Grade 4 Classroom Flooring Renovation

The Classroom Flooring Renovation Project for Grade 4-Apitong aims to improve safety and aesthetics in the classroom by replacing outdated flooring. The project seeks funding for a total estimated cost of 6,000.00, with implementation planned for March-April 2025. The proposal is prepared by Ron Mark V. Grabador and approved by Principal Raquel A. Abu EdD.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views1 page

Grade 4 Classroom Flooring Renovation

The Classroom Flooring Renovation Project for Grade 4-Apitong aims to improve safety and aesthetics in the classroom by replacing outdated flooring. The project seeks funding for a total estimated cost of 6,000.00, with implementation planned for March-April 2025. The proposal is prepared by Ron Mark V. Grabador and approved by Principal Raquel A. Abu EdD.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

BENITO SOLIVEN SOUTH DISTRICT

VILLALUZ INTEGRATED SCHOOL

Project Name: Classroom Flooring Renovation Project of Grade 4-Apitong

Objective:

 Improve the overall safety of the classroom.


 Enhance the classroom’s aesthetics, creating a more conducive learning environment.

Purpose:

 The purpose of this proposal is to request approval and funding for the renovation of
classroom flooring in Grade 4 Apitong. The current flooring is outdated and worn out,
affecting both the aesthetic appeal and safety of the learning environment. This
project aims to rehabilitate the existing flooring with a durable, safe, and easy-to-
maintain solution.

Date of Implementation: March-April 2025

Materials and Budget Estimate


Item Description Estimated Cost
Flooring Material Cement 4,500.00

Sand 1,500.00
Labor Costs Installation and finishing 0.00/HRPTA

Total Estimated Cost 6,000.00

Prepared by: Ron Mark V. Grabador Approved by: Raquel A. Abu EdD.
Class Adviser Principal 1