SCOPE OF WORK
Scope of work includes the AMC of lifts installed at various places of IIT
Kanpur
a) Maintenance schedule of lift
Sr. Description of Item Monthly Remarks
No.
1. Checking control accessories
2. Checking car and hall buttons
3. Checking indication bulbs
4. Checking safety points
5. Checking the levelling
6. Checking gear oil level &
Lubrication of main motor bearing
7. Checking selection apparatus
8. Checking brake spring & brake
drum
9. Lubrication governor pulleys
10. Checking car gate & landing gate
shoes
11. Checking leakage of oil
12. Checking car light and shaft light
13. Checking emergency light and
hooter
14. Checking car telephone and
readiness of emergency operations
15. Cleaning of door guide shoe
grooves of oil
16. Checking of fireman switch
17. Lubrication defector pulley,
selector pulley & support bearing
of main pulley
18. Checking Ventilation duct of AC
Motor
19. Checking worn gear & Its alignment
20. Adjustment speed of door
separator motor
21 Checking brake linings
22. Checking main / governor rods
23. Adjusting landing gate & safety
gear
24. Checking over speed switch of
governor
25. Lubrication guide rail shoes &
adjust guide shoes
26. Checking emergency key
27. Checking slowing/ final switches
28. Lubricate louvers of break
assembly
29. Checking shaft light and replace
bulbs if required
30. Checking machine room lighting DB
and switch board
31. Checking incoming TPN, Fuses &
connections
b) Timelines for rectification
Sr. Description of Item No. of days
No.
1. Rewinding of motors, replacement of brush 05 days
bearing, repairing of armature
2. Replacement o f c a r b o n brush, rectified, repair/ 01 day
r e p l a c e m e n t o f thermistor panel
3. Repair of gear box 04 days
4. Replacement of steel rope chain tape of selector 02 days
governor, sheave
5. Replacement of brake shoe lining 01 day
6. Replacement of trailing cable 03 days
7. Rewinding, repair of brake motor, gear drive 03 days
8. Replacement of burnt/ defective cards 02 days
9. Replacement of main drive 05 days
Note: Institute is planning to have a dashboard for monitoring of all the
installed lifts. The successful bidder should extend the required access of
communication port (RS- 485 or TCP/IP or Modbus) and make the data (lift
operating condition and lift loading condition etc.) available to the
institute without any additional cost.