET SITE 1 [Link] of Market Value per
23 of land or part of 14%X Market Value per Sqyrd as 5425//Policy/P8/Plg/HM
AREA site area Sqyrd as per SRO
unapproved layout (Less per Sqyrd as per per SRO DA/2011, dt. 29.06.2012
than 4000 Sqm) SRO
LRS charges: plot area x Rs ------ Table I: Plot Table I: Plot Area in
(if the site is apiece of land (rate as per table no Area in Sq. mt Sq. mt Basic
or part of unapproved -I with respect to Basic Regularization Charges
layout) plot area)=Rs------x Regularization Rs per Sq. mt Less
------%(percentage Charges Rs per than 100
1 [Link] of site as per market value Sq. mt Less - 200
Plot area
(a) Penalization charges = area of land as per table than 100 101 to 300 -
no II) = Rs------- - 200 400
20% surcharge=(i) 101 to 300 301 to 500 - 600
(b) Surcharge
x 20%=-------- - 400 Above 500 -
(a)+ (b) = Total 301 to 500 750
(a)+ (b) = Total amount.
amount. - 600 Slums 5 (irrespective
[Link]. 135, dt.
Above 500 of plot area and land
16.09.2020 and Memo
24 - 750 value)
No. 14148/[Link]/2020,
Slums 5 Table II: Market
dt.30.12.2020
(irrespective of value of the land as on
plot area and 28.10.2015 (Sub
land value) Register value) in Rs
Table II: per Square Yard
(ii)Compounding fee: Total
- - - Market value of Regularization Charges
amount x 33.3%.
the land as on (% of basic
28.10.2015 regularization charges
(Sub Register )
value) in Rs per Below 3000 - 20%
Square Yard 3001 to 5000 - 30%
Regularization 5001 to 10000 - 40%
Charges (% of 10,001 to 20,000 -
basic 50%
regularization 20,001 to 30,000 -
charges ) 60%
Below 3000 30,001 to 50,000 -
- 20% 80%
3001 to 5000 Above 50,000 100%
- 30%
5001 to 10000
- 40%
10,001 to
20,000 - 50%
20,001 to
30,000 - 60%
30,001 to
50,000 - 80%
Above 50,000
100%
NOC charges for petrol NET SITE
25 FLAT FEE - - 10000.00
bunk/ pump AREA
NOC charges for LPG NET SITE
26 FLAT FEE - - 10000.00
Godown AREA
25000 or Rs.5/- per
NOC charges for cinema NET SITE
27 FLAT FEE - - [Link] which ever is
theatres AREA
higher
NOC charges for weigh NET SITE
28 FLAT FEE - - 10000.00
bridge AREA
NOC charges for storage
NET SITE
29 of kerosene and FLAT FEE - - 10000.00
AREA
hazardous material
NOC charges for storage
NET SITE
30 of explosives for mining FLAT FEE - - 10000.00
AREA
and quarrying

Rs. 40/-
Applicable in
case of non-
highrise
NET SITE 1 [Link] of site (Net site area x [Link].106,
31 Road Impact Fee buildings -
AREA area Rate) dt.06.07.2020
having road
width less than
18 Mtrs and
having more
than 100 flats
[Link]. 102,
dt.03.07.2021
Commercial Road Impact (Applicable for proposed
32
Fee commercial roads in
Puppalguda and
Kokapet area)
Built-up area a) For Plot area
above 500
[Link] in
Kokapet(V):
i) Rs.20/- per a) For Plot area above
square feet of 500 [Link] in
Built up area Kokapet(V):
where the i) Rs.20/- per square
applications are feet of Built up area
received before where the applications
31.03.2022. are received before
ii) Rs.35/- per 31.03.2022.
square feet of ii) Rs.35/- per square
Built up area feet of Built up area
where the where the applications [Link]. 205,
Kokapet Betterment / User applications are are received after dt.25.11.2021 &
33 1 sft Built-up area * Rate
Charges received after 31.03.2022. amended [Link].
31.03.2022. 10, dt. 13.01.2022
b) For other Growth
b) For other corridor areas except
Growth corridor Kokapet(V), 50% of
areas except above charges.
Kokapet(V),
50% of above c) For smaller plots
charges. beyond 75 [Link] &
upto 500 [Link], it
c) For smaller will be 50% of above
plots beyond 75 rates.
[Link] & upto
500 [Link], it
will be 50% of
above rates.
Built-up area First Revision -
15 % of
Processing
Charges First Revision - 15 %
Second of Processing Charges
Revision - 20 % Second Revision - 20
1 [Link] of of Processing % of Processing [Link].
34 Revision Charges Built-up area & Charges Charges 8333/P8/Plg/HMDA/201
site area Third Revision - Third Revision - 25 % 2, dt.03.07.2013
25 % of of Processing Charges
Processing Additional 10 % for
Charges subsequent revisions
Additional 10 %
for subsequent
revisions
20% of
(Developemnt
charges of site 20% of (Developemnt
area + charges of site area + [Link].
NET LAYOUT 1 [Link] of site
35 Revalidation Charges Processing Processing Charges of 8333/P8/Plg/HMDA/201
AREA area
Charges of Site Site area + Publication 2, dt. 28.02.2015
area + Charges)
Publication
Charges)
Built-up area Rs. 50/-
For site falling Rs. 50/-
within 200 Mtrs For site falling within
from the edge 200 Mtrs from the
of the right of edge of the right of
Special Development way way
[Link]. 466, dt.
36 Charges for Missing Link 1 sft Built-up area * Rate
12.07.2022
roads / Slip roads Rs. 25/- Rs. 25/-
For site falling For site falling 201
201 Mtrs - 500 Mtrs - 500 Mtrs from
Mtrs from the the edge of the right
edge of the of way
right of way

You might also like