Format No.
: KECL/QC/02 National Highways Authority of India
Rev : 01
Project:- Four/Six laning of Bodhre to Dhule section from Km 390.00 to Km 457.231.00 (design chainage) of NH-211
(New NH-52) (design length 67.231 kms) in the state of Maharastra under Bharat mala Pariyojana on Hybrid annuity
mode.
Client National Highways Authority of India
Independent EngineerLEA Associates South Asia Pvt. Ltd.
Concessionaire Kalthia Dhule Chalisgaon Highway Pvt. Ltd.
EPC Contractor Kalthia Engineering & Construction Limited
GRAIN SIZE ANALYSIS
IS: 2720 (Part 4 )
Source Date of Sampling
Chainage/ Location Date of Testing
Layer Type of Material
Weight of sample
Weight of material Cum. Weight
IS sieve % Cumulative
retained retained % Passing
(mm) weight retained
(gm) (gm)
75
19
4.75
2.00
0.425
0.075
Gravel (Soil Particles > 4.75mm) in %
Sand (Soil Particles < 4.75 & > 0.075mm) in %
Silt & Clay (Soil Particles < 0.075mm) in %
Remarks
EPC Representative Concessionaire Representative IE Representative